Bid Price History

Devil's Gate Dam and Reservoir Sediment Removal
$66,564,504.25
07/03/2018
535 (E5),535 (E6)
7
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.013PARTNERING (ALLOWANCE OF $25,000) 0.04 25000AL$1.00$1.00 $25,000.00 $1.00$1.00
001.07.001IMPLEMENTATION OF BMPS 0.54 36MTH$2,000.00$10,000.00 $360,000.00 $22,500.00$20,000.00
300.01.013TREE REMOVAL (6"-12" DIAMETER) 0 2EA$1,000.00$500.00 $1,000.00 $691.43$750.00
300.01.014TREE REMOVAL (13"-24" DIAMETER) 0.01 7EA$1,000.00$800.00 $5,600.00 $1,077.14$1,000.00
300.01.015TREE REMOVAL (25"+ DIAMETER) 0 1EA$1,200.00$1,000.00 $1,000.00 $1,718.57$1,200.00
300.01.057REMOVE EXISTING CHAIN LINK FENCE 0.01 330LF$20.00$16.00 $5,280.00 $11.71$10.00
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 0.04 105CY$150.00$250.00 $26,250.00 $137.00$105.00
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 0.04 94CY$300.00$260.00 $24,440.00 $137.00$105.00
300.01.067CONCRETE REMOVAL (REINFORCED) 0.02 25CY$300.00$440.00 $11,000.00 $242.86$225.00
300.01.067CONCRETE REMOVAL (REINFORCED) 0.07 157CY$300.00$280.00 $43,960.00 $242.86$225.00
300.05.002IMPORTED BORROW 0.04 871CY$80.00$30.00 $26,130.00 $33.86$30.00
300.11.007RIPRAP (LIGHT CLASS) 0.03 148CY$110.00$120.00 $17,760.00 $194.71$188.00
300.11.009RIPRAP (QUARTER TON CLASS) 0.03 149CY$120.00$120.00 $17,880.00 $162.14$170.00
300.11.017CONCRETED RIPRAP (LIGHT CLASS) 0.03 148CY$200.00$150.00 $22,200.00 $309.14$330.00
301.02.005CRUSHED MISCELLANEOUS BASE 0.11 685CY$60.00$110.00 $75,350.00 $112.29$98.00
302.05.024ADJUST MANHOLE 0.01 4EA$600.00$1,000.00 $4,000.00 $1,448.57$1,250.00
302.06.003PCC PAVEMENT 0.22 359CY$300.00$415.00 $148,985.00 $469.57$385.00
303.01.113DRILL AND BOND DOWEL 0.01 100LF$50.00$50.00 $5,000.00 $54.43$45.00
303.01.315CATCH BASIN PER STD PLAN 304, 1 GRATES 0.04 3EA$8,000.00$8,000.00 $24,000.00 $8,757.14$8,000.00
303.01.315CATCH BASIN PER STD PLAN 304, 5 GRATES 0.03 1EA$10,000.00$20,000.00 $20,000.00 $18,224.29$20,000.00
303.01.339JUNCTION STRUCTURE PER STD PLAN 331 0.02 3EA$2,000.00$5,000.00 $15,000.00 $5,132.86$3,300.00
303.01.606REINFORCED CONCRETE RETAINING WALL TYPE 2 0.09 23CY$1,200.00$2,700.00 $62,100.00 $1,882.86$1,800.00
303.01.608REINFORCED CONCRETE RETAINING WALL TYPE 4 0.12 26CY$1,200.00$3,000.00 $78,000.00 $2,224.29$1,800.00
303.02.005AIR PLACED CONCRETE (INCL WIRE MESH) 0.02 13CY$800.00$900.00 $11,700.00 $1,568.57$1,100.00
303.05.004PCC CURB, TYPE A1-8 0 10LF$25.00$100.00 $1,000.00 $115.71$100.00
303.05.021PCC CURB, TYPE C1-6 0 12LF$25.00$75.00 $900.00 $102.00$75.00
304.03.003CHAIN LINK FENCE, 5' HIGH 0.03 272LF$40.00$65.00 $17,680.00 $49.86$56.00
