Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MTH) | 3.00 | MTH |
3.00
| 3.00 | 0.00 | $500.00 | $0.00 |
3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
4 | IMPLEMENTATION OF BMPS | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
5 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $60,000.00 | $0.00 |
6 | PREPARATION OF TRAFFIC CONTROL PLANS (CITIES) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $5,000.00 | $0.00 |
7 | CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $20,000) | 20,000.00 | AL |
3,275.00
| 3,275.00 | 0.00 | $1.00 | $0.00 |
8 | FLASHING ARROW SIGN | 2.00 | EA |
2.00
| 2.00 | 0.00 | $1,100.00 | $0.00 |
9 | CHANGEABLE MESSAGE SIGN | 2.00 | EA |
2.00
| 2.00 | 0.00 | $3,100.00 | $0.00 |
10 | OFFICE FACILITIES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
11 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $70,680.44 | $0.00 |
12 | CLEARING AND GRUBBING | 1.00 | LS |
0.75
| 0.75 | 0.00 | $47,000.00 | $0.00 |
13 | CONCRETE REMOVAL (NON-REINFORCED) | 347.00 | CY |
439.24
| 439.24 | 0.00 | $200.00 | $0.00 |
14 | CONCRETE REMOVAL (REINFORCED) | 5.00 | CY |
5.00
| 5.00 | 0.00 | $500.00 | $0.00 |
15 | UNCLASSIFIED EXCAVATION | 1,095.00 | CY |
922.51
| 922.51 | 0.00 | $92.00 | $0.00 |
16 | IMPORTED BORROW | 30.00 | CY |
8.00
| 8.00 | 0.00 | $70.00 | $0.00 |
17 | STABILIZATION GEOTEXTILE | 725.00 | SY |
720.00
| 720.00 | 0.00 | $3.00 | $0.00 |
18 | CRUSHED MISCELLANEOUS BASE | 522.00 | CY |
545.00
| 545.00 | 0.00 | $95.00 | $0.00 |
19 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 35.00 | CY |
41.83
| 41.83 | 0.00 | $110.00 | $0.00 |
20 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") | 681,000.00 | SF |
726,935.00
| 726,935.00 | 0.00 | $0.15 | $0.00 |
21 | AC PAVEMENT(PATCH BACK) | 129.00 | TON |
147.45
| 147.45 | 0.00 | $165.00 | $0.00 |
22 | AC PAVEMENT(DIGOUTS) | 271.00 | TON |
274.51
| 274.51 | 0.00 | $85.00 | $0.00 |
23 | AC PAVEMENT(LEVELING COURSE) | 169.00 | TON |
469.04
| 469.04 | 0.00 | $82.00 | $0.00 |
24 | RECONSTRUCT MANHOLE | 1.00 | EA |
0.00
| 0.00 | 0.00 | $3,100.00 | $0.00 |
25 | DOUBLE ADJUST MANHOLE | 23.00 | EA |
25.00
| 25.00 | 0.00 | $675.00 | $0.00 |
26 | PCC PAVEMENT (BUS PAD) | 98.00 | CY |
124.35
| 124.35 | 0.00 | $350.00 | $0.00 |
27 | ASPHALT RUBBER HOT MIX | 5,879.00 | TON |
6,086.36
| 6,086.36 | 0.00 | $80.00 | $0.00 |
28 | ASPHALT RUBBER HOT MIX (TEST STRIP) | 500.00 | TON |
500.00
| 500.00 | 0.00 | $94.00 | $0.00 |
29 | ASPHALT RUBBER AND AGGREGATE MEMBRANE | 75,602.00 | SY |
71,648.00
| 71,648.00 | 0.00 | $4.37 | $0.00 |
30 | CATCH BASIN MANHOLE FRAME AND COVER | 1.00 | EA |
1.00
