Los Angeles County Public Works
Project Management Division III
Progress Payment 3
Project Name: Huntington Drive - San Gabriel Bl/132' West of Michillinda Avenue
Contractor: Sequel Contractors, Inc.
13546 Imperial Highway
Santa Fe Springs, CA 90670
Project ID: RDC0015735
Federal Number(s): None
Original Contract: $4,745,494.75
Awarded: 8/3/2021
Period Ending: 7/6/2022
Board Accepted: 2/13/2024
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)12.00MTH 3.00 2.001.00$500.00$500.00
7IMPLEMENTATION OF THE SWPPP1.00LS 0.50 0.400.10$20,000.00$2,000.00
9OFFICE FACILITIES13.00MTH 4.00 3.001.00$2,500.00$2,500.00
12CONCRETE REMOVAL (NON-REINFORCED)395.00CY 272.71 172.62100.09$160.00$16,014.40
13CONCRETE REMOVAL (REINFORCED)32.00CY 2.00 1.001.00$175.00$175.00
14UNCLASSIFIED EXCAVATION1,903.00CY 762.96 372.14390.82$98.00$38,300.36
16CRUSHED MISCELLANEOUS BASE2,063.00CY 51.38 0.0051.38$20.00$1,027.60
19COLD MILL AC PAVEMENT (> 3")713,350.00SF 100,460.00 0.00100,460.00$0.67$67,308.20
21AC PAVEMENT11,384.00TON 1,694.02 0.001,694.02$71.00$120,275.42
22AC PAVEMENT(PATCH BACK)52.00TON 30.07 20.0010.07$550.00$5,538.50
23RECONSTRUCT MANHOLE15.00EA 1.00 0.001.00$2,500.00$2,500.00
25ADJUST WATER VALVE FRAME AND COVER TO NEW GRADE17.00EA 3.00 0.003.00$600.00$1,800.00
27PCC PAVEMENT126.00CY 46.52 0.0046.52$350.00$16,282.00
30DRILL AND BOND DOWEL534.00LF 120.00 0.00120.00$7.00$840.00
38PCC CURB, TYPE A1-VAR124.00LF 27.00 0.0027.00$38.00$1,026.00
41PCC CURB & GUTTER, TYPE A2-VAR492.00LF 193.00 40.00153.00$40.00$6,120.00
44PCC WALK, 4" THICK2,498.00SF 1,944.46 0.001,944.46$15.00$29,166.90
45PCC CURB RAMPS40.00CY 12.21 0.0012.21$1,400.00$17,094.00
46DETECTABLE WARNING SURFACE307.00SF 87.00 0.0087.00$15.00$1,305.00
116TRAFFIC CONTROL1.00LS 0.50 0.400.10$200,000.00$20,000.00
118CHANGEABLE MESSAGE SIGN2.00EA 1.20 1.000.20$40,000.00$8,000.00

DEDUCTION DETAIL

There are NO deductions this period

FINANCIAL SUMMARY

  Total Previous Current
Earned $1,209,909.20 $852,135.82 $357,773.38
Retained $60,495.47 $42,606.80 $17,888.67
Deducted $0.00 $0.00 $0.00
Due $1,149,413.73 $809,529.02 $339,884.71



Contact Office Engineer
Contractor Copy  
P Please consider the environment before printing this report.