Project Management Division III
As-Built 3
Project Name: Pathfinder Road
Contractor: Sequel Contractors, Inc.
13546 Imperial Highway
Santa Fe Springs, CA 90670
Project ID: RDC0015891
Federal Number(s): None
Original Contract: $372,069.75
Awarded: 2/2/2016
Period Ending: 8/11/2016
Board Accepted: 8/24/2016
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1IMPLEMENTATION OF BMPS1.00LS 1.00 1.000.00$3,000.00$0.00
2TRAFFIC CONTROL1.00LS 1.00 1.000.00$30,000.00$0.00
3FLASHING ARROW SIGN1.00EA 1.00 1.000.00$800.00$0.00
4CHANGEABLE MESSAGE SIGN3.00EA 3.00 3.000.00$1,000.00$0.00
5CLEARING AND GRUBBING1.00LS 1.00 1.000.00$5,200.00$0.00
6CONCRETE REMOVAL (NON-REINFORCED)93.00CY 97.74 97.740.00$130.00$0.00
7UNCLASSIFIED EXCAVATION302.00CY 278.02 278.020.00$100.00$0.00
8CRUSHED MISCELLANEOUS BASE174.00CY 158.10 158.100.00$100.00$0.00
9CEMENT STABILIZED PULVERIZED BASE, 18" THICK3,350.00SY 3,031.11 3,031.110.00$9.00$0.00
10PORTLAND CEMENT FOR CSPB142.00TON 138.51 138.510.00$110.00$0.00
11PRIME/TACK COAT FOR CSPB503.00GAL 600.00 600.000.00$6.00$0.00
12COLD MILL AC PAVEMENT (> 1-1/2 - 3")45,600.00SF 46,800.00 46,800.000.00$0.30$0.00
13COLD MILL AC PAVEMENT (> 3")27,000.00SF 27,000.00 27,000.000.00$1.00$0.00
14AC PAVEMENT668.00TON 654.82 654.820.00$66.00$0.00
15RECONSTRUCT MANHOLE1.00EA 0.00 0.000.00$2,000.00$0.00
16DOUBLE ADJUST MANHOLE1.00EA 2.00 2.000.00$1,000.00$0.00
17ASPHALT RUBBER HOT MIX897.00TON 1,007.70 1,007.700.00$83.00$0.00
18PIPE CONNECTION PER STD PLAN 335, CASE 31.00EA 1.00 1.000.00$1,000.00$0.00
19PCC CURB & GUTTER, TYPE A2-8450.00LF 450.00 450.000.00$20.00$0.00
20PCC WALK, 4" THICK4,833.00SF 5,968.00 5,968.000.00$4.00$0.00
21PCC DRIVEWAYS, 6" THICK180.00SF 180.00 180.000.00$4.50$0.00
224" PERFORATED PVC PIPE10.00LF 10.00 10.000.00$75.00$0.00
23INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT475.00LF 457.00 457.000.00$8.00$0.00
24REMOVE VEHICLE HEAD (COMPLETE)2.00EA 2.00 2.000.00$300.00$0.00
253-12" LED VEHICLE HEAD (COMPLETE) 1.00EA 1.00 1.000.00$1,500.00$0.00
264-12" LED VEHICLE HEAD (COMPLETE)1.00EA 1.00 1.000.00$2,000.00$0.00
27DETAIL 9 (THERMOPLASTIC)2,180.00LF 2,085.00 2,085.000.00$0.40$0.00
28DETAIL 22 (THERMOPLASTIC)600.00LF 600.00 600.000.00$1.00$0.00
29DETAIL 29 (THERMOPLASTIC)475.00LF 630.00 630.000.00$2.00$0.00
30DETAIL 32 (THERMOPLASTIC)85.00LF 97.00 97.000.00$2.00$0.00
31DETAIL 38 (THERMOPLASTIC)720.00LF 720.00 720.000.00$1.00$0.00
32DETAIL 39 (THERMOPLASTIC)1,405.00LF 1,742.00 1,742.000.00$0.75$0.00
33DETAIL 39A (THERMOPLASTIC)400.00LF 400.00 400.000.00$0.50$0.00
34PAVEMENT MARKINGS (THERMOPLASTIC)276.00SF 318.00 318.000.00$5.00$0.00
3512" STRIPING (THERMOPLASTIC)195.00LF 175.00 175.000.00$3.00$0.00
36CHANNELIZER (ANCHORED), CALTRANS STD PLAN A73C200.00EA 150.00 150.000.00$15.00$0.00
37STORM WATER BIORETENTION FILTRATION BASIN1.00EA 1.00 1.000.00$10,000.00$0.00
38INSTALL SIGNS ON BARRICADES/POSTS35.00EA 35.00 35.000.00$30.00$0.00
S-1EXTEND MOVE-IN PERIOD LS 0.00 0.000.00$0.00$0.00
S-2ADDITIONAL DEMOB & REMOB COST LS 1.00 1.000.00$2,000.00$0.00

DEDUCTION DETAIL

DescriptionUnitTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
OVERTIME INSPECTIONHOUR 0.00 0.000.00$100.00 $0.00
LIQUIDATED DAMAGESDAY 0.00 0.000.00$500.00 $0.00
LABOR COMPLIANCEVIOLATION 0.00 0.000.00$25.00 $0.00
AFFIRMATIVE ACTIONVIOLATION 0.00 0.000.00$200.00 $0.00
BEST MANAGEMENT PRACTICEVIOLATION 0.00 0.000.00$1,000.00 $0.00
SCHEDULE UPDATEMONTHLY 0.00 0.000.00$250.00 $0.00

FINANCIAL SUMMARY

  Total Previous Current
Earned $380,049.01 $380,049.01 $0.00
Retained $19,002.45 $19,002.45 $0.00
Deducted $0.00 $0.00 $0.00
Due $361,046.56 $361,046.56 $0.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.