Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MTH) | 6.00 | MTH |
6.00
| 6.00 | 0.00 | $500.00 | $0.00 |
3 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $1,000.00 | $0.00 |
4 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $15,000) | 1.00 | LS |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
1.00
| 1.00 | 0.00 | $10,000.00 | $0.00 |
6 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 1.00 | 0.00 | $30,000.00 | $0.00 |
7 | OFFICE FACILITIES | 1.00 | LS |
1.00
| 1.00 | 0.00 | $27,400.00 | $0.00 |
8 | MOBILIZATION | 1.00 | LS |
1.00
| 1.00 | 0.00 | $86,900.00 | $0.00 |
9 | CLEARING AND GRUBBING | 1.00 | LS |
1.00
| 1.00 | 0.00 | $20,000.00 | $0.00 |
10 | ROOT PRUNE TREE, FURNISH AND INSTALL ROOT CONTROL BARRIER | 14.00 | EA |
13.00
| 13.00 | 0.00 | $770.00 | $0.00 |
11 | STUMP REMOVAL ONLY (6"-12" DIAMETER) | 9.00 | EA |
7.00
| 7.00 | 0.00 | $215.00 | $0.00 |
12 | STUMP REMOVAL ONLY (13"-24" DIAMETER) | 28.00 | EA |
28.00
| 28.00 | 0.00 | $500.00 | $0.00 |
13 | STUMP REMOVAL ONLY (25"+ DIAMETER) | 12.00 | EA |
12.00
| 12.00 | 0.00 | $600.00 | $0.00 |
14 | REMOVE EXISTING CHAIN LINK FENCE | 74.00 | LF |
74.00
| 74.00 | 0.00 | $4.90 | $0.00 |
15 | REMOVE EXISTING WROUGHT IRON FENCE | 82.00 | LF |
76.00
| 76.00 | 0.00 | $6.75 | $0.00 |
16 | REMOVE EXISTING WOOD FENCE | 49.00 | LF |
29.00
| 29.00 | 0.00 | $6.40 | $0.00 |
17 | ADJUST SLIDING GATE AND TRACKS | 1.00 | EA |
1.00
| 1.00 | 0.00 | $6,300.00 | $0.00 |
18 | ADJUST WROUGHT IRON GATE | 1.00 | EA |
1.00
| 1.00 | 0.00 | $2,900.00 | $0.00 |
19 | CONCRETE REMOVAL (NON-REINFORCED) | 927.00 | CY |
927.00
| 927.00 | 0.00 | $145.00 | $0.00 |
20 | CONCRETE REMOVAL (REINFORCED) | 15.00 | CY |
8.00
| 8.00 | 0.00 | $260.00 | $0.00 |
21 | UNCLASSIFIED EXCAVATION | 4,281.00 | CY |
4,876.50
| 4,876.50 | 0.00 | $60.00 | $0.00 |
22 | CRUSHED MISCELLANEOUS BASE | 65.00 | CY |
60.00
| 60.00 | 0.00 | $63.00 | $0.00 |
23 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 30.00 | CY |
25.00
| 25.00 | 0.00 | $150.00 | $0.00 |
24 | CEMENT STABILIZED PULVERIZED BASE, 8" THICK | 51,709.00 | SY |
51,702.00
| 51,702.00 | 0.00 | $4.50 | $0.00 |
25 | PORTLAND CEMENT FOR CSPB | 1,013.00 | TON |
951.39
| 951.39 | 0.00 | $139.00 | $0.00 |
26 | PRIME/TACK COAT FOR CSPB | 10,349.00 | GAL |
8,317.00
| 8,317.00 | 0.00 | $6.15 | $0.00 |
27 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") | 409,578.00 | SF |
409,578.00
| 409,578.00 | 0.00 | $0.19 | $0.00 |
28 | COLD MILL AC PAVEMENT (> 3") | 193,575.00 | SF |
193,575.00
| 193,575.00 | 0.00 | $0.23 | $0.00 |
29 | AC PAVEMENT(PATCH BACK) | 41.00 | TON |
41.00
| 41.00 | 0.00 | $230.00 | $0.00 |
30 | AC PAVEMENT(LEVELING COURSE) | 621.00 | TON |
621.00
| 621.00 | 0.00 | $79.00 | $0.00 |
