Project Name: Los Palacios Drive, et al.
Contractor: Toro Enterprises, Inc.
P.O. Box 6285
Oxnard, CA 93031
Project ID: RDC0015249
Federal Number(s): None
Original Contract: $3,529,621.00
Awarded: 4/2/2014
Period Ending: 10/6/2014
Board Accepted: 10/5/2016
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)5.00MTH 2.00 1.001.00$700.00$700.00
4IMPLEMENTATION OF THE SWPPP1.00LS 0.40 0.200.20$48,000.00$9,600.00
5TRAFFIC CONTROL1.00LS 0.35 0.200.15$69,000.00$10,350.00
6OFFICE FACILITIES1.00LS 0.45 0.250.20$17,000.00$3,400.00
7MOBILIZATION1.00LS 0.95 0.000.95$215,000.00$204,250.00
8CLEARING AND GRUBBING1.00LS 0.35 0.250.10$6,500.00$650.00
9ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER)68.00EA 26.00 17.009.00$169.00$1,521.00
10TREE REMOVAL28.00EA 35.00 16.0019.00$742.00$14,098.00
11STUMP REMOVAL ONLY (13"-24" DIAMETER)1.00EA 1.00 0.001.00$106.00$106.00
12CROWN REDUCTION, TREE (13" - 24" DIAMETER)59.00EA 22.00 17.005.00$295.00$1,475.00
13CONCRETE REMOVAL (NON-REINFORCED)1,330.00CY 1,134.73 657.94476.79$129.00$61,505.91
14UNCLASSIFIED EXCAVATION9,105.00CY 1,263.10 808.53454.57$48.00$21,819.36
15CRUSHED MISCELLANEOUS BASE1,525.00CY 1,263.10 808.53454.57$58.00$26,365.06
28PCC CURB, TYPE A1-8670.00LF 257.00 47.50209.50$15.00$3,142.50
29PCC CURB & GUTTER, TYPE A2-6247.00LF 247.00 127.00120.00$25.00$3,000.00
30PCC CURB & GUTTER, TYPE A2-81,717.00LF 1,717.00 1,120.00597.00$18.00$10,746.00
31PCC WALK, DRIVES & CURB RAMPS, 4" THICK49,973.00SF 42,385.00 16,456.3325,928.67$3.35$86,861.04
32PCC DRIVEWAYS, 6" THICK2,114.00SF 931.60 0.00931.60$5.00$4,658.00
33DETECTABLE WARNING SURFACE1,620.00SF 882.00 441.00441.00$27.00$11,907.00
34CROSS GUTTER441.00CY 374.24 301.4072.84$206.00$15,005.04
35ALLEY INTERSECTION104.00CY 38.44 0.0038.44$210.00$8,072.40
392-PAIR DETECTOR LEAD-IN CABLE820.00LF 810.00 0.00810.00$2.15$1,741.50
4012-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT)120.00LF 120.00 0.00120.00$6.35$762.00
44REMOVE VEHICLE HEAD (COMPLETE)8.00EA 8.00 0.008.00$48.00$384.00
45TYPE 1 STANDARD1.00EA 1.00 0.001.00$1,600.00$1,600.00
473-12" LED VEHICLE HEAD (COMPLETE) 12.00EA 12.00 0.0012.00$742.00$8,904.00
S-2INSTALL GEOTEXTILE FABRIC EA 11.00 8.003.00$390.00$1,170.00
S-3ADDITIONAL TREE REMOVAL  EA 9.00 0.009.00$640.00$5,760.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $922,448.86 $402,895.05 $519,553.81
Retained* $45,622.45 $19,644.76 $25,977.69
Deducted $0.00 $0.00 $0.00
Due $876,826.41 $383,250.29 $493,576.12