Los Angeles County Public Works
Project Management Division III
As-Built 11
Project Name: McDonnell Avenue, et al.
Contractor: Sully-Miller Contracting Company
135 South State College Boulevard, Suite 400
Brea, CA 92821
Project ID: RDC0015818
Federal Number(s): None
Original Contract: $3,076,035.42
Awarded: 10/18/2016
Period Ending: 12/28/2017
Board Accepted: 12/21/2017
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 1.000.00$1,000.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MTH)6.00MTH 6.00 6.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 1.000.00$1,000.00$0.00
4PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $15,000)1.00LS 1.00 1.000.00$15,000.00$0.00
5IMPLEMENTATION OF THE SWPPP1.00LS 1.00 1.000.00$10,000.00$0.00
6TRAFFIC CONTROL1.00LS 1.00 1.000.00$30,000.00$0.00
7OFFICE FACILITIES1.00LS 1.00 1.000.00$27,400.00$0.00
8MOBILIZATION1.00LS 1.00 1.000.00$86,900.00$0.00
9CLEARING AND GRUBBING1.00LS 1.00 1.000.00$20,000.00$0.00
10ROOT PRUNE TREE, FURNISH AND INSTALL ROOT CONTROL BARRIER14.00EA 13.00 13.000.00$770.00$0.00
11STUMP REMOVAL ONLY (6"-12" DIAMETER)9.00EA 7.00 7.000.00$215.00$0.00
12STUMP REMOVAL ONLY (13"-24" DIAMETER)28.00EA 28.00 28.000.00$500.00$0.00
13STUMP REMOVAL ONLY (25"+ DIAMETER)12.00EA 12.00 12.000.00$600.00$0.00
14REMOVE EXISTING CHAIN LINK FENCE74.00LF 74.00 74.000.00$4.90$0.00
15REMOVE EXISTING WROUGHT IRON FENCE82.00LF 76.00 76.000.00$6.75$0.00
16REMOVE EXISTING WOOD FENCE49.00LF 29.00 29.000.00$6.40$0.00
17ADJUST SLIDING GATE AND TRACKS1.00EA 1.00 1.000.00$6,300.00$0.00
18ADJUST WROUGHT IRON GATE1.00EA 1.00 1.000.00$2,900.00$0.00
19CONCRETE REMOVAL (NON-REINFORCED)927.00CY 927.00 927.000.00$145.00$0.00
20CONCRETE REMOVAL (REINFORCED)15.00CY 8.00 8.000.00$260.00$0.00
21UNCLASSIFIED EXCAVATION4,281.00CY 4,876.50 4,876.500.00$60.00$0.00
22CRUSHED MISCELLANEOUS BASE65.00CY 60.00 60.000.00$63.00$0.00
23TRENCH BACKFILL SLURRY (CLASS 270-E-500)30.00CY 25.00 25.000.00$150.00$0.00
24CEMENT STABILIZED PULVERIZED BASE, 8" THICK51,709.00SY 51,702.00 51,702.000.00$4.50$0.00
25PORTLAND CEMENT FOR CSPB1,013.00TON 951.39 951.390.00$139.00$0.00
26PRIME/TACK COAT FOR CSPB10,349.00GAL 8,317.00 8,317.000.00$6.15$0.00
27COLD MILL AC PAVEMENT (> 1-1/2 - 3")409,578.00SF 409,578.00 409,578.000.00$0.19$0.00
28COLD MILL AC PAVEMENT (> 3")193,575.00SF 193,575.00 193,575.000.00$0.23$0.00
29AC PAVEMENT(PATCH BACK)41.00TON 41.00 41.000.00$230.00$0.00
