Item |
Description |
Unit of Measure |
Estimated Quantity |
1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MTH) |
MTH |
3 |
3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
4 |
IMPLEMENTATION OF BMPS |
LS |
1 |
5 |
TRAFFIC CONTROL |
LS |
1 |
6 |
PREPARATION OF TRAFFIC CONTROL PLANS (CITIES) |
LS |
1 |
7 |
CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $20,000) |
AL |
20,000 |
8 |
FLASHING ARROW SIGN |
EA |
2 |
9 |
CHANGEABLE MESSAGE SIGN |
EA |
2 |
10 |
OFFICE FACILITIES |
LS |
1 |
11 |
MOBILIZATION |
LS |
1 |
12 |
CLEARING AND GRUBBING |
LS |
1 |
13 |
CONCRETE REMOVAL (NON-REINFORCED) |
CY |
347 |
14 |
CONCRETE REMOVAL (REINFORCED) |
CY |
5 |
15 |
UNCLASSIFIED EXCAVATION |
CY |
1,095 |
16 |
IMPORTED BORROW |
CY |
30 |
17 |
STABILIZATION GEOTEXTILE |
SY |
725 |
18 |
CRUSHED MISCELLANEOUS BASE |
CY |
522 |
19 |
TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
CY |
35 |
20 |
COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
SF |
681,000 |
21 |
AC PAVEMENT(PATCH BACK) |
TON |
129 |
22 |
AC PAVEMENT(DIGOUTS) |
TON |
271 |
23 |
AC PAVEMENT(LEVELING COURSE) |
TON |
169 |
24 |
RECONSTRUCT MANHOLE |
EA |
1 |
25 |
DOUBLE ADJUST MANHOLE |
EA |
23 |
26 |
PCC PAVEMENT (BUS PAD) |
CY |
98 |
27 |
ASPHALT RUBBER HOT MIX |
TON |
5,879 |
28 |
ASPHALT RUBBER HOT MIX (TEST STRIP) |
TON |
500 |
29 |
ASPHALT RUBBER AND AGGREGATE MEMBRANE |
SY |
75,602 |
30 |
CATCH BASIN MANHOLE FRAME AND COVER |
EA |
1 |
31 |
PCC CURB & GUTTER, TYPE A2-6 |
LF |
314 |
32 |
PCC CURB & GUTTER, TYPE A2-8 |
LF |
1,455 |
33 |
PCC CURB & GUTTER, TYPE A3-6 |
LF |
314 |
34 |
PCC WALK, DRIVES & CURB RAMPS, 4" THICK |
SF |
15,767 |
35 |
DETECTABLE WARNING SURFACE |
SF |
1,110 |
36 |
CROSS GUTTER |
CY |
49 |
37 |
ALLEY INTERSECTION |
CY |
6 |
38 |
FURNISH AND PLANT 15 GALLON TREE |
EA |
13 |
39 |
RECONSTRUCT PARKWAY CULVERT PER SECTION K-K ON SHEET 8 |
LS |
1 |
40 |
RECONSTRUCT RAIL TOP BOX CULVERT PER SECTION L-L ON SHEET 8 |
LS |
1 |
41 |
RECONSTRUCT LOCAL DEPRESSION PER STD PLAN 313-3 CASE E |
EA |
3 |
42 |
CLASS "A" TOP SOIL |
CY |
4 |
43 |
STORM WATER FILTRATION BASIN |
EA |
10 |
44 |
COMPACTED FILL |
CY |
62 |
45 |
NO. 3 CONCRETE AGGREGATE |
CY |
98 |
46 |
6" SCH 80 PVC PIPE |
LF |
652 |
47 |
60 MIL HDPE LINER |
SY |
309 |
48 |
2" CONDUIT (SCH 80 PVC) |
LF |
1,345 |
49 |
3" CONDUIT (SCH 80 PVC) |
LF |
555 |
50 |
2-PAIR DETECTOR LEAD-IN CABLE |
