Work Orders for JOC Contract 1600

Company Name:  MTM Construction, Inc.
Amount:  $4,500,000
Contract No: PW15080
Start Date: 6/6/2017
End Date: 6/5/2018

Projects

Work Order #Work Order TitleWork Order AmountWork Order Description
1600-001.00 RLANRC - Make Ready Work for Interim Facilities $720,746.13

Placing temprary buildings number F-1, F-2, F-3, F-4, F-5, F-6 located at the south-east corner of the campus.

1600-001.01 RLANRC - Make Ready Work for Interim Facilities Add. Low Voltage Conduits for SSA, Harriman, and Swing Space Trailers $174,532.40

Install conduits to complete the campus loop and install copper telecommunication cables to existing modular buildings at Rancho Los Amigos National Rehabilitation Center.

1600-001.02 RLANRC - Unforeseen Utility Requirements $0.00

Stem repair connection to 3 phase power, repair of sewer at trailer F, and connection to 3 inch fire water line in support of Harriman and SSA swing space trailers.

1600-002.00 RLARC Pre-Trailer Delivery Utility and Make-Ready $736,612.57

Prepare for the delivery of swing space modular buildings; Installation of underground utilities (water, sewer, telecom) safe off of existing utilities that feed buildings slated for demolition (605/606 and 600 storage), demolition of buildings 605/606 and the 600 storage building, tree removal, and excavation and compaction of modular building pads.

Total $1,631,891.10 