30AC PAVEMENT(LEVELING COURSE)621.00TON 621.00 621.000.00$79.00$0.00
31RECONSTRUCT MANHOLE76.00EA 71.00 71.000.00$1,500.00$0.00
32ADJUST MANHOLE2.00EA 2.00 2.000.00$385.00$0.00
33DOUBLE ADJUST MANHOLE6.00EA 6.00 6.000.00$770.00$0.00
34ASPHALT RUBBER HOT MIX5,154.00TON 5,091.82 5,091.820.00$77.00$0.00
35ASPHALT RUBBER HOT MIX (TEST STRIP)500.00TON 498.76 498.760.00$100.00$0.00
36ASPHALT RUBBER AND AGGREGATE MEMBRANE15,544.00SY 15,544.00 15,544.000.00$6.20$0.00
37EMULSIFIED RECYCLING AGENT266.00TON 254.00 254.000.00$455.00$0.00
38COLD CENTRAL PLANT RECYCLED ASPHALT CONCRETE PAVEMENT (CCPRACP), 3" THICK51,726.00SY 51,702.00 51,702.000.00$5.90$0.00
39PIPE CONNECTION PER STD PLAN 335, CASE 19.00EA 9.00 9.000.00$560.00$0.00
40CURB DRAIN PER STD PLAN 150, N=1, CASE 3 INLET6.00EA 6.00 6.000.00$222.00$0.00
41CURB DRAIN PER STD PLAN 150, N=2, CASE 3 INLET3.00EA 3.00 3.000.00$222.00$0.00
42REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 38.00SF 8.00 8.000.00$300.00$0.00
43PCC FOOTING FOR REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 31.00CY 1.00 1.000.00$5,700.00$0.00
44CONCRETE BLOCK SLOUGH WALL PER STD PLAN 62236.00SF 36.00 36.000.00$290.00$0.00
45PCC FOOTING FOR CONCRETE BLOCK SLOUGH WALL PER STD PLAN 6221.00CY 1.00 1.000.00$5,700.00$0.00
46CONCRETE SLOUGH WALL PER STD PLAN 6203, CASE I4.00CY 4.00 4.000.00$2,700.00$0.00
47PCC CURB, TYPE A1-698.00LF 98.00 98.000.00$21.50$0.00
48PCC CURB, TYPE A1-VAR11.00LF 11.00 11.000.00$25.00$0.00
49PCC CURB & GUTTER, TYPE A2-64,191.00LF 3,981.00 3,981.000.00$26.00$0.00
50PCC CURB & GUTTER, TYPE A2-8696.00LF 696.00 696.000.00$25.00$0.00
51PCC CURB & GUTTER, TYPE A2-VAR83.00LF 58.00 58.000.00$27.00$0.00
52PCC CURB & GUTTER, TYPE A3-8596.00LF 596.00 596.000.00$27.80$0.00
53PCC WALK, DRIVES & CURB RAMPS, 4" THICK42,145.00SF 39,981.00 39,981.000.00$5.90$0.00
54DETECTABLE WARNING SURFACE1,200.00SF 1,167.00 1,167.000.00$40.00$0.00
55CROSS GUTTER13.00CY 19.00 19.000.00$675.00$0.00
56CROSS GUTTER (MOD)2.00CY 1.00 1.000.00$670.00$0.00
57LONGITUDINAL GUTTER (MOD)1.00CY 0.00 0.000.00$670.00$0.00
58ALLEY INTERSECTION38.00CY 39.00 39.000.00$442.00$0.00
59METAL HAND RAILINGS PER STD PLAN 6065.00LF 5.00 5.000.00$545.00$0.00
60 40.00  40.00 40.000.00$37.00$0.00
61RED WOOD FENCE, 4' HIGH24.00LF 24.00 24.000.00$132.00$0.00
62FURNISH AND PLANT 15 GALLON TREE61.00EA 61.00 61.000.00$300.00$0.00
63DECOMPOSED GRANITE, 4" THICK852.00SF 790.00 790.000.00$6.00$0.00
