Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
3 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.20
| 0.05 | 0.15 | $11,000.00 | $1,650.00 |
4 | RESTORATION OF EXISTING IMPROVEMENTS | 1.00 | LS |
0.25
| 0.05 | 0.20 | $10,000.00 | $2,000.00 |
5 | TRAFFIC CONTROL | 1.00 | LS |
0.20
| 0.08 | 0.12 | $65,000.00 | $7,800.00 |
6 | FLASHING ARROW SIGN | 6.00 | EA |
2.00
| 1.00 | 1.00 | $2,500.00 | $2,500.00 |
7 | CHANGEABLE MESSAGE SIGN | 5.00 | EA |
5.00
| 2.00 | 3.00 | $6,000.00 | $18,000.00 |
10 | OFFICE FACILITIES | 1.00 | LS |
0.25
| 0.05 | 0.20 | $7,500.00 | $1,500.00 |
11 | MOBILIZATION | 1.00 | LS |
0.75
| 0.50 | 0.25 | $130,000.00 | $32,500.00 |
12 | CLEARING AND GRUBBING | 1.00 | LS |
0.30
| 0.08 | 0.22 | $100,000.00 | $22,000.00 |
14 | CONCRETE REMOVAL (NON-REINFORCED) | 2,271.00 | CY |
564.77
| 304.14 | 260.63 | $65.00 | $16,940.95 |
16 | UNCLASSIFIED EXCAVATION | 6,509.00 | CY |
1,467.19
| 563.12 | 904.07 | $46.00 | $41,587.22 |
18 | CRUSHED MISCELLANEOUS BASE | 5,465.00 | CY |
1,244.19
| 488.93 | 755.26 | $55.00 | $41,539.30 |
20 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 153.00 | CY |
51.85
| 19.75 | 32.10 | $220.00 | $7,062.00 |
23 | AC PAVEMENT(PATCH BACK) | 167.00 | TON |
168.00
| 76.13 | 91.87 | $175.00 | $16,077.25 |
38 | RECONSTRUCT LOCAL DEPRESSION PER STD PLAN 313-3, CASE E | 8.00 | EA |
1.00
| 0.00 | 1.00 | $900.00 | $900.00 |
50 | PCC CURB & GUTTER, TYPE A2-8 | 4,051.00 | LF |
1,077.00
| 11.00 | 1,066.00 | $25.50 | $27,183.00 |
52 | PCC CURB & GUTTER, TYPE A2-8, W=12" | 1,911.00 | LF |
911.00
| 789.00 | 122.00 | $26.00 | $3,172.00 |
54 | PCC WALK, DRIVES & CURB RAMPS, 4" THICK | 100,163.00 | SF |
36,805.91
| 19,723.16 | 17,082.75 | $4.50 | $76,872.38 |
55 | PCC DRIVEWAYS, 6" THICK | 10,639.00 | SF |
2,049.50
| 975.00 | 1,074.50 | $6.00 | $6,447.00 |
56 | DETECTABLE WARNING SURFACE | 1,275.00 | SF |
225.00
| 81.00 | 144.00 | $25.00 | $3,600.00 |
57 | CROSS GUTTER | 200.00 | CY |
122.93
| 2.47 | 120.46 | $325.00 | $39,149.50 |
59 | ALLEY INTERSECTION | 40.00 | CY |
5.95
| 4.07 | 1.88 | $325.00 | $611.00 |
65 | 2" CONDUIT (SCH 80 PVC) | 2,625.00 | LF |
1,018.00
| 0.00 | 1,018.00 | $25.00 | $25,450.00 |
66 | 3" CONDUIT (SCH 80 PVC) | 765.00 | LF |
411.00
| 15.00 | 396.00 | $30.00 | $11,880.00 |
73 | NO. 5 PULL BOX INCL PCC COVER | 10.00 | EA |
5.00
| 0.00 | 5.00 | $590.00 | $2,950.00 |
74 | NO. 6 PULL BOX INCL PCC COVER | 32.00 | EA |
9.00
| 0.00 | 9.00 | $675.00 | $6,075.00 |
90 | TYPE 1 STANDARD FOUNDATION | 3.00 | EA |
3.00
| 0.00 | 3.00 | $700.00 | $2,100.00 |
91 | TYPE 15 STANDARD FOUNDATION | 7.00 | EA |
7.00
| 4.00 | 3.00 | $1,500.00 | $4,500.00 |
92 | TYPE 19 STANDARD FOUNDATION | 6.00 | EA |
6.00
| 4.00 | 2.00 | $1,900.00 | $3,800.00 |
S-01 | POTHOLING UNDER 5' DEEP | | STIP |
4.00
| 0.00 | 4.00 | $300.00 | $1,200.00 |
S-02 | POTHOLING OVER 5' DEEP | | EA |
1.00
| 0.00 | 1.00 | $500.00 | $500.00 |
|