304.03.003CHAIN LINK FENCE, 4' HIGH 0.02 80LF$30.00$155.00 $12,400.00 $74.29$55.00
305.02.003TIMBER POST, 4" DIA 0 8LF$150.00$125.00 $1,000.00 $88.71$125.00
306.01.12918" RCP, 2000 D 0.02 73LF$300.00$200.00 $14,600.00 $165.00$160.00
306.01.377PIPE ANCHOR 0.19 28EA$1,500.00$4,500.00 $126,000.00 $2,359.86$1,900.00
310.05.005DETAIL 32 (TWO-COAT PAINT) 0.01 395LF$4.50$19.00 $7,505.00 $12.00$11.00
310.05.005DETAIL 29 (TWO-COAT PAINT) 0 90LF$4.00$20.00 $1,800.00 $13.14$12.00
310.05.005DETAIL 38 (TWO-COAT PAINT) 0.01 170LF$3.00$20.00 $3,400.00 $12.00$11.00
310.05.005DETAIL 22 (TWO-COAT PAINT) 0 150LF$3.50$12.00 $1,800.00 $9.00$11.00
310.05.032PAVEMENT MARKINGS (TWO-COAT PAINT) 0 52SF$6.00$35.00 $1,820.00 $20.57$12.00
310.05.03812" STRIPING (TWO-COAT PAINT) 0 90LF$4.00$35.00 $3,150.00 $19.29$11.00
310.05.103REMOVE DETAIL 29 0.01 395LF$10.00$23.00 $9,085.00 $13.43$11.00
310.05.103REMOVE DETAIL 22 0 90LF$4.60$35.00 $3,150.00 $21.00$21.00
315.06.003SIGN PANEL 0.01 27EA$150.00$250.00 $6,750.00 $197.29$220.00
315.06.005FURNISH ONE-POST (ROADSIDE SIGN) 0.01 12EA$150.00$330.00 $3,960.00 $232.86$200.00
315.06.015INSTALL ONE-POST (ROADSIDE SIGN) 0 12EA$150.00$200.00 $2,400.00 $222.14$200.00
315.06.017INSTALL SIGN (STRAP AND SADDLE BRACKET) 0.01 27EA$150.00$180.00 $4,860.00 $180.00$180.00
601.09.011TRAFFIC CONTROL 0.23 1LS$25,000.00$150,000.00 $150,000.00 $598,571.43$800,000.00
601.09.017FLASHING ARROW SIGN 0.02 2EA$10,000.00$5,000.00 $10,000.00 $9,757.14$5,000.00
601.09.019CHANGEABLE MESSAGE SIGN 0.06 2EA$10,000.00$19,000.00 $38,000.00 $18,771.43$19,000.00
 STREET SWEEPING (RESERVOIR HAUL ROUTE) (2020) 0.37 1440HRS$67.00$170.00 $244,800.00 $160.29$160.00
 STREET SWEEPING (RESERVOIR HAUL ROUTE) (2021) 0.37 1440HRS$67.00$170.00 $244,800.00 $160.29$160.00
 STREET SWEEPING (RESERVOIR HAUL ROUTE) (2022) 0.37 1440HRS$67.00$170.00 $244,800.00 $161.00$160.00
 STREET SWEEPING (MANNING PIT HAUL ROUTE) (2019) 0.39 1440HRS$67.00$180.00 $259,200.00 $160.29$160.00
 STREET SWEEPING (MANNING PIT HAUL ROUTE) (2020) 0.37 1440HRS$67.00$170.00 $244,800.00 $160.29$160.00
 STREET SWEEPING (MANNING PIT HAUL ROUTE) (2021) 0.37 1440HRS$67.00$170.00 $244,800.00 $160.29$160.00
 STREET SWEEPING (MANNING PIT HAUL ROUTE) (2022) 0.37 1440HRS$67.00$170.00 $244,800.00 $161.00$160.00
 TEMPORARY SOUND WALL 0.23 305LF$60.00$500.00 $152,500.00 $425.00$500.00
 STRUCTURE CONCRETE (MEDIAN) 0.04 23CY$1,220.00$1,100.00 $25,300.00 $720.71$600.00
 TIRE WASHES (2020) 0.06 2EA$55,000.00$20,000.00 $40,000.00 $72,085.71$82,000.00
 TIRE WASHES (2021) 0.03 2EA$55,000.00$10,000.00 $20,000.00 $71,128.57$82,000.00
