Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 3.00 | MTH |
2.00
| 1.00 | 1.00 | $500.00 | $500.00 |
4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.60
| 0.30 | 0.30 | $6,000.00 | $1,800.00 |
5 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.60
| 0.30 | 0.30 | $19,000.00 | $5,700.00 |
6 | OFFICE FACILITIES | 4.00 | MTH |
2.00
| 1.00 | 1.00 | $3,600.00 | $3,600.00 |
7 | MOBILIZATION | 1.00 | LS |
0.60
| 0.30 | 0.30 | $178,000.00 | $53,400.00 |
11 | TREE REMOVAL (13"-24" DIAMETER) | 5.00 | EA |
12.00
| 5.00 | 7.00 | $950.00 | $6,650.00 |
14 | CROWN REDUCTION, TREE (25" + DIAMETER) | 3.00 | EA |
1.00
| 0.00 | 1.00 | $530.00 | $530.00 |
15 | CONCRETE REMOVAL (NON-REINFORCED) | 332.00 | CY |
358.40
| 132.43 | 225.97 | $320.00 | $72,310.40 |
16 | UNCLASSIFIED EXCAVATION | 779.00 | CY |
656.15
| 190.27 | 465.88 | $200.00 | $93,176.00 |
17 | CRUSHED MISCELLANEOUS BASE | 587.00 | CY |
504.15
| 190.27 | 313.88 | $210.00 | $65,914.80 |
18 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) | 4.00 | CY |
4.00
| 0.00 | 4.00 | $400.00 | $1,600.00 |
20 | AC PAVEMENT | 105.00 | TON |
30.00
| 0.00 | 30.00 | $300.00 | $9,000.00 |
21 | AC PAVEMENT(PATCH BACK) | 7.00 | TON |
7.00
| 1.00 | 6.00 | $300.00 | $1,800.00 |
22 | RECONSTRUCT MANHOLE | 2.00 | EA |
1.00
| 0.00 | 1.00 | $4,000.00 | $4,000.00 |
25 | REMOVE AND RECONSTRUCT EXISTING CURB DRAIN PER STD PLAN 150, N=1 | 16.00 | EA |
9.00
| 8.00 | 1.00 | $500.00 | $500.00 |
26 | PCC CURB, TYPE A1-VAR | 440.00 | LF |
440.00
| 21.00 | 419.00 | $49.00 | $20,531.00 |
27 | PCC CURB & GUTTER, TYPE A2-8 | 68.00 | LF |
68.00
| 0.00 | 68.00 | $65.00 | $4,420.00 |
28 | PCC CURB & GUTTER, TYPE A2-VAR | 487.00 | LF |
643.00
| 264.50 | 378.50 | $65.00 | $24,602.50 |
29 | PCC CURB & GUTTER, TYPE A2-VAR, W=4' | 36.00 | LF |
36.00
| 0.00 | 36.00 | $65.00 | $2,340.00 |
30 | PCC CURB & GUTTER, TYPE A2-VAR, W=VAR | 86.00 | LF |
86.00
| 0.00 | 86.00 | $65.00 | $5,590.00 |
31 | PCC WALK & DRIVEWAYS, 4" THICK | 12,041.00 | SF |
13,319.00
| 9,214.00 | 4,105.00 | $13.00 | $53,365.00 |
32 | PCC CURB RAMPS | 106.00 | CY |
106.00
| 0.00 | 106.00 | $1,500.00 | $159,000.00 |
33 | DETECTABLE WARNING SURFACE | 631.00 | SF |
631.00
| 0.00 | 631.00 | $49.00 | $30,919.00 |
34 | CROSS GUTTER | 46.00 | CY |
46.00
| 0.00 | 46.00 | $1,100.00 | $50,600.00 |
37 | TRAFFIC CONTROL | 1.00 | LS |
0.60
| 0.30 | 0.30 | $129,000.00 | $38,700.00 |
|