31 | RECONSTRUCT MANHOLE | 76.00 | EA |
71.00
| 71.00 | 0.00 | $1,500.00 | $0.00 |
32 | ADJUST MANHOLE | 2.00 | EA |
2.00
| 2.00 | 0.00 | $385.00 | $0.00 |
33 | DOUBLE ADJUST MANHOLE | 6.00 | EA |
6.00
| 6.00 | 0.00 | $770.00 | $0.00 |
34 | ASPHALT RUBBER HOT MIX | 5,154.00 | TON |
5,091.82
| 5,091.82 | 0.00 | $77.00 | $0.00 |
35 | ASPHALT RUBBER HOT MIX (TEST STRIP) | 500.00 | TON |
498.76
| 498.76 | 0.00 | $100.00 | $0.00 |
36 | ASPHALT RUBBER AND AGGREGATE MEMBRANE | 15,544.00 | SY |
15,544.00
| 15,544.00 | 0.00 | $6.20 | $0.00 |
37 | EMULSIFIED RECYCLING AGENT | 266.00 | TON |
254.00
| 254.00 | 0.00 | $455.00 | $0.00 |
38 | COLD CENTRAL PLANT RECYCLED ASPHALT CONCRETE PAVEMENT (CCPRACP), 3" THICK | 51,726.00 | SY |
51,702.00
| 51,702.00 | 0.00 | $5.90 | $0.00 |
39 | PIPE CONNECTION PER STD PLAN 335, CASE 1 | 9.00 | EA |
9.00
| 9.00 | 0.00 | $560.00 | $0.00 |
40 | CURB DRAIN PER STD PLAN 150, N=1, CASE 3 INLET | 6.00 | EA |
6.00
| 6.00 | 0.00 | $222.00 | $0.00 |
41 | CURB DRAIN PER STD PLAN 150, N=2, CASE 3 INLET | 3.00 | EA |
3.00
| 3.00 | 0.00 | $222.00 | $0.00 |
42 | REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 3 | 8.00 | SF |
8.00
| 8.00 | 0.00 | $300.00 | $0.00 |
43 | PCC FOOTING FOR REINFORCED CONCRETE BLOCK WALL PER STD PLAN 601, TYPE 3 | 1.00 | CY |
1.00
| 1.00 | 0.00 | $5,700.00 | $0.00 |
44 | CONCRETE BLOCK SLOUGH WALL PER STD PLAN 622 | 36.00 | SF |
36.00
| 36.00 | 0.00 | $290.00 | $0.00 |
45 | PCC FOOTING FOR CONCRETE BLOCK SLOUGH WALL PER STD PLAN 622 | 1.00 | CY |
1.00
| 1.00 | 0.00 | $5,700.00 | $0.00 |
46 | CONCRETE SLOUGH WALL PER STD PLAN 6203, CASE I | 4.00 | CY |
4.00
| 4.00 | 0.00 | $2,700.00 | $0.00 |
47 | PCC CURB, TYPE A1-6 | 98.00 | LF |
98.00
| 98.00 | 0.00 | $21.50 | $0.00 |
48 | PCC CURB, TYPE A1-VAR | 11.00 | LF |
11.00
| 11.00 | 0.00 | $25.00 | $0.00 |
49 | PCC CURB & GUTTER, TYPE A2-6 | 4,191.00 | LF |
3,981.00
| 3,981.00 | 0.00 | $26.00 | $0.00 |
50 | PCC CURB & GUTTER, TYPE A2-8 | 696.00 | LF |
696.00
| 696.00 | 0.00 | $25.00 | $0.00 |
51 | PCC CURB & GUTTER, TYPE A2-VAR | 83.00 | LF |
58.00
| 58.00 | 0.00 | $27.00 | $0.00 |
52 | PCC CURB & GUTTER, TYPE A3-8 | 596.00 | LF |
596.00
| 596.00 | 0.00 | $27.80 | $0.00 |
53 | PCC WALK, DRIVES & CURB RAMPS, 4" THICK | 42,145.00 | SF |
39,981.00
| 39,981.00 | 0.00 | $5.90 | $0.00 |
54 | DETECTABLE WARNING SURFACE | 1,200.00 | SF |
1,167.00
| 1,167.00 | 0.00 | $40.00 | $0.00 |
55 | CROSS GUTTER | 13.00 | CY |
19.00
| 19.00 | 0.00 | $675.00 | $0.00 |
56 | CROSS GUTTER (MOD) | 2.00 | CY |
1.00
| 1.00 | 0.00 | $670.00 | $0.00 |
57 | LONGITUDINAL GUTTER (MOD) | 1.00 | CY |
0.00
| 0.00 | 0.00 | $670.00 | $0.00 |
58 | ALLEY INTERSECTION | 38.00 | CY |
39.00
| 39.00 | 0.00 | $442.00 | $0.00 |
59 | METAL HAND RAILINGS PER STD PLAN 606 | 5.00 | LF |
