Los Angeles County Public Works
Project Management Division III
Progress Payment 7
Project Name: El Segundo Boulevard - Avalon Boulevard to Central Avenue, et al.
Contractor: Toro Enterprises, Inc.
P.O. Box 6285
Oxnard, CA 93031
Project ID: RDC0014453
Federal Number(s): None
Original Contract: $2,844,364.47
Awarded: 5/20/2015
Period Ending: 2/29/2016
Board Accepted: 2/28/2017
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
45#10 WIRE1,300.00LF 1,300.00 0.001,300.00$0.82$1,066.00
46#6 WIRE1,400.00LF 162.00 0.00162.00$1.05$170.10
472-PAIR DETECTOR LEAD-IN CABLE1,100.00LF 1,100.00 0.001,100.00$0.72$792.00
483-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)900.00LF 900.00 0.00900.00$0.62$558.00
495-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)250.00LF 230.00 0.00230.00$1.05$241.50
5012-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)1,100.00LF 1,100.00 0.001,100.00$2.60$2,860.00
54REMOVE TYPE 332 CABINET1.00EA 1.00 0.001.00$515.00$515.00
55REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.)4.00EA 4.00 3.001.00$515.00$515.00
60REMOVE CONTROLLER FOUNDATION1.00EA 1.00 0.001.00$1,030.00$1,030.00
62GPS UTB UNIT AND ANTENNA1.00EA 1.00 0.001.00$1,545.00$1,545.00
63SWITCH PACK8.00EA 8.00 0.008.00$41.00$328.00
64PED ISOLATION MODULE2.00EA 2.00 0.002.00$66.00$132.00
652-CHANNEL ILD SENSOR UNIT5.00EA 5.00 0.005.00$124.00$620.00
82150 W HPS LUMINAIRE3.00EA 3.00 0.003.00$371.00$1,113.00
83200 W HPS LUMINAIRE4.00EA 4.00 0.004.00$433.00$1,732.00
84PEDESTRIAN PUSH BUTTON8.00EA 8.00 0.008.00$103.00$824.00
85PEDESTRIAN PUSH BUTTON PLATE8.00EA 8.00 0.008.00$19.00$152.00
92DECOMPOSED GRANITE, 1" THICK2,396.00SF 1,446.00 1,000.00446.00$2.00$892.00
S-2LED LUMINAIRE UPGRADE LS 1.00 0.001.00$1,700.00$1,700.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $1,627,179.02 $1,610,393.42 $16,785.60
Retained* $80,483.96 $79,644.68 $839.28
Deducted $600.00 $600.00 $0.00
Due $1,546,095.06 $1,530,148.74 $15,946.32



*This project has an escrow account.

Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.