LF |
4,900 |
51 |
NO. 5 PULL BOX INCL PCC COVER |
EA |
5 |
52 |
NO. 6 PULL BOX INCL PCC COVER |
EA |
11 |
53 |
INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
LF |
13,805 |
54 |
2-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) |
LS |
1 |
55 |
3-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) |
LS |
1 |
56 |
REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) |
EA |
1 |
57 |
REMOVE VEHICLE HEAD (COMPLETE) |
EA |
25 |
58 |
REMOVE PEDESTRIAN HEAD (COMPLETE) |
EA |
31 |
59 |
REMOVE PEDESTRIAN PUSH BUTTON |
EA |
31 |
60 |
REMOVE TYPE 15 FOUNDATION |
EA |
1 |
61 |
RELOCATE RETRO REFLECTIVE STREET NAME SIGN |
EA |
6 |
62 |
TYPE 15 STANDARD |
EA |
1 |
63 |
TYPE 15 STANDARD FOUNDATION |
EA |
1 |
64 |
PEDESTRIAN PUSH BUTTON |
EA |
32 |
65 |
PEDESTRIAN PUSH BUTTON PLATE |
EA |
32 |
66 |
3-12" LED VEHICLE HEAD (COMPLETE) |
EA |
29 |
67 |
LED PEDESTRIAN HEAD (COMPLETE) |
EA |
32 |
68 |
DETAIL 8 (THERMOPLASTIC) |
LF |
240 |
69 |
DETAIL 9 (THERMOPLASTIC) |
LF |
21,515 |
70 |
DETAIL 21 (THERMOPLASTIC) |
LF |
150 |
71 |
DETAIL 22 (THERMOPLASTIC) |
LF |
6,967 |
72 |
DETAIL 27B (THERMOPLASTIC) |
LF |
29,320 |
73 |
DETAIL 29 (THERMOPLASTIC) |
LF |
1,725 |
74 |
DETAIL 32 (THERMOPLASTIC) |
LF |
8,275 |
75 |
DETAIL 37B (THERMOPLASTIC) |
LF |
1,855 |
76 |
DETAIL 38 (THERMOPLASTIC) |
LF |
6,215 |
77 |
DETAIL 38A (THERMOPLASTIC) |
LF |
525 |
78 |
DETAIL 39 (THERMOPLASTIC) |
LF |
29,390 |
79 |
DETAIL 39A (THERMOPLASTIC) |
LF |
22,915 |
80 |
DETAIL 40 (THERMOPLASTIC) |
LF |
685 |
81 |
DETAIL 41 (THERMOPLASTIC) |
LF |
430 |
82 |
PAVEMENT MARKINGS (THERMOPLASTIC) |
SF |
6,275 |
83 |
6" STRIPING (THERMOPLASTIC) |
LF |
825 |
84 |
8" STRIPING (THERMOPLASTIC) |
LF |
3,320 |
85 |
12" STRIPING (THERMOPLASTIC) |
LF |
5,135 |
86 |
24" STRIPING (THERMOPLASTIC) |
LF |
595 |
87 |
CURB MARKINGS (ONE-COAT PAINT) |
LF |
1,375 |
88 |
REMOVE DETAIL 8 (PAINT) |
LF |
13,405 |
89 |
REMOVE DETAIL 9 (PAINT) |
LF |
22,370 |
90 |
REMOVE DETAIL 21 (PAINT) |
LF |
4,210 |
91 |
REMOVE DETAIL 22 (PAINT) |
LF |
5,555 |
92 |
REMOVE DETAIL 37B (PAINT) |
LF |
3,950 |
93 |
REMOVE DETAIL 38 (PAINT) |
LF |
220 |
94 |
REMOVE DETAIL 38A (PAINT) |
LF |
920 |
95 |
REMOVE DETAIL 40 (PAINT) |
LF |
645 |
96 |
REMOVE PAVEMENT MARKINGS (PAINT) |
SF |
1,665 |
97 |
REMOVE 12" STRIPING (PAINT) |
LF |
125 |
98 |
INSTALL FIRE HYDRANT LOCATION RPM |
EA |
24 |