Frequently Asked Questions (FAQ)

Question:
Do Geotechnical Engineering Reports require a wet stamp by the Geotechnical Project Engineer at any point or are electronic stamp/signatures acceptable? In the past we have always submitted wet stamped compaction reports but per the Board of Engineering electronic copies are acceptable.

Please confirm if the County of LA also accepts electronic stamps in lieu of Wet Stamps.


Answer:
In response to our question, electronic stamp/signatures are acceptable considering all plans, reports, etc. are submitted electronically.

electronic stamp, electronic signature GMED Land soils geology geotechnical landslides laboratory rubberized