Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) |
0.22
| 1 | LS | $2,000.00 | $2,000.00 |
$2,000.00
| $2,000.00 | $2,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.11
| 2 | MTH | $500.00 | $500.00 |
$1,000.00
| $500.00 | $500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.11
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.07.003 | IMPLEMENTATION OF BMPS |
1.11
| 1 | LS | $5,000.00 | $10,000.00 |
$10,000.00
| $19,499.13 | $21,446.50 |
001.08.005 | OFFICE FACILITIES |
5.12
| 4 | MTH | $2,000.00 | $11,500.00 |
$46,000.00
| $4,851.56 | $5,000.00 |
300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
2.90
| 163 | CY | $220.00 | $160.00 |
$26,080.00
| $236.09 | $172.35 |
300.02.003 | UNCLASSIFIED EXCAVATION |
3.34
| 501 | CY | $110.00 | $60.00 |
$30,060.00
| $101.59 | $84.00 |
301.02.005 | CRUSHED MISCELLANEOUS BASE |
5.51
| 69 | CY | $220.00 | $718.00 |
$49,542.00
| $227.13 | $112.50 |
301.03.005 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
0.36
| 13 | CY | $440.00 | $250.00 |
$3,250.00
| $372.50 | $275.00 |
302.01.007 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
1.43
| 14301 | SF | $3.50 | $0.90 |
$12,870.90
| $2.57 | $1.45 |
302.05.013 | AC PAVEMENT |
2.55
| 216 | TON | $175.00 | $106.00 |
$22,896.00
| $155.50 | $161.50 |
302.05.014 | AC PAVEMENT(PATCH BACK) |
1.69
| 57 | TON | $220.00 | $267.00 |
$15,219.00
| $251.00 | $252.50 |
302.09.003 | ASPHALT RUBBER HOT MIX |
2.07
| 136 | TON | $245.00 | $137.00 |
$18,632.00
| $205.00 | $223.00 |
303.05.016 | PCC CURB & GUTTER, TYPE A3-8 |
6.68
| 2000 | LF | $34.00 | $30.00 |
$60,000.00
| $41.60 | $31.65 |
307.02.049 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
0.42
| 250 | LF | $8.00 | $15.00 |
$3,750.00
| $48.21 | $19.00 |
310.05.007 | DETAIL 9 (THERMOPLASTIC) |
0.86
| 8817 | LF | $2.00 | $0.88 |
$7,758.96
| $4.37 | $0.95 |
310.05.007 | DETAIL 22 (THERMOPLASTIC) |
0.11
| 465 | LF | $2.50 | $2.05 |
$953.25
| $6.08 | $3.00 |
310.05.007 | DETAIL 32 (THERMOPLASTIC) |
0.10
| 295 | LF | $3.00 | $2.95 |
$870.25
| $6.48 | $3.00 |
310.05.007 | DETAIL 38 (THERMOPLASTIC) |
0.04
| 170 | LF | $2.50 | $2.05 |
$348.50
| $6.13 | $2.53 |
310.05.014 | DETAIL 25A (THERMOPLASTIC) |
0.23
| 1935 | LF | $2.00 | $1.05 |
$2,031.75
| $4.31 | $1.08 |
310.05.034 | PAVEMENT MARKINGS (THERMOPLASTIC) |
0.14
| 135 | SF | $8.00 | $9.45 |
$1,275.75
| $12.37 | $9.75 |
310.05.043 | CURB MARKINGS (ONE-COAT PAINT) |
0.04
| 224 | LF | $3.50 | $1.80 |
$403.20
| $6.20 | $3.00 |
310.05.106 | REMOVE DETAIL 32 (THERMOPLASTIC) |
0.14
| 215 | LF | $4.00 | $5.65 |
$1,214.75
| $15.17 | $7.00 |
315.06.003 | SIGN PANEL |
0.35
| 21 | EA | $150.00 | $150.00 |
$3,150.00
| $264.90 | $150.10 |
315.06.005 | FURNISH ONE-POST (ROADSIDE SIGN) |
0.14
| 13 | EA | $150.00 | $95.00 |
$1,235.00
| $192.08 | $122.50 |
315.06.015 | INSTALL ONE-POST (ROADSIDE SIGN) |
0.18
| 13 | EA | $150.00 | $122.00 |
$1,586.00
| $251.43 | $195.00 |
315.06.017 | INSTALL SIGN (STRAP AND SADDLE BRACKET) |
0.09
| 21 | EA | $120.00 | $39.00 |
$819.00
| $203.63 | $80.00 |
315.06.023 | RELOCATE SIGN |
0.02
| 1 | EA | $200.00 | $200.00 |
$200.00
| $357.88 | $336.50 |
601.09.011 | TRAFFIC CONTROL |
3.45
| 1 | LS | $40,000.00 | $31,000.00 |
$31,000.00
| $47,359.39 | $49,399.05 |
601.09.017 | FLASHING ARROW SIGN |
0.24
| 2 | EA | $5,000.00 | $1,100.00 |
$2,200.00
| $2,144.69 | $1,950.00 |
601.09.019 | CHANGEABLE MESSAGE SIGN |
0.60
| 2 | EA | $5,000.00 | $2,700.00 |
$5,400.00
| $3,393.38 | $2,850.00 |
801.04.021 | LANDSCAPING |
4.56
| 1 | LS | $33,896.00 | $40,950.00 |
$40,950.00
| $65,122.50 | $41,475.00 |
801.05.003 | IRRIGATION SYSTEM |
21.71
| 1 | LS | $172,892.00 | $195,111.00 |
$195,111.00
| $196,311.88 | $193,230.50 |
801.06.017 | RIVER ROCK PAVING |
2.26
| 1452 | SF | $17.60 | $14.00 |
$20,328.00
| $22.23 | $19.50 |
| 90 DAY PLANT ESTABLISHMENT PERIOD |
0.45
| 1 | LS | $6,600.00 | $4,000.00 |
$4,000.00
| $8,711.75 | $3,950.00 |
| MONUMENT SIGNS AND FOOTINGS |
8.01
| 1 | LS | $57,750.00 | $72,000.00 |
$72,000.00
| $70,174.25 | $71,750.00 |
| INSTALL FIRE HYDRANT LOCATION RPM |
0.05
| 28 | EA | $50.00 | $17.00 |
$476.00
| $1,242.65 | $21.00 |
| ELECTRICAL WORK |
16.50
| 1 | LS | $163,625.00 | $148,272.00 |
$148,272.00
| $141,348.44 | $140,888.75 |
| DECORATIVE BOULDERS |
1.09
| 1 | LS | $27,500.00 | $9,800.00 |
$9,800.00
| $31,927.16 | $22,390.50 |
| AGRONOMIC SOIL REPORTS |
0.06
| 1 | EA | $330.00 | $570.00 |
$570.00
| $821.91 | $597.50 |
| CITY OF GLENDALE ENCROACHMENT PERMIT AND INSPECTION FEES (ALLOWANCE OF $ 5,000) |
0.56
| 5000 | AL | $1.00 | $1.00 |
$5,000.00
| $1.00 | $1.00 |
| CITY OF LA CANADA FLINTRIDGE ENCROACHMENT PERMIT AND INSPECTION FEES (ALLOWANCE OF $ 5,000) |
0.56
| 5000 | AL | $1.00 | $1.00 |
$5,000.00
| $1.00 | $1.00 |
| CLASS A TOPSOIL |
3.84
| 628 | CY | $66.00 | $55.00 |
$34,540.00
| $70.11 | $66.50 |
| Total Percent | 100 | | | | Total Amount | $898,793.31 | | |