5.00
| 5.00 | 0.00 | $545.00 | $0.00 |
60 | | 40.00 | |
40.00
| 40.00 | 0.00 | $37.00 | $0.00 |
61 | RED WOOD FENCE, 4' HIGH | 24.00 | LF |
24.00
| 24.00 | 0.00 | $132.00 | $0.00 |
62 | FURNISH AND PLANT 15 GALLON TREE | 61.00 | EA |
61.00
| 61.00 | 0.00 | $300.00 | $0.00 |
63 | DECOMPOSED GRANITE, 4" THICK | 852.00 | SF |
790.00
| 790.00 | 0.00 | $6.00 | $0.00 |
64 | RIVER ROCK PAVING - GROUTED | 143.00 | SF |
143.00
| 143.00 | 0.00 | $18.00 | $0.00 |
65 | SOD | 759.00 | SY |
722.00
| 722.00 | 0.00 | $20.00 | $0.00 |
66 | RECONSTRUCT CATCH BASIN TOP W=5' | 1.00 | EA |
1.00
| 1.00 | 0.00 | $640.00 | $0.00 |
67 | RECONSTRUCT LOCAL DEPRESSION PER STD PLAN 313-3 CASE E | 11.00 | EA |
11.00
| 11.00 | 0.00 | $385.00 | $0.00 |
68 | STORMWATER BIORETENTION FILTRATION BASIN PER DETAIL A ON SHEET 23 | 11.00 | EA |
10.00
| 10.00 | 0.00 | $3,400.00 | $0.00 |
69 | SAND FILTRATION BASIN PER DETAIL C ON SHEET 23 | 3.00 | EA |
4.00
| 4.00 | 0.00 | $7,300.00 | $0.00 |
70 | LID TREE WELL PER DETAIL D ON SHEET 24 | 1.00 | EA |
1.00
| 1.00 | 0.00 | $4,600.00 | $0.00 |
71 | FILTRATION TRENCH PER DETAIL E ON SHEET 24 | 1.00 | EA |
1.00
| 1.00 | 0.00 | $15,000.00 | $0.00 |
72 | 4" DIAMETER PVC PIPE, SCH 80 | 674.00 | LF |
674.00
| 674.00 | 0.00 | $45.00 | $0.00 |
73 | DETAIL 2 (THERMOPLASTIC) | 2,820.00 | LF |
2,758.00
| 2,758.00 | 0.00 | $0.50 | $0.00 |
74 | DETAIL 22 (THERMOPLASTIC) | 1,380.00 | LF |
1,329.00
| 1,329.00 | 0.00 | $0.94 | $0.00 |
75 | DETAIL 38 (THERMOPLASTIC) | 80.00 | LF |
80.00
| 80.00 | 0.00 | $1.10 | $0.00 |
76 | PAVEMENT MARKINGS (THERMOPLASTIC) | 1,544.00 | SF |
1,561.00
| 1,561.00 | 0.00 | $5.75 | $0.00 |
77 | 12" STRIPING (THERMOPLASTIC) | 1,685.00 | LF |
1,531.00
| 1,531.00 | 0.00 | $2.20 | $0.00 |
78 | 24" STRIPING (THERMOPLASTIC) | 1,029.00 | LF |
676.00
| 676.00 | 0.00 | $4.40 | $0.00 |
79 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT | 1,605.00 | LF |
1,130.00
| 1,130.00 | 0.00 | $11.00 | $0.00 |
80 | INSTALL FIRE HYDRANT LOCATION RPM | 33.00 | EA |
33.00
| 33.00 | 0.00 | $5.50 | $0.00 |
81 | REMOVE VEHICLE HEAD (COMPLETE) | 7.00 | EA |
7.00
| 7.00 | 0.00 | $143.00 | $0.00 |
82 | 3-12" LED VEHICLE HEAD (COMPLETE) | 7.00 | EA |
7.00
| 7.00 | 0.00 | $1,650.00 | $0.00 |
S-1 | CALTRANS PERMIT FEE | | T&M |
1,980.30
| 1,980.30 | 0.00 | $1.00 | $0.00 |
S-1A | CALTRANS PERMIT FEE | | T&M |
740.60
| 740.60 | 0.00 | $1.00 | $0.00 |
S-2 | SEPARATE FABRIC FROM RAP | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
S-2A | SEPERATE FABRIC FROM RAP | | LS |
1.00
| 1.00 | 0.00 | $14,000.00 | $0.00 |
S-3 | STABILIZE PUMPING SUBGRADE | | T&M |
0.00
| 0.00 | 0.00 | $1.00 | $0.00 |
S-3A | STABILIZE PUMPING SUBGRADE | | LS |
1.00
| 1.00 | 0.00 | $66,000.00 | $0.00 |