Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 12.00 | MTH |
7.00
| 6.00 | 1.00 | $500.00 | $500.00 |
5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.55
| 0.44 | 0.11 | $41,600.00 | $4,576.00 |
6 | OFFICE FACILITIES | 12.00 | MTH |
7.00
| 6.00 | 1.00 | $4,200.00 | $4,200.00 |
9 | CLEARING AND GRUBBING | 1.00 | LS |
0.55
| 0.44 | 0.11 | $58,000.00 | $6,380.00 |
10 | TRAFFIC CONTROL | 1.00 | LS |
0.55
| 0.44 | 0.11 | $275,000.00 | $30,250.00 |
11 | FLASHING ARROW SIGN | 3.00 | EA |
2.00
| 0.00 | 2.00 | $10,000.00 | $20,000.00 |
12 | CHANGEABLE MESSAGE SIGN | 8.00 | EA |
7.00
| 6.00 | 1.00 | $13,000.00 | $13,000.00 |
19 | CONCRETE REMOVAL (NON-REINFORCED) | 1,724.00 | CY |
712.08
| 471.88 | 240.20 | $166.00 | $39,873.20 |
20 | CONCRETE REMOVAL (REINFORCED) | 180.00 | CY |
178.45
| 168.45 | 10.00 | $210.00 | $2,100.00 |
21 | UNCLASSIFIED EXCAVATION | 1,848.00 | CY |
1,826.00
| 1,386.00 | 440.00 | $105.00 | $46,200.00 |
24 | CRUSHED MISCELLANEOUS BASE | 203.00 | CY |
127.31
| 108.51 | 18.80 | $117.00 | $2,199.60 |
29 | AC PAVEMENT | 5,601.00 | TON |
2,507.42
| 2,472.42 | 35.00 | $82.00 | $2,870.00 |
40 | CATCH BASIN PER STD PLAN 300, W=3 | 1.00 | EA |
1.00
| 0.00 | 1.00 | $5,700.00 | $5,700.00 |
48 | JUNCTION STRUCTURE PER STD PLAN 331 | 1.00 | EA |
1.00
| 0.00 | 1.00 | $4,650.00 | $4,650.00 |
49 | CURB DRAIN PER STD PLAN 150, N=1, CASE 3 INLET | 13.00 | EA |
8.00
| 4.00 | 4.00 | $300.00 | $1,200.00 |
53 | PCC CURB, TYPE A1-6 | 817.00 | LF |
817.00
| 0.00 | 817.00 | $25.00 | $20,425.00 |
55 | PCC CURB & GUTTER, TYPE A2-6 | 10,356.00 | LF |
5,409.00
| 4,144.00 | 1,265.00 | $28.00 | $35,420.00 |
56 | PCC CURB & GUTTER, TYPE A2-8 | 4,136.00 | LF |
3,016.00
| 2,316.00 | 700.00 | $30.00 | $21,000.00 |
59 | LONGITUDINAL GUTTER | 140.00 | CY |
104.10
| 92.25 | 11.85 | $400.00 | $4,740.00 |
60 | PCC WALK & DRIVEWAYS, 4" THICK | 82,924.00 | SF |
36,853.00
| 28,135.00 | 8,718.00 | $5.50 | $47,949.00 |
61 | PCC CURB RAMPS | 94.00 | CY |
50.61
| 45.84 | 4.77 | $870.00 | $4,149.90 |
66 | DETECTABLE WARNING SURFACE | 915.00 | SF |
630.00
| 600.00 | 30.00 | $41.00 | $1,230.00 |
67 | CROSS GUTTER | 82.00 | CY |
56.66
| 37.43 | 19.23 | $500.00 | $9,615.00 |
68 | ALLEY INTERSECTION | 10.00 | CY |
9.01
| 4.69 | 4.32 | $400.00 | $1,728.00 |
71 | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE | 17,914.00 | LB |
11,720.00
| 0.00 | 11,720.00 | $0.25 | $2,930.00 |
80 | 18" RCP, 2000 D | 18.00 | LF |
16.00
| 0.00 | 16.00 | $360.00 | $5,760.00 |
83 | CONCRETE COLLAR FOR CONNECTOR PIPE | 1.00 | EA |
1.00
| 0.00 | 1.00 | $1,060.00 | $1,060.00 |