 TIRE WASHES (2022) 0.02 2EA$55,000.00$7,500.00 $15,000.00 $71,271.43$82,000.00
 TIRE WASHES (2019) 0.08 2EA$55,000.00$25,000.00 $50,000.00 $145,757.14$110,000.00
 TRANSPORTATION AND DISPOSAL OF MATERIAL (MANNING PIT) (2020) 7.96 415625TON$7.50$12.75 $5,299,218.75 $13.85$14.00
 TRANSPORTATION AND DISPOSAL OF MATERIAL (MANNING PIT) (2021) 8.15 415625TON$7.75$13.06 $5,428,062.50 $13.78$13.06
 TRANSPORTATION AND DISPOSAL OF MATERIAL (MANNING PIT) (2022) 8.34 415625TON$8.00$13.36 $5,552,750.00 $13.80$13.36
 TRANSPORTATION AND DISPOSAL OF MATERIAL (SHELDON PIT) (2019) 6.96 415625TON$8.25$11.15 $4,634,218.75 $12.32$12.50
 TRANSPORTATION AND DISPOSAL OF MATERIAL (SHELDON PIT) (2020) 7.09 415625TON$8.50$11.36 $4,721,500.00 $12.37$12.60
 TRANSPORTATION AND DISPOSAL OF MATERIAL (SHELDON PIT) (2021) 7.29 415625TON$8.75$11.67 $4,850,343.75 $12.44$12.00
 TRANSPORTATION AND DISPOSAL OF MATERIAL (SHELDON PIT) (2022) 7.47 415625TON$9.00$11.96 $4,970,875.00 $12.58$12.00
 TRANSPORTATION AND DISPOSAL OF MATERIAL (MANNING PIT) (2019) 7.84 415625TON$7.25$12.56 $5,220,250.00 $14.14$14.50
 TYPE I BARRICADE 0.02 8EA$550.00$1,400.00 $11,200.00 $681.43$250.00
 UNCLASSIFIED EXCAVATION (MEDIAN RESTORATION ) 0.01 58CY$90.00$100.00 $5,800.00 $130.29$125.00
 UNCLASSIFIED EXCAVATION (2019) 2.54 831250TON$4.00$2.03 $1,687,437.50 $4.55$3.80
 UNCLASSIFIED FILL (ACCESS ROADS) 0.19 1820CY$50.00$70.00 $127,400.00 $22.36$9.00
 UNCLASSIFIED FILL (MANNING PIT) (2019) 1.41 250000CY$7.00$3.75 $937,500.00 $5.32$6.00
 UNCLASSIFIED FILL (MANNING PIT) (2020) 1.43 250000CY$7.25$3.82 $955,000.00 $5.11$5.80
 UNCLASSIFIED EXCAVATION (2020) 2.57 831250TON$4.25$2.06 $1,712,375.00 $4.25$3.80
 UNCLASSIFIED EXCAVATION (2021) 2.66 831250TON$4.50$2.13 $1,770,562.50 $3.99$3.80
 UNCLASSIFIED EXCAVATION (2022) 2.73 831250TON$4.75$2.19 $1,820,437.50 $3.96$3.80
 UNCLASSIFIED EXCAVATION (ACCESS ROADS) 0.36 949CY$50.00$250.00 $237,250.00 $48.71$14.00
 UNCLASSIFIED EXCAVATION (MEDIAN REMOVAL) 0.02 84CY$90.00$120.00 $10,080.00 $106.14$81.00
 UNCLASSIFIED FILL (MANNING PIT) (2021) 1.49 250000CY$7.50$3.96 $990,000.00 $4.82$5.00
 UNCLASSIFIED FILL (MANNING PIT) (2022) 1.52 250000CY$7.75$4.06 $1,015,000.00 $4.87$5.00
 LOW FLOW CROSSINGS 0.11 10EA$75,000.00$7,500.00 $75,000.00 $18,400.00$16,800.00
 JOBS COORDINATOR (ALLOWANCE OF $150,000) 0.23 150000AL$1.00$1.00 $150,000.00 $1.00$1.00
 MOBILIZATION (2021) 0.30 1LS$125,000.00$200,000.00 $200,000.00 $1,271,428.57$1,500,000.00
 MOBILIZATION (2022) 0.30 1LS$125,000.00$200,000.00 $200,000.00 $1,074,285.71$1,000,000.00
 MOBILIZATION (2018) 5.29 1LS$125,000.00$3,520,000.00 $3,520,000.00 $1,474,337.14$1,000,000.00
