Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MTH) | 4.00 | MTH |
1.00
| 0.00 | 1.00 | $500.00 | $500.00 |
4 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.40
| 0.00 | 0.40 | $6,000.00 | $2,400.00 |
5 | TRAFFIC CONTROL | 1.00 | LS |
0.15
| 0.00 | 0.15 | $60,000.00 | $9,000.00 |
6 | FLASHING ARROW SIGN | 2.00 | EA |
1.00
| 0.00 | 1.00 | $4,000.00 | $4,000.00 |
7 | CHANGEABLE MESSAGE SIGN | 2.00 | EA |
1.00
| 0.00 | 1.00 | $5,000.00 | $5,000.00 |
8 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 0.00 | 1.00 | $3,000.00 | $3,000.00 |
9 | OFFICE FACILITIES | 1.00 | LS |
0.40
| 0.00 | 0.40 | $15,000.00 | $6,000.00 |
10 | MOBILIZATION | 1.00 | LS |
0.50
| 0.00 | 0.50 | $20,000.00 | $10,000.00 |
12 | CONCRETE REMOVAL (NON-REINFORCED) | 105.00 | CY |
105.00
| 0.00 | 105.00 | $110.00 | $11,550.00 |
13 | CONCRETE REMOVAL (REINFORCED) | 2.00 | CY |
2.00
| 0.00 | 2.00 | $600.00 | $1,200.00 |
14 | UNCLASSIFIED EXCAVATION | 331.00 | CY |
331.00
| 0.00 | 331.00 | $65.00 | $21,515.00 |
15 | CRUSHED MISCELLANEOUS BASE | 195.00 | CY |
195.00
| 0.00 | 195.00 | $80.00 | $15,600.00 |
16 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 14.00 | CY |
11.57
| 0.00 | 11.57 | $150.00 | $1,735.50 |
24 | 18" RCP, 2000 D | 32.00 | LF |
32.00
| 0.00 | 32.00 | $400.00 | $12,800.00 |
25 | CATCH BASIN PER STD PLAN 300, W=3.5 | 1.00 | EA |
0.75
| 0.00 | 0.75 | $8,000.00 | $6,000.00 |
26 | PIPE CONNECTION PER STD PLAN 335, CASE 1 | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,000.00 | $2,000.00 |
29 | PCC CURB & GUTTER, TYPE A2-8 | 369.00 | LF |
369.00
| 0.00 | 369.00 | $25.00 | $9,225.00 |
30 | PCC WALK & CURB RAMPS, 4" THICK | 6,005.00 | SF |
2,562.00
| 0.00 | 2,562.00 | $6.00 | $15,372.00 |
31 | PCC DRIVEWAYS, 6" THICK | 355.00 | SF |
355.00
| 0.00 | 355.00 | $6.00 | $2,130.00 |
32 | PCC PAVEMENT (BUS PADS) | 41.00 | CY |
38.20
| 0.00 | 38.20 | $250.00 | $9,550.00 |
37 | 3" CONDUIT (SCH 80 PVC) | 1,325.00 | LF |
450.00
| 0.00 | 450.00 | $35.00 | $15,750.00 |
41 | NO. 5 PULL BOX INCL PCC COVER | 8.00 | EA |
1.00
| 0.00 | 1.00 | $300.00 | $300.00 |
120 | RIVER ROCK PAVING | 4,803.00 | SF |
4,803.00
| 0.00 | 4,803.00 | $10.00 | $48,030.00 |
S-2 | PACE NEW RIVER ROCK PAVING PER CITY OF ARCADIA'S STANDARD | | LS |
1.00
| 0.00 | 1.00 | $24,000.00 | $24,000.00 |
|