85 | 2" CONDUIT (SCH 80 PVC) | 535.00 | LF |
169.00
| 131.00 | 38.00 | $49.00 | $1,862.00 |
86 | 3" CONDUIT (SCH 80 PVC) | 1,250.00 | LF |
609.50
| 430.00 | 179.50 | $51.00 | $9,154.50 |
92 | NO. 5 PULL BOX INCL PCC COVER | 10.00 | EA |
7.00
| 2.00 | 5.00 | $310.00 | $1,550.00 |
93 | NO. 6 PULL BOX INCL PCC COVER | 34.00 | EA |
10.00
| 0.00 | 10.00 | $450.00 | $4,500.00 |
94 | NO. 6 PULL BOX EXTENSION | 5.00 | EA |
1.00
| 0.00 | 1.00 | $390.00 | $390.00 |
95 | 11"X21"X12" POLYMER CONCRETE PULL BOX & COVER ASSEMBLY - TYPE 2 | 7.00 | EA |
4.00
| 0.00 | 4.00 | $440.00 | $1,760.00 |
101 | REMOVE TYPE 1 STANDARD (COMPLETE) (EXCL. FOUND.) | 16.00 | EA |
4.00
| 0.00 | 4.00 | $171.00 | $684.00 |
102 | REMOVE TYPE 15 STANDARD (COMPLETE) (EXCL. FOUND.) | 8.00 | EA |
1.00
| 0.00 | 1.00 | $550.00 | $550.00 |
104 | REMOVE TYPE 17 STANDARD (COMPLETE) (EXCL. FOUND.) | 5.00 | EA |
3.00
| 0.00 | 3.00 | $740.00 | $2,220.00 |
106 | REMOVE STREET LIGHT FOUNDATION | 7.00 | EA |
3.00
| 0.00 | 3.00 | $2,000.00 | $6,000.00 |
107 | REMOVE TYPE 1 FOUNDATION | 16.00 | EA |
7.00
| 0.00 | 7.00 | $1,000.00 | $7,000.00 |
108 | REMOVE TYPE 15 FOUNDATION | 10.00 | EA |
1.00
| 0.00 | 1.00 | $2,600.00 | $2,600.00 |
109 | REMOVE TYPE 17 FOUNDATION | 5.00 | EA |
3.00
| 0.00 | 3.00 | $3,100.00 | $9,300.00 |
114 | RELOCATE STREET LIGHT WITH NEW FOUNDATION | 7.00 | EA |
0.90
| 3.10 | -2.20 | $2,780.00 | ($6,116.00) |
131 | TYPE 15 STANDARD FOUNDATION | 6.00 | EA |
3.67
| 0.33 | 3.34 | $1,800.00 | $6,012.00 |
132 | TYPE 17 STANDARD FOUNDATION | 11.00 | EA |
3.39
| 0.61 | 2.78 | $5,100.00 | $14,178.00 |
178 | DECOMPOSED GRANITE, 3" THICK | 6,936.00 | SF |
5,621.25
| 0.00 | 5,621.25 | $3.65 | $20,517.56 |
180 | SHORING OF OPEN EXCAVATIONS | 1.00 | LS |
1.00
| 0.00 | 1.00 | $13,220.00 | $13,220.00 |
185 | AC PAVEMENT | 159.00 | TON |
15.84
| 0.00 | 15.84 | $120.00 | $1,900.80 |
186 | CATCH BASIN PER STD PLAN 300, W=7 | 3.00 | EA |
1.00
| 0.00 | 1.00 | $8,450.00 | $8,450.00 |
194 | TRANSITION STRUCTURE PER STD PLAN 340 | 2.00 | EA |
1.00
| 0.00 | 1.00 | $6,700.00 | $6,700.00 |
201 | SUPPORT FOR 8" OR LESS WATERLINE | 4.00 | EA |
1.00
| 0.00 | 1.00 | $1,100.00 | $1,100.00 |
202 | SUPPORT FOR 20" WATERLINE | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,500.00 | $2,500.00 |
203 | SUPPORT FOR 24" AND LESS MISC UTILITIES | 4.00 | EA |
1.00
| 0.00 | 1.00 | $1,830.00 | $1,830.00 |
204 | SUPPORT FOR 24" SEWER PER COUNTY SANITATION STD S-A-217 | 1.00 | EA |
1.00
| 0.00 | 1.00 | $4,000.00 | $4,000.00 |
208 | 30" RCP, 2000 D | 1,508.00 | LF |
688.00
| 0.00 | 688.00 | $250.00 | $172,000.00 |
|