| Item |
Description |
Unit of Measure |
Estimated Quantity |
| 1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
| 2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
3 |
| 3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
| 4 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
| 5 |
IMPLEMENTATION OF BMPS |
LS |
1 |
| 6 |
OFFICE FACILITIES |
MTH |
4 |
| 7 |
MOBILIZATION |
LS |
1 |
| 8 |
CLEARING AND GRUBBING |
LS |
1 |
| 9 |
ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) |
EA |
33 |
| 10 |
TREE REMOVAL (6"-12" DIAMETER) |
EA |
1 |
| 11 |
TREE REMOVAL (13"-24" DIAMETER) |
EA |
5 |
| 12 |
CROWN REDUCTION, TREE (1" - 12" DIAMETER) |
EA |
6 |
| 13 |
CROWN REDUCTION, TREE (13" - 24" DIAMETER) |
EA |
24 |
| 14 |
CROWN REDUCTION, TREE (25" + DIAMETER) |
EA |
3 |
| 15 |
CONCRETE REMOVAL (NON-REINFORCED) |
CY |
332 |
| 16 |
UNCLASSIFIED EXCAVATION |
CY |
779 |
| 17 |
CRUSHED MISCELLANEOUS BASE |
CY |
587 |
| 18 |
TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
CY |
4 |
| 19 |
COLD MILL AC PAVEMENT (0 - 1-1/2") |
SF |
243,923 |
| 20 |
AC PAVEMENT |
TON |
105 |
| 21 |
AC PAVEMENT(PATCH BACK) |
TON |
7 |
| 22 |
RECONSTRUCT MANHOLE |
EA |
2 |
| 23 |
DOUBLE ADJUST MANHOLE |
EA |
37 |
| 24 |
ASPHALT RUBBER HOT MIX |
TON |
2,289 |
| 25 |
REMOVE AND RECONSTRUCT EXISTING CURB DRAIN PER STD PLAN 150, N=1 |
EA |
16 |
| 26 |
PCC CURB, TYPE A1-VAR |
LF |
440 |
| 27 |
PCC CURB & GUTTER, TYPE A2-8 |
LF |
68 |
| 28 |
PCC CURB & GUTTER, TYPE A2-VAR |
LF |
487 |
| 29 |
PCC CURB & GUTTER, TYPE A2-VAR, W=4' |
LF |
36 |
| 30 |
PCC CURB & GUTTER, TYPE A2-VAR, W=VAR |
LF |
86 |
| 31 |
PCC WALK & DRIVEWAYS, 4" THICK |
SF |
12,041 |
| 32 |
PCC CURB RAMPS |
CY |
106 |
| 33 |
DETECTABLE WARNING SURFACE |
SF |
631 |
| 34 |
CROSS GUTTER |
CY |
46 |
| 35 |
COMPOSITE TYPE 3 PULL BOX INCL COVER |
EA |
1 |
| 36 |
INSTALL FIRE HYDRANT LOCATION RPM |
EA |
26 |
| 37 |
TRAFFIC CONTROL |
LS |
1 |
| 38 |
FURNISH AND PLANT 24" BOX TREE |
EA |
79 |
| 39 |
LANDSCAPING |
LS |
1 |
| 40 |
PLANT ESTABLISHMENT PERIOD |
LS |
1 |
| 41 |
WATER TRUCK AND WATERING BAG REFILLING TREE ESTABLISHMENT |
LS |
1 |