 MOBILIZATION (2019) 0.30 1LS$125,000.00$200,000.00 $200,000.00 $1,742,857.14$1,900,000.00
 MOBILIZATION (2020) 0.30 1LS$125,000.00$200,000.00 $200,000.00 $1,390,254.14$1,430,000.00
 NOX AND PM10 REDUCTION PLAN UPDATES (STIPULATED UNIT PRICE OF $500/MONTH) 0.03 36MTH$500.00$500.00 $18,000.00 $500.00$500.00
 NOX AND PM10 REDUCTION PLAN (STIPULATED UNIT PRICE OF $2,500) 0 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 OFFICE FACILITIES (MANNING PIT) 0.17 36MTH$1,250.00$3,200.00 $115,200.00 $4,200.00$3,800.00
 OFFICE FACILITIES (RESERVOIR) 0.17 36MTH$1,250.00$3,200.00 $115,200.00 $5,642.86$3,800.00
 PCC CURB & GUTTER PER CITY OF PASADENA STD PLAN S-406 (ACCESS ROADS) 0.01 85LF$25.00$40.00 $3,400.00 $63.00$50.00
 PCC CURB & GUTTER PER CITY OF PASADENA STD PLAN S-406 (MEDIAN) 0.02 227LF$25.00$60.00 $13,620.00 $46.29$50.00
 PORTABLE SCALES (2022) 0.24 2EA$30,000.00$80,000.00 $160,000.00 $80,100.00$80,000.00
 PORTABLE SCALES (2019) 0.45 2EA$30,000.00$150,000.00 $300,000.00 $163,071.43$150,000.00
 PIPE GATE PER STD PLAN 602 (MOD), W=42' 0.02 1EA$10,000.00$14,000.00 $14,000.00 $10,828.57$13,000.00
 PIPE GATE PER STD PLAN 602, W=16' 0.02 2EA$10,000.00$6,000.00 $12,000.00 $5,285.71$6,100.00
 PIPE GATE PER STD PLAN 602, W=32' 0.02 1EA$10,000.00$13,000.00 $13,000.00 $8,928.57$10,000.00
 PREPARATION OF SURFACE WATER DIVERSION PLAN (STIPULATED UNIT PRICE OF $5,000) 0.03 4EA$5,000.00$5,000.00 $20,000.00 $5,000.00$5,000.00
 PORTABLE SCALES (2020) 0.45 2EA$30,000.00$150,000.00 $300,000.00 $89,114.29$86,000.00
 PORTABLE SCALES (2021) 0.27 2EA$30,000.00$90,000.00 $180,000.00 $81,028.57$86,000.00
 REINFORCED CONCRETE ACCESS RAMP 0.08 86CY$1,200.00$650.00 $55,900.00 $610.43$620.00
 REINFORCED CONCRETE THRUST BLOCK (SECTION A4-A4) 0.01 1EA$4,200.00$9,000.00 $9,000.00 $11,071.43$9,600.00
 REINFORCED CONCRETE THRUST BLOCK (DETAIL "A") 0.04 1EA$30,000.00$28,000.00 $28,000.00 $31,685.71$28,000.00
 REINFORCED CONCRETE THRUST BLOCK (SECTION A3-A3) 0.04 2EA$8,000.00$14,000.00 $28,000.00 $15,600.00$14,600.00
 REINFORCED CONCRETE OUTLET STRUCTURE 0.14 1LS$52,000.00$90,000.00 $90,000.00 $107,285.71$90,000.00
 REMOVE AND REPLACE LACFCD WATER VALVE BOX 0 1EA$3,000.00$2,000.00 $2,000.00 $2,483.57$2,000.00
 REMOVE AND DISPOSE TEMPORARY SOUND WALL 0.03 305LF$10.00$55.00 $16,775.00 $79.71$88.00
 REMOVE AND DISPOSE OF EXISTING GUARDRAIL 0.01 380LF$20.00$16.00 $6,080.00 $17.29$16.00
 REMOVE ESA FENCING (2020) 0.03 12000LF$4.90$1.40 $16,800.00 $1.78$1.50
 REMOVE ESA FENCING (2021) 0.03 12000LF$4.90$1.40 $16,800.00 $1.79$1.50
