Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) | 24.00 | MTH |
16.00
| 15.00 | 1.00 | $500.00 | $500.00 |
4 | IMPLEMENTATION OF THE LTWHP | 1.00 | LS |
0.80
| 0.75 | 0.05 | $40,000.00 | $2,000.00 |
6 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.80
| 0.75 | 0.05 | $16,000.00 | $800.00 |
7 | OFFICE FACILITIES | 24.00 | MTH |
16.00
| 15.00 | 1.00 | $500.00 | $500.00 |
9 | CLEARING AND GRUBBING | 1.00 | LS |
0.80
| 0.75 | 0.05 | $30,000.00 | $1,500.00 |
14 | CONCRETE REMOVAL (NON-REINFORCED) | 3,119.00 | CY |
2,691.04
| 2,655.24 | 35.80 | $156.00 | $5,584.80 |
16 | UNCLASSIFIED EXCAVATION | 3,316.00 | CY |
5,010.92
| 4,988.82 | 22.10 | $138.00 | $3,049.80 |
17 | UNCLASSIFIED EXCAVATION (ROADWAY) | 28,831.00 | CY |
19,297.00
| 12,513.00 | 6,784.00 | $72.00 | $488,448.00 |
18 | CRUSHED MISCELLANEOUS BASE | 4,205.00 | CY |
5,036.54
| 5,014.44 | 22.10 | $105.00 | $2,320.50 |
20 | CEMENT STABILIZED PULVERIZED BASE, 8" THICK | 88,314.00 | SY |
51,249.00
| 25,372.00 | 25,877.00 | $4.90 | $126,797.30 |
21 | CEMENT STABILIZED PULVERIZED BASE, 12" THICK | 71,639.00 | SY |
59,699.00
| 44,288.00 | 15,411.00 | $5.10 | $78,596.10 |
22 | PORTLAND CEMENT FOR CSPB | 4,598.00 | TON |
2,364.32
| 1,624.12 | 740.20 | $152.00 | $112,510.40 |
23 | PRIME/TACK COAT FOR CSPB | 32,009.00 | GAL |
17,210.00
| 10,838.00 | 6,372.00 | $0.45 | $2,867.40 |
25 | AC PAVEMENT | 22,669.00 | TON |
15,292.59
| 9,853.69 | 5,438.90 | $70.00 | $380,723.00 |
27 | AC PAVEMENT (PATCH BACK) TEMP | 386.00 | TON |
386.00
| 363.65 | 22.35 | $315.00 | $7,040.25 |
29 | RECONSTRUCT MANHOLE | 155.00 | EA |
39.00
| 31.00 | 8.00 | $1,800.00 | $14,400.00 |
43 | PCC CURB & GUTTER, TYPE A2-8 | 16,059.00 | LF |
21,097.50
| 21,030.50 | 67.00 | $37.00 | $2,479.00 |
48 | PCC WALK & DRIVEWAYS, 4" THICK | 64,556.00 | SF |
91,475.50
| 91,335.50 | 140.00 | $6.35 | $889.00 |
49 | PCC CURB RAMPS | 252.00 | CY |
229.55
| 252.00 | -22.45 | $675.00 | ($15,153.75) |
51 | DETECTABLE WARNING SURFACE | 2,277.00 | SF |
1,827.00
| 1,782.00 | 45.00 | $43.00 | $1,935.00 |
59 | TRAFFIC CONTROL | 1.00 | LS |
0.80
| 0.70 | 0.10 | $370,000.00 | $37,000.00 |
|