| 1.00 | 0.00 | $360.00 | $0.00 |
31 | PCC CURB & GUTTER, TYPE A2-6 | 314.00 | LF |
300.00
| 300.00 | 0.00 | $25.00 | $0.00 |
32 | PCC CURB & GUTTER, TYPE A2-8 | 1,455.00 | LF |
1,662.83
| 1,662.83 | 0.00 | $27.00 | $0.00 |
33 | PCC CURB & GUTTER, TYPE A3-6 | 314.00 | LF |
300.00
| 300.00 | 0.00 | $25.00 | $0.00 |
34 | PCC WALK, DRIVES & CURB RAMPS, 4" THICK | 15,767.00 | SF |
16,864.12
| 16,864.12 | 0.00 | $5.60 | $0.00 |
35 | DETECTABLE WARNING SURFACE | 1,110.00 | SF |
372.00
| 372.00 | 0.00 | $28.50 | $0.00 |
36 | CROSS GUTTER | 49.00 | CY |
48.90
| 48.90 | 0.00 | $345.00 | $0.00 |
37 | ALLEY INTERSECTION | 6.00 | CY |
4.44
| 4.44 | 0.00 | $376.00 | $0.00 |
38 | FURNISH AND PLANT 15 GALLON TREE | 13.00 | EA |
12.00
| 12.00 | 0.00 | $415.00 | $0.00 |
39 | RECONSTRUCT PARKWAY CULVERT PER SECTION K-K ON SHEET 8 | 1.00 | LS |
1.00
| 1.00 | 0.00 | $4,400.00 | $0.00 |
40 | RECONSTRUCT RAIL TOP BOX CULVERT PER SECTION L-L ON SHEET 8 | 1.00 | LS |
1.00
| 1.00 | 0.00 | $13,000.00 | $0.00 |
41 | RECONSTRUCT LOCAL DEPRESSION PER STD PLAN 313-3 CASE E | 3.00 | EA |
3.00
| 3.00 | 0.00 | $1,200.00 | $0.00 |
42 | CLASS "A" TOP SOIL | 4.00 | CY |
0.00
| 0.00 | 0.00 | $155.00 | $0.00 |
43 | STORM WATER FILTRATION BASIN | 10.00 | EA |
10.00
| 10.00 | 0.00 | $3,400.00 | $0.00 |
44 | COMPACTED FILL | 62.00 | CY |
50.00
| 50.00 | 0.00 | $48.00 | $0.00 |
45 | NO. 3 CONCRETE AGGREGATE | 98.00 | CY |
93.30
| 93.30 | 0.00 | $50.00 | $0.00 |
46 | 6" SCH 80 PVC PIPE | 652.00 | LF |
700.00
| 700.00 | 0.00 | $75.00 | $0.00 |
47 | 60 MIL HDPE LINER | 309.00 | SY |
309.00
| 309.00 | 0.00 | $10.00 | $0.00 |
48 | 2" CONDUIT (SCH 80 PVC) | 1,345.00 | LF |
1,274.00
| 1,274.00 | 0.00 | $31.30 | $0.00 |
49 | 3" CONDUIT (SCH 80 PVC) | 555.00 | LF |
705.00
| 705.00 | 0.00 | $70.00 | $0.00 |
50 | 2-PAIR DETECTOR LEAD-IN CABLE | 4,900.00 | LF |
4,178.00
| 4,178.00 | 0.00 | $0.91 | $0.00 |
51 | NO. 5 PULL BOX INCL PCC COVER | 5.00 | EA |
5.00
| 5.00 | 0.00 | $303.00 | $0.00 |
52 | NO. 6 PULL BOX INCL PCC COVER | 11.00 | EA |
11.00
| 11.00 | 0.00 | $606.00 | $0.00 |
53 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT | 13,805.00 | LF |
11,427.00
| 11,427.00 | 0.00 | $9.29 | $0.00 |
54 | 2-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $25,500.00 | $0.00 |
55 | 3-CAMERA VIDEO DETECTION SYSTEM (COMPLETE) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $37,700.00 | $0.00 |
56 | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) | 1.00 | EA |
0.00
| 0.00 | 0.00 | $606.00 | $0.00 |
57 | REMOVE VEHICLE HEAD (COMPLETE) | 25.00 | EA |
23.00
| 23.00 | 0.00 | $152.00 | $0.00 |
58 | REMOVE PEDESTRIAN HEAD (COMPLETE) | 31.00 | EA |
