Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 24.00 | MTH |
15.00
| 14.00 | 1.00 | $500.00 | $500.00 |
4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.75
| 0.70 | 0.05 | $40,000.00 | $2,000.00 |
6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.75
| 0.70 | 0.05 | $16,000.00 | $800.00 |
7 | OFFICE FACILITIES | 24.00 | MTH |
15.00
| 14.00 | 1.00 | $500.00 | $500.00 |
9 | CLEARING AND GRUBBING | 1.00 | LS |
0.75
| 0.70 | 0.05 | $30,000.00 | $1,500.00 |
10 | ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) | 92.00 | EA |
82.00
| 53.00 | 29.00 | $1,275.00 | $36,975.00 |
12 | STUMP REMOVAL ONLY (13"-24" DIAMETER) | 55.00 | EA |
55.00
| 38.00 | 17.00 | $375.00 | $6,375.00 |
13 | STUMP REMOVAL ONLY (25"+ DIAMETER) | 29.00 | EA |
29.00
| 26.00 | 3.00 | $500.00 | $1,500.00 |
14 | CONCRETE REMOVAL (NON-REINFORCED) | 3,119.00 | CY |
2,655.24
| 2,363.34 | 291.90 | $156.00 | $45,536.40 |
16 | UNCLASSIFIED EXCAVATION | 3,316.00 | CY |
4,988.82
| 4,492.12 | 496.70 | $138.00 | $68,544.60 |
18 | CRUSHED MISCELLANEOUS BASE | 4,205.00 | CY |
5,014.44
| 4,658.01 | 356.43 | $105.00 | $37,425.15 |
27 | AC PAVEMENT (PATCH BACK) TEMP | 386.00 | TON |
363.65
| 314.45 | 49.20 | $315.00 | $15,498.00 |
29 | RECONSTRUCT MANHOLE | 155.00 | EA |
31.00
| 8.00 | 23.00 | $1,800.00 | $41,400.00 |
43 | PCC CURB & GUTTER, TYPE A2-8 | 16,059.00 | LF |
21,030.50
| 17,855.50 | 3,175.00 | $37.00 | $117,475.00 |
48 | PCC WALK & DRIVEWAYS, 4" THICK | 64,556.00 | SF |
91,335.50
| 83,828.93 | 7,506.57 | $6.35 | $47,666.72 |
49 | PCC CURB RAMPS | 252.00 | CY |
252.00
| 198.85 | 53.15 | $675.00 | $35,876.25 |
50 | PCC WALK & DRIVEWAYS, 6" THICK | 315.00 | SF |
1,295.50
| 639.50 | 656.00 | $9.50 | $6,232.00 |
51 | DETECTABLE WARNING SURFACE | 2,277.00 | SF |
1,782.00
| 1,632.00 | 150.00 | $43.00 | $6,450.00 |
52 | CROSS GUTTER | 475.00 | CY |
445.11
| 395.50 | 49.61 | $370.00 | $18,355.70 |
|