 REMOVE BOLLARDS (INC. CONC. FOOTING) 0.01 5EA$150.00$800.00 $4,000.00 $422.14$320.00
 REMOVE EXISTING METAL HAND RAILINGS 0 11LF$50.00$200.00 $2,200.00 $88.14$100.00
 REMOVE ESA FENCING (2022) 0.03 12000LF$4.90$1.40 $16,800.00 $1.72$1.40
 REMOVE EXISTING 36" PE PIPE 0 75LF$20.00$35.00 $2,625.00 $60.29$50.00
 REMOVE EXISTING 36" PE PIPE (DOUBLE) 0.01 200LF$25.00$40.00 $8,000.00 $71.14$55.00
 REMOVE ESA FENCING (2019) 0.03 12000LF$4.90$1.40 $16,800.00 $1.78$1.50
 REMOVE PIEZOMETER 0 2EA$100.00$500.00 $1,000.00 $1,367.14$1,600.00
 REMOVE EXISTING METAL DRAIN PIPE 0 49LF$50.00$50.00 $2,450.00 $56.71$50.00
 REMOVE PULLBOX 0 1EA$300.00$500.00 $500.00 $742.86$700.00
 REMOVE SURVEY MONUMENT 0 1EA$150.00$1,000.00 $1,000.00 $818.57$920.00
 RESERVOIR MOWING 0.53 350000AL$1.00$1.00 $350,000.00 $1.00$1.00
 SHORING OF OPEN EXCAVATION (DRAINAGE) 0 1LS$5,000.00$1,000.00 $1,000.00 $20,571.43$15,000.00
 SHORING OF OPEN EXCAVATION (RETAINING WALL) 0 1LS$30,000.00$1,000.00 $1,000.00 $68,857.14$15,000.00
 SEPARATION AND DISPOSAL OF ORGANIC MATERIAL AND DEBRIS (2019) 0.37 8313TON$45.00$30.00 $249,390.00 $70.86$70.00
 SEPARATION AND DISPOSAL OF ORGANIC MATERIAL AND DEBRIS (2020) 0.37 8313TON$45.00$30.00 $249,390.00 $71.14$70.00
 SEPARATION AND DISPOSAL OF ORGANIC MATERIAL AND DEBRIS (2021) 0.37 8313TON$45.00$30.00 $249,390.00 $71.71$71.00
 SEPARATION AND DISPOSAL OF ORGANIC MATERIAL AND DEBRIS (2022) 0.37 8313TON$45.00$30.00 $249,390.00 $72.00$72.00
 STREET SWEEPING (RESERVOIR HAUL ROUTE) (2019) 0.39 1440HRS$67.00$180.00 $259,200.00 $160.29$160.00
 2'X2' CUSTOM SIGN PANEL 0.01 8EA$1,000.00$700.00 $5,600.00 $477.14$400.00
 24" RCP, 2000 D (ACCESS ROADS) 0.04 191LF$350.00$150.00 $28,650.00 $147.14$140.00
 24" RCP, 2000 D (MANNING PIT) 0.14 624LF$500.00$150.00 $93,600.00 $145.29$150.00
 36" POLYETHYLENE SOLID WALL PIPE 0.04 64LF$220.00$400.00 $25,600.00 $322.57$350.00
 36" POLYETHYLENE SOLID WALL PIPE (DOUBLE) 0.32 384LF$375.00$550.00 $211,200.00 $581.00$550.00
 AC PAVEMENT (PATCH BACK) 0.01 16TON$200.00$400.00 $6,400.00 $262.86$260.00
 AC PAVEMENT (ACCESS ROADS) 0.02 108TON$100.00$150.00 $16,200.00 $241.86$150.00
 AC PAVEMENT (MANNING PIT) 0.68 5417TON$100.00$84.00 $455,028.00 $112.43$110.00
 AC PAVEMENT (MEDIAN) 0.03 71TON$100.00$250.00 $17,750.00 $190.43$163.00
 ACCESS RAMP/ROAD DRAIN INLET STRUCTURE 0.08 7EA$400.00$8,000.00 $56,000.00 $8,614.29$8,000.00
 ACCESS RAMP/ROAD DRAIN OUTLET STRUCTURE 0.08 7EA$900.00$8,000.00 $56,000.00 $8,842.86$8,000.00
 AIR PLACED CONCRETE (INCL WIRE MESH) (MANNING PIT) 0.69 1156CY$300.00$400.00 $462,400.00 $597.71$580.00
 ADJUST PIEZOMETER TO FINAL GRADE 0 1EA$3,000.00$1,600.00 $1,600.00 $1,722.86$1,600.00
