Los Angeles County Public Works
Project Management Division III
As-Built 13
Project Name: South Whittier Sunshine Acres - Leland Avenue, et al.
Contractor: R. J. Noble Company
P.O. Box 620
Orange, CA 92856
Project ID: RMD4408002
Federal Number(s): None
Original Contract: $6,682,268.86
Awarded: 5/12/2022
Period Ending: 2/1/2024
Item No.DescriptionBid QtyUnitsTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
1CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
2CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH)6.00MTH 9.00 9.000.00$500.00$0.00
3CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000)1.00LS 1.00 1.000.00$1,000.00$0.00
4IMPLEMENTATION OF THE LTWHP1.00LS 1.00 1.000.00$15,000.00$0.00
5PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500)1.00LS 1.00 1.000.00$2,500.00$0.00
6IMPLEMENTATION OF THE SWPPP1.00LS 1.00 1.000.00$35,000.00$0.00
7OFFICE FACILITIES7.00MTH 10.00 10.000.00$5,000.00$0.00
8MOBILIZATION1.00LS 1.00 1.000.00$600,000.00$0.00
9CLEARING AND GRUBBING1.00LS 1.00 1.000.00$150,000.00$0.00
10ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER)14.00EA 5.00 5.000.00$1,000.00$0.00
11TREE REMOVAL (6"-12" DIAMETER)1.00EA 1.00 1.000.00$1,300.00$0.00
12CONCRETE REMOVAL (NON-REINFORCED)919.00CY 974.64 974.640.00$195.00$0.00
13UNCLASSIFIED EXCAVATION2,587.00CY 2,018.40 2,018.400.00$195.00$0.00
14UNCLASSIFIED EXCAVATION (ROADWAY)5,774.00CY 5,774.00 5,774.000.00$48.00$0.00
15CRUSHED MISCELLANEOUS BASE2,077.00CY 1,435.80 1,435.800.00$84.00$0.00
16CEMENT STABILIZED PULVERIZED BASE, 8" THICK65,327.00SY 64,324.00 64,324.000.00$9.50$0.00
17PORTLAND CEMENT FOR CSPB1,538.00TON 1,506.80 1,506.800.00$210.00$0.00
18COLD MILL AC PAVEMENT (0 - 1-1/2")438,548.00SF 407,779.00 407,779.000.00$0.23$0.00
19COLD MILL AC PAVEMENT (> 1-1/2 - 3")578,642.00SF 578,515.00 578,515.000.00$0.21$0.00
20AC PAVEMENT338.00TON 410.36 410.360.00$172.00$0.00
21AC PAVEMENT(PATCH BACK)370.00TON 370.00 370.000.00$220.00$0.00
22AC PAVEMENT(DIGOUTS)92.00TON 235.00 235.000.00$155.00$0.00
23RECONSTRUCT MANHOLE68.00EA 61.00 61.000.00$2,500.00$0.00
24DOUBLE ADJUST MANHOLE49.00EA 49.00 49.000.00$1,800.00$0.00
25ASPHALT RUBBER HOT MIX9,173.00TON 9,275.20 9,275.200.00$115.00$0.00
26ASPHALT RUBBER HOT MIX (TEST STRIP)500.00TON 500.00 500.000.00$134.00$0.00
27CCPRACP MIX DESIGN, SAMPLING, AND TESTING (STIPULATED UNIT PRICE OF $10000)1.00LS 1.00 1.000.00$10,000.00$0.00
28CCPR AC PAVEMENT, 3" THICK65,327.00SY 63,982.00 63,982.000.00$13.50$0.00
29EMULSIFIED RECYCLING AGENT345.00TON 266.22 266.220.00$950.00$0.00
30IMPORTED RECLAIMED ASPHALT PAVEMENT (RAP)3,207.00TON 2,421.00 2,421.000.00$40.00$0.00
31PCC CURB, TYPE A1-8302.00LF 302.00 302.000.00$37.00$0.00
32PCC CURB, TYPE A1-VAR35.00LF 20.00 20.000.00$37.00$0.00
33PCC CURB & GUTTER, TYPE A2-82,794.00LF 3,591.00 3,591.000.00$45.00$0.00
34PCC WALK & DRIVEWAYS, 4" THICK17,616.00SF 17,896.50 17,896.500.00$6.75$0.00
35PCC CURB RAMPS143.00CY 151.20 151.200.00$775.00$0.00
36DETECTABLE WARNING SURFACE627.00SF 627.00 627.000.00$42.00$0.00
37CROSS GUTTER458.00CY 458.00 458.000.00$400.00$0.00
38INSTALL FIRE HYDRANT LOCATION RPM47.00EA 47.00 47.000.00$30.00$0.00
39TRAFFIC CONTROL1.00LS 1.00 1.000.00$42,000.00$0.00
40CHANGEABLE MESSAGE SIGN2.00EA 2.00 2.000.00$9,500.00$0.00
S-1MODIFY MOVE-IN PERIOD NWD 80.00 80.000.00$0.00$0.00
S-2NON WORKING DAYS NWD 9.00 9.000.00$0.00$0.00
S-3REMOVAL OF 9 TREES WITH STUMPS LS 1.00 1.000.00$21,692.82$0.00
S-4ATREE AND STUMP REMOVAL  LS 1.00 1.000.00$7,236.00$0.00

DEDUCTION DETAIL

DescriptionUnitTotal Qty.Previous Qty.Current Qty.Unit PriceCurrent Amount
OVERTIME INSPECTIONHOUR 0.00 0.000.00$100.00 $0.00
LIQUIDATED DAMAGESDAY 0.00 0.000.00$2,000.00 $0.00
LABOR COMPLIANCEVIOLATION 0.00 0.000.00$250.00 $0.00
AFFIRMATIVE ACTIONVIOLATION 0.00 0.000.00$200.00 $0.00
BEST MANAGEMENT PRACTICEVIOLATION 0.00 0.000.00$1,000.00 $0.00
SCHEDULE UPDATEMONTHLY 0.00 0.000.00$250.00 $0.00
LOCAL TARGATED WORKER HIRING PROGRAMSTIP 27,330.48 25,502.391,828.09$1.00 $1,828.09

FINANCIAL SUMMARY

  Total Previous Current
Earned $6,489,609.45 $6,489,609.45 $0.00
Retained* $322,652.39 $324,480.48 ($1,828.09)
Deducted $27,330.48 $25,502.39 $1,828.09
Due $6,139,626.58 $6,139,626.58 $0.00



*The term "As-Built" used by the Department of Public Works in combination with the Engineer's Monthly Estimate process indicates that the project has been field accepted and that the pay quantities and deductions as detailed above are FINAL. Unless a certified letter is received by this office within 14 calendar days disputing the amounts shown, an acceptance letter will be filed with the Board of Supervisors authorizing the release of retention.

During the initial processing of this Engineer's Monthly Estimate, the current earnings were found to be less than the combined total of the current retention and current deductions resulting in a "negative payment" condition. In order to resolve the condition, the total retention amount for this project has automatically been decreased by $1,828.09
*This project has an escrow account.