Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
7 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.80
| 0.70 | 0.10 | $20,000.00 | $2,000.00 |
9 | OFFICE FACILITIES | 13.00 | MTH |
7.00
| 6.00 | 1.00 | $2,500.00 | $2,500.00 |
14 | UNCLASSIFIED EXCAVATION | 1,903.00 | CY |
1,583.02
| 1,556.36 | 26.66 | $98.00 | $2,612.68 |
22 | AC PAVEMENT(PATCH BACK) | 52.00 | TON |
41.87
| 30.07 | 11.80 | $550.00 | $6,490.00 |
116 | TRAFFIC CONTROL | 1.00 | LS |
0.80
| 0.70 | 0.10 | $200,000.00 | $20,000.00 |
118 | CHANGEABLE MESSAGE SIGN | 2.00 | EA |
1.50
| 1.40 | 0.10 | $40,000.00 | $4,000.00 |
122 | IRRIGATION SYSTEM | 1.00 | LS |
0.85
| 0.75 | 0.10 | $95,000.00 | $9,500.00 |
126 | DRAINAGE SUMP WITH ATRIUM GRATE DRAIN | 7.00 | EA |
7.00
| 0.00 | 7.00 | $500.00 | $3,500.00 |
127 | ALUMINUM EDGING | 9,661.00 | LF |
3,899.00
| 534.00 | 3,365.00 | $10.00 | $33,650.00 |
S-05 | CRUSHED ROCK PAVING | | SF |
9,338.20
| 0.00 | 9,338.20 | $3.98 | $37,166.04 |
S-06 | RIVER ROCK PAVING @ RETENTION BASIN | | SF |
8,482.50
| 0.00 | 8,482.50 | $7.16 | $60,734.70 |
S-07 | GROUTED RIVER ROCK PAVING | | SF |
6,703.00
| 2,045.00 | 4,658.00 | $12.99 | $60,507.42 |
S-08 | REMOVE OLD IRRIGATION SYSTEM | | LS |
0.40
| 0.30 | 0.10 | $15,000.00 | $1,500.00 |
|