31.00
| 31.00 | 0.00 | $101.00 | $0.00 |
59 | REMOVE PEDESTRIAN PUSH BUTTON | 31.00 | EA |
31.00
| 31.00 | 0.00 | $51.00 | $0.00 |
60 | REMOVE TYPE 15 FOUNDATION | 1.00 | EA |
0.00
| 0.00 | 0.00 | $1,220.00 | $0.00 |
61 | RELOCATE RETRO REFLECTIVE STREET NAME SIGN | 6.00 | EA |
0.00
| 0.00 | 0.00 | $260.00 | $0.00 |
62 | TYPE 15 STANDARD | 1.00 | EA |
0.00
| 0.00 | 0.00 | $2,500.00 | $0.00 |
63 | TYPE 15 STANDARD FOUNDATION | 1.00 | EA |
0.00
| 0.00 | 0.00 | $2,300.00 | $0.00 |
64 | PEDESTRIAN PUSH BUTTON | 32.00 | EA |
32.00
| 32.00 | 0.00 | $76.00 | $0.00 |
65 | PEDESTRIAN PUSH BUTTON PLATE | 32.00 | EA |
32.00
| 32.00 | 0.00 | $16.00 | $0.00 |
66 | 3-12" LED VEHICLE HEAD (COMPLETE) | 29.00 | EA |
27.00
| 27.00 | 0.00 | $780.00 | $0.00 |
67 | LED PEDESTRIAN HEAD (COMPLETE) | 32.00 | EA |
32.00
| 32.00 | 0.00 | $505.00 | $0.00 |
68 | DETAIL 8 (THERMOPLASTIC) | 240.00 | LF |
174.00
| 174.00 | 0.00 | $1.01 | $0.00 |
69 | DETAIL 9 (THERMOPLASTIC) | 21,515.00 | LF |
19,722.00
| 19,722.00 | 0.00 | $0.45 | $0.00 |
70 | DETAIL 21 (THERMOPLASTIC) | 150.00 | LF |
128.00
| 128.00 | 0.00 | $4.04 | $0.00 |
71 | DETAIL 22 (THERMOPLASTIC) | 6,967.00 | LF |
7,579.00
| 7,579.00 | 0.00 | $1.21 | $0.00 |
72 | DETAIL 27B (THERMOPLASTIC) | 29,320.00 | LF |
26,214.00
| 26,214.00 | 0.00 | $0.30 | $0.00 |
73 | DETAIL 29 (THERMOPLASTIC) | 1,725.00 | LF |
728.00
| 728.00 | 0.00 | $1.62 | $0.00 |
74 | DETAIL 32 (THERMOPLASTIC) | 8,275.00 | LF |
8,413.00
| 8,413.00 | 0.00 | $1.62 | $0.00 |
75 | DETAIL 37B (THERMOPLASTIC) | 1,855.00 | LF |
2,398.00
| 2,398.00 | 0.00 | $1.16 | $0.00 |
76 | DETAIL 38 (THERMOPLASTIC) | 6,215.00 | LF |
5,305.00
| 5,305.00 | 0.00 | $1.11 | $0.00 |
77 | DETAIL 38A (THERMOPLASTIC) | 525.00 | LF |
523.00
| 523.00 | 0.00 | $1.31 | $0.00 |
78 | DETAIL 39 (THERMOPLASTIC) | 29,390.00 | LF |
26,668.00
| 26,668.00 | 0.00 | $0.40 | $0.00 |
79 | DETAIL 39A (THERMOPLASTIC) | 22,915.00 | LF |
23,358.00
| 23,358.00 | 0.00 | $0.61 | $0.00 |
80 | DETAIL 40 (THERMOPLASTIC) | 685.00 | LF |
287.00
| 287.00 | 0.00 | $1.62 | $0.00 |
81 | DETAIL 41 (THERMOPLASTIC) | 430.00 | LF |
203.00
| 203.00 | 0.00 | $1.62 | $0.00 |
82 | PAVEMENT MARKINGS (THERMOPLASTIC) | 6,275.00 | SF |
6,720.00
| 6,720.00 | 0.00 | $5.05 | $0.00 |
83 | 6" STRIPING (THERMOPLASTIC) | 825.00 | LF |
328.00
| 328.00 | 0.00 | $1.01 | $0.00 |
84 | 8" STRIPING (THERMOPLASTIC) | 3,320.00 | LF |
1,358.00
| 1,358.00 | 0.00 | $0.96 | $0.00 |
85 | 12" STRIPING (THERMOPLASTIC) | 5,135.00 | LF |
4,550.00
| 4,550.00 | 0.00 | $2.52 | $0.00 |
86 | 24" STRIPING (THERMOPLASTIC) | 595.00 | LF |
360.00
| 360.00 | 0.00 | $4.75 | $0.00 |
