Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 24.00 | MTH |
6.00
| 5.00 | 1.00 | $500.00 | $500.00 |
6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.30
| 0.25 | 0.05 | $16,000.00 | $800.00 |
7 | OFFICE FACILITIES | 24.00 | MTH |
6.00
| 5.00 | 1.00 | $500.00 | $500.00 |
9 | CLEARING AND GRUBBING | 1.00 | LS |
0.30
| 0.25 | 0.05 | $30,000.00 | $1,500.00 |
12 | STUMP REMOVAL ONLY (13"-24" DIAMETER) | 55.00 | EA |
16.00
| 6.00 | 10.00 | $375.00 | $3,750.00 |
13 | STUMP REMOVAL ONLY (25"+ DIAMETER) | 29.00 | EA |
23.00
| 12.00 | 11.00 | $500.00 | $5,500.00 |
14 | CONCRETE REMOVAL (NON-REINFORCED) | 3,119.00 | CY |
974.38
| 662.61 | 311.77 | $156.00 | $48,636.12 |
16 | UNCLASSIFIED EXCAVATION | 3,316.00 | CY |
1,870.87
| 1,414.85 | 456.02 | $138.00 | $62,930.76 |
18 | CRUSHED MISCELLANEOUS BASE | 4,205.00 | CY |
2,537.49
| 2,029.77 | 507.72 | $105.00 | $53,310.60 |
42 | PCC CURB & GUTTER, TYPE A2-6 | 9,226.00 | LF |
6,451.00
| 3,403.50 | 3,047.50 | $33.00 | $100,567.50 |
43 | PCC CURB & GUTTER, TYPE A2-8 | 16,059.00 | LF |
3,658.00
| 2,624.00 | 1,034.00 | $37.00 | $38,258.00 |
48 | PCC WALK & DRIVEWAYS, 4" THICK | 64,556.00 | SF |
36,383.00
| 24,229.43 | 12,153.57 | $6.35 | $77,175.17 |
49 | PCC CURB RAMPS | 252.00 | CY |
81.81
| 39.89 | 41.92 | $675.00 | $28,296.00 |
50 | PCC WALK & DRIVEWAYS, 6" THICK | 315.00 | SF |
132.00
| 0.00 | 132.00 | $9.50 | $1,254.00 |
51 | DETECTABLE WARNING SURFACE | 2,277.00 | SF |
660.00
| 432.00 | 228.00 | $43.00 | $9,804.00 |
52 | CROSS GUTTER | 475.00 | CY |
121.59
| 97.99 | 23.60 | $370.00 | $8,732.00 |
54 | ALLEY INTERSECTION | 142.00 | CY |
93.15
| 72.24 | 20.91 | $370.00 | $7,736.70 |
59 | TRAFFIC CONTROL | 1.00 | LS |
0.30
| 0.25 | 0.05 | $370,000.00 | $18,500.00 |
|