Los Angeles County Public Works
Project Management Division III
Progress Payment 2
Project Name: El Segundo Boulevard - Avalon Boulevard to Central Avenue, et al.
Contractor: Toro Enterprises, Inc.
P.O. Box 6285
Oxnard, CA 93031
Project ID: RDC0014453
Federal Number(s): None
Original Contract: $2,844,364.47
Awarded: 5/20/2015
Period Ending: 10/14/2015
Board Accepted: 2/28/2017
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)5.00MTH 2.00 0.002.00$800.00$1,600.00
4IMPLEMENTATION OF THE SWPPP1.00LS 0.20 0.000.20$50,000.00$10,000.00
5TRAFFIC CONTROL1.00LS 0.20 0.000.20$79,000.00$15,800.00
6FLASHING ARROW SIGN5.00EA 1.00 0.001.00$1,665.00$1,665.00
13OFFICE FACILITIES1.00LS 0.20 0.000.20$14,000.00$2,800.00
14MOBILIZATION1.00LS 0.50 0.000.50$190,000.00$95,000.00
15CLEARING AND GRUBBING1.00LS 1.00 0.001.00$72,000.00$72,000.00
17CONCRETE REMOVAL (NON-REINFORCED)621.00CY 372.00 0.00372.00$135.00$50,220.00
19UNCLASSIFIED EXCAVATION506.00CY 510.30 0.00510.30$135.00$68,890.50
20CRUSHED MISCELLANEOUS BASE921.00CY 510.30 0.00510.30$83.00$42,354.90
21TRENCH BACKFILL SLURRY (CLASS 270-E-500)18.00CY 19.00 0.0019.00$180.00$3,420.00
31PCC CURB, TYPE A1-VAR356.00LF 154.00 0.00154.00$12.00$1,848.00
32PCC CURB & GUTTER, TYPE A2-81,571.00LF 1,601.00 0.001,601.00$20.00$32,020.00
34PCC WALK, DRIVES & CURB RAMPS, 4" THICK42,348.00SF 19,494.25 0.0019,494.25$3.35$65,305.74
35DETECTABLE WARNING SURFACE275.00SF 275.00 0.00275.00$26.00$7,150.00
36ALLEY INTERSECTION7.00CY 2.50 0.002.50$350.00$875.00
432" CONDUIT (SCH 80 PVC)500.00LF 480.00 0.00480.00$21.65$10,392.00
443" CONDUIT (SCH 80 PVC)375.00LF 350.00 0.00350.00$23.70$8,295.00
51NO. 5 PULL BOX INCL PCC COVER5.00EA 2.00 0.002.00$2.58$5.16
52NO. 6 PULL BOX INCL PCC COVER6.00EA 6.00 0.006.00$360.00$2,160.00
66TYPE 332 CABINET FOUNDATION1.00EA 1.00 0.001.00$1,040.00$1,040.00
74TYPE 1 STANDARD FOUNDATION2.00EA 2.00 0.002.00$515.00$1,030.00
75TYPE 15 STANDARD FOUNDATION3.00EA 3.00 0.003.00$1,545.00$4,635.00
76TYPE 17 STANDARD FOUNDATION2.00EA 2.00 0.002.00$2,575.00$5,150.00
77TYPE 24 STANDARD FOUNDATION2.00EA 2.00 0.002.00$3,600.00$7,200.00
S-3PCC DRIVE, 6" THICK SF 551.00 0.00551.00$5.00$2,755.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $531,111.30 $17,500.00 $513,611.30
Retained* $25,680.57 $0.00 $25,680.57
Deducted $0.00 $0.00 $0.00
Due $505,430.73 $17,500.00 $487,930.73



*This project has an escrow account.

Contact Office Engineer
Contractor Copy  