64RIVER ROCK PAVING - GROUTED143.00SF 143.00 143.000.00$18.00$0.00
65SOD759.00SY 722.00 722.000.00$20.00$0.00
66RECONSTRUCT CATCH BASIN TOP W=5'1.00EA 1.00 1.000.00$640.00$0.00
67RECONSTRUCT LOCAL DEPRESSION PER STD PLAN 313-3 CASE E11.00EA 11.00 11.000.00$385.00$0.00
68STORMWATER BIORETENTION FILTRATION BASIN PER DETAIL A ON SHEET 2311.00EA 10.00 10.000.00$3,400.00$0.00
69SAND FILTRATION BASIN PER DETAIL C ON SHEET 233.00EA 4.00 4.000.00$7,300.00$0.00
70LID TREE WELL PER DETAIL D ON SHEET 241.00EA 1.00 1.000.00$4,600.00$0.00
71FILTRATION TRENCH PER DETAIL E ON SHEET 241.00EA 1.00 1.000.00$15,000.00$0.00
724" DIAMETER PVC PIPE, SCH 80674.00LF 674.00 674.000.00$45.00$0.00
73DETAIL 2 (THERMOPLASTIC)2,820.00LF 2,758.00 2,758.000.00$0.50$0.00
74DETAIL 22 (THERMOPLASTIC)1,380.00LF 1,329.00 1,329.000.00$0.94$0.00
75DETAIL 38 (THERMOPLASTIC)80.00LF 80.00 80.000.00$1.10$0.00
76PAVEMENT MARKINGS (THERMOPLASTIC)1,544.00SF 1,561.00 1,561.000.00$5.75$0.00
7712" STRIPING (THERMOPLASTIC)1,685.00LF 1,531.00 1,531.000.00$2.20$0.00
7824" STRIPING (THERMOPLASTIC)1,029.00LF 676.00 676.000.00$4.40$0.00
79INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT1,605.00LF 1,130.00 1,130.000.00$11.00$0.00
80INSTALL FIRE HYDRANT LOCATION RPM33.00EA 33.00 33.000.00$5.50$0.00
81REMOVE VEHICLE HEAD (COMPLETE)7.00EA 7.00 7.000.00$143.00$0.00
823-12" LED VEHICLE HEAD (COMPLETE) 7.00EA 7.00 7.000.00$1,650.00$0.00
S-1CALTRANS PERMIT FEE T&M 1,980.30 1,980.300.00$1.00$0.00
S-1ACALTRANS PERMIT FEE T&M 740.60 740.600.00$1.00$0.00
S-2SEPARATE FABRIC FROM RAP T&M 0.00 0.000.00$1.00$0.00
S-2ASEPERATE FABRIC FROM RAP LS 1.00 1.000.00$14,000.00$0.00
S-3STABILIZE PUMPING SUBGRADE T&M 0.00 0.000.00$1.00$0.00
S-3ASTABILIZE PUMPING SUBGRADE LS 1.00 1.000.00$66,000.00$0.00

DEDUCTION DETAIL

DescriptionUnitTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
OVERTIME INSPECTIONHOUR 0.00 0.000.00$100.00 $0.00
LIQUIDATED DAMAGESDAY 0.00 0.000.00$1,500.00 $0.00
LABOR COMPLIANCEVIOLATION 0.00 0.000.00$25.00 $0.00
AFFIRMATIVE ACTIONVIOLATION 0.00 0.000.00$200.00 $0.00
BEST MANAGEMENT PRACTICEVIOLATION 0.00 0.000.00$1,000.00 $0.00
SCHEDULE UPDATEMONTHLY 0.00 0.000.00$250.00 $0.00

FINANCIAL SUMMARY

  Total Previous Current
Earned $3,129,746.50 $3,129,746.50 $0.00
Retained $155,687.34 $155,687.34 $0.00
Deducted $0.00 $0.00 $0.00
Due $2,974,059.16 $2,974,059.16 $0.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.