 CATCH BASIN PER STD PLAN 300 (MOD), W=7 0.02 1EA$9,000.00$11,000.00 $11,000.00 $12,457.14$12,000.00
 CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $50,000) 0.08 50000AL$1.00$1.00 $50,000.00 $1.00$1.00
 CLEARING AND GRUBBING (RESERVOIR) (2022) 0.19 14AC$3,300.00$9,000.00 $126,000.00 $16,571.43$11,000.00
 CLEARING AND GRUBBING (ACCESS ROADS) 0.08 1LS$50,000.00$50,000.00 $50,000.00 $235,714.29$50,000.00
 CLEARING AND GRUBBING (RESERVOIR) (2019) 1.69 51AC$3,300.00$22,000.00 $1,122,000.00 $24,571.43$25,000.00
 CONCRETE REMOVAL (REINFORCED) (CONCRETE DAM) 0.01 17CY$250.00$300.00 $5,100.00 $432.86$320.00
 CONCRETE REMOVAL (REINFORCED) (MEDIAN) 0 10CY$1,000.00$250.00 $2,500.00 $492.86$500.00
 CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $2,000) 0 1LS$2,000.00$2,000.00 $2,000.00 $2,000.00$2,000.00
 CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5000) 0.01 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
 CRASH CUSHION 0.10 1LS$50,000.00$66,000.00 $66,000.00 $53,128.57$66,000.00
 CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MTH) 0.03 36MTH$500.00$500.00 $18,000.00 $500.00$500.00
 CRUSHED MISCELLANEOUS BASE (MEDIAN REMOVAL) 0.01 36CY$100.00$190.00 $6,840.00 $145.00$160.00
 CRUSHED MISCELLANEOUS BASE (MEDIAN RESTORATION) 0.01 35CY$100.00$170.00 $5,950.00 $208.57$170.00
 CRUSHED MISCELLANEOUS BASE (MANNING PIT) 0.24 4013CY$45.00$40.00 $160,520.00 $67.29$61.00
 ENVIRONMENTALLY SENSITIVE AREA (ESA) FENCING (2019) 0.10 12000LF$4.90$5.50 $66,000.00 $5.32$4.40
 ENVIRONMENTALLY SENSITIVE AREA (ESA) FENCING (2020) 0.10 12000LF$4.90$5.50 $66,000.00 $5.05$4.00
 EXPLORATORY EXCAVATION (12" GAS) 0 1EA$3,000.00$2,500.00 $2,500.00 $6,857.14$5,000.00
 EXPLORATORY EXCAVATION (12" WATER) 0 1EA$3,000.00$2,500.00 $2,500.00 $6,857.14$5,000.00
 ENVIRONMENTALLY SENSITIVE AREA (ESA) FENCING (2021) 0.10 12000LF$4.90$5.50 $66,000.00 $5.08$4.00
 ENVIRONMENTALLY SENSITIVE AREA (ESA) FENCING (2022) 0.10 12000LF$4.90$5.50 $66,000.00 $5.09$4.00
 FOLDABLE SIGN PANEL 0.01 8EA$150.00$450.00 $3,600.00 $343.57$410.00
 FUGITIVE DUST CONTROL PLAN (MANNING PIT) (STIPULATED UNIT PRICE OF $2,500) 0 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 FUGITIVE DUST CONTROL PLAN (RESERVOIR) (STIPULATED UNIT PRICE OF $2,500) 0 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 IMPLEMENTATION OF SURFACE WATER DIVERSION PLAN (STIPULATED UNIT PRICE OF $1,000/MONTH) 0.05 32MTH$1,000.00$1,000.00 $32,000.00 $1,000.00$1,000.00
 INSTALL SIGNS ON BARRICADES/POSTS 0 8EA$100.00$200.00 $1,600.00 $315.71$210.00
 Total Percent100   Total Amount$66,564,504.25