87 | CURB MARKINGS (ONE-COAT PAINT) | 1,375.00 | LF |
1,183.00
| 1,183.00 | 0.00 | $0.81 | $0.00 |
88 | REMOVE DETAIL 8 (PAINT) | 13,405.00 | LF |
0.00
| 0.00 | 0.00 | $0.30 | $0.00 |
89 | REMOVE DETAIL 9 (PAINT) | 22,370.00 | LF |
0.00
| 0.00 | 0.00 | $0.30 | $0.00 |
90 | REMOVE DETAIL 21 (PAINT) | 4,210.00 | LF |
0.00
| 0.00 | 0.00 | $1.21 | $0.00 |
91 | REMOVE DETAIL 22 (PAINT) | 5,555.00 | LF |
0.00
| 0.00 | 0.00 | $1.21 | $0.00 |
92 | REMOVE DETAIL 37B (PAINT) | 3,950.00 | LF |
0.00
| 0.00 | 0.00 | $0.61 | $0.00 |
93 | REMOVE DETAIL 38 (PAINT) | 220.00 | LF |
0.00
| 0.00 | 0.00 | $4.04 | $0.00 |
94 | REMOVE DETAIL 38A (PAINT) | 920.00 | LF |
0.00
| 0.00 | 0.00 | $1.31 | $0.00 |
95 | REMOVE DETAIL 40 (PAINT) | 645.00 | LF |
0.00
| 0.00 | 0.00 | $1.01 | $0.00 |
96 | REMOVE PAVEMENT MARKINGS (PAINT) | 1,665.00 | SF |
0.00
| 0.00 | 0.00 | $2.22 | $0.00 |
97 | REMOVE 12" STRIPING (PAINT) | 125.00 | LF |
0.00
| 0.00 | 0.00 | $4.04 | $0.00 |
98 | INSTALL FIRE HYDRANT LOCATION RPM | 24.00 | EA |
54.00
| 54.00 | 0.00 | $25.25 | $0.00 |
S-01 | REPLACE SPEC SECTION 7-2.7 | | LS |
1.00
| 1.00 | 0.00 | $0.00 | $0.00 |
S-02 | REMOVE AND REINSTALL TRAFFIC SENSORS | | LS |
1.00
| 1.00 | 0.00 | $21,275.00 | $0.00 |
S-3 | REMOVE DETAIL 8 (THERMO) | | LF |
10,100.00
| 10,100.00 | 0.00 | $0.41 | $0.00 |
S-4 | REMOVE DETAIL 9 (THERMO) | | LF |
23,493.00
| 23,493.00 | 0.00 | $0.47 | $0.00 |
S-5 | REMOVE DETAIL 21 (THERMO) | | LF |
0.00
| 0.00 | 0.00 | $1.22 | $0.00 |
S-6 | REMOVE DETAIL 22 (THERMO) | | LF |
8,686.00
| 8,686.00 | 0.00 | $1.34 | $0.00 |
S-7 | REMOVE DETAIL 37B (THERMO) | | LF |
449.00
| 449.00 | 0.00 | $1.22 | $0.00 |
S-8 | REMOVE DETAIL 38 (THERMO) | | LF |
1,076.00
| 1,076.00 | 0.00 | $1.30 | $0.00 |
S-9 | REMOVE DETAIL 38A (THERMO) | | LF |
0.00
| 0.00 | 0.00 | $1.16 | $0.00 |
S-10 | REMOVE DETAIL 40 (THERMO) | | LF |
682.00
| 682.00 | 0.00 | $2.33 | $0.00 |
S-11 | REMOVE PAVEMENT MARKINGS (THERMO) | | SF |
3,312.00
| 3,312.00 | 0.00 | $5.82 | $0.00 |
S-12 | REMOVE 12" STRIPING (THERMO) | | LF |
118.00
| 118.00 | 0.00 | $3.49 | $0.00 |
S-13 | ADD PUSH BUTTON PEDESTAL | | LS |
1.00
| 1.00 | 0.00 | $4,743.00 | $0.00 |
S-14 | INSTALL 12 & 3 CONDUCTOR WIRING @ FIRESTONE AND COMPTON | | T&M |
9,043.25
| 9,043.25 | 0.00 | $1.00 | $0.00 |
S-15 | INSTALL 12 & 3 CONDUCTOR WIRING AT LA CIENEGA AND 120TH | | T&M |
10,917.61
| 10,917.61 | 0.00 | $1.00 | $0.00 |
S-16 | EXPLORATORY EXCAVATIONS | | T&M |
32,772.24
| 32,772.24 | 0.00 | $1.00 | $0.00 |
S-17 | INSTALL TENONS - CENTURY @ NORMANDIE | | LS |
1.00
| 1.00 | 0.00 | $5,060.00 | $0.00 |
S-18 | EXTEND NTP 1 | | WD |
62.00
| 62.00 | 0.00 | $0.00 | $0.00 |
|