County of Los Angeles
Department of Public Works
Enriching Lives!
LACounty.gov
Home
|
Customers
|
Resources
|
About DPW
Search
Municipal Stormwater Permit
888CleanLA
LA County
Stormwater
Ordinance
State Water
SUSMP
Standard Urban Storm Water Mitigation (SUSMP) Plan
Review Sheet (PDF, 102KB)
NPDES
Model Programs
Municipal Stormwater Permit Monitoring Report
Municipal Stormwater Permit Summary Data
Municipal Stormwater Permit Unified Report
Treatment Feasibility Study
TMDLS
Santa Monica Bacterial Shoreline Monitoring Plan
Watershed Home
Mark Pestrella
Assistant Deputy Director/
Division Engineer
Terri Grant
Assistant Division Engineer
Hector J. Bordas
Assistant Division Engineer
Rossana D’Antonio
Assistant Division Engineer
For information call
(626) 458-4300
Figures
Figure 2-1
Sampling Sites for the 1998-99 Storm Sampling Season
Figure 2-2
Ballona Creek (S01) at Sawtelle Blvd., Los Angeles
Figure 2-3
Malibu Creek (S02) at Piuma Rd., Unincorporated L.A.
County
Figure 2-4
Los Angeles River (S10) at Wardlow Rd., Long Beach
Figure 2-5
San Gabriel River (S14) at San Gabriel Pkwy., Pico
Rivera
Figure 2-6
Coyote Creek (S13) at Spring St., Long Beach
Figure 2-7
Santa Monica Pier (S08) at Appian Way, Santa Monica
Figure 2-8
Sawpit Creek (S11) at Monrovia Cr., Monrovia
Figure 2-9
Project 620 (S18) at Glenwood Rd., Glendale
Figure 2-10
Dominguez Channel (S23) at 116th St., Unincorporated
L.A. County
Figure 2-11
Project 1202 (S24) at Wilmington Ave., Carson
Figure 2-12
Project 474 (S25) at Nordoff St., Los Angeles
Figure 2-13
Project 404 (S26) at La Cadena Ave., Arcadia
Figure 2-14
Project 156 (S27) at Concord St., Glendale
Figure 2-15
Critical Source Sampling Sites for 1998-99 Storm Season
Figure 4-1
Mass Emission Results from 1998-99 Storm Season
Figure 4-2
Mass Emission Results from 1994-99 Storm Seasons
Figure 4-3
Dose-response plots of sea urchin fertilization test
results for dry weather flow composites collected
October 23, 1998
Figure 4-4
Dose-response plots of sea urchin fertilization test
results for San Gabriel River wet weather flow composite
collected November 8, 1998
Figure 4-5
Dose-response plot of sea urchin fertilization test results
for San Gabriel River wet weather flow composite
collected January 26, 1999
Figure 4-6
Dose-response plot of sea urchin fertilization test results
for Los Angeles River wet weather flow composite
collected March 15, 1999
Figure 4-7
Dose-response plot of sea urchin fertilization test results
for Los Angeles River wet weather flow grab collected
March 20, 1999
Figure 4-8
Stormwater Bacteria Counts, Total Coliform
Figure 4-9
Stormwater Bacteria Counts, Fecal Coliform
Figure 4-10
Stormwater Bacteria Counts, Fecal Streptococcus
Figure 4-11
Stormwater Bacteria Counts, Fecal Enterococcus
Figure 4-12
Mass Emission Loadings, Total Suspended Solids
Figure 4-13
Total Mass Emission Loadings, Ballona Creek WMA
Figure 4-14
Total Mass Emission Loadings, Malibu Creek WMA
Figure 4-15
Total Mass Emission Loadings, Los Angeles River WMA
Figure 4-16
Total Mass Emission Loadings, Sawpit Creek WMA
Figure 4-17
Total Mass Emission Loadings, Coyote Creek WMA
Figure 4-18
Total Mass Emission Loadings, San Gabriel River WMA
Figure 4-19
SMBRP Basins WMA (Unmonitored Watershed Area)
Figure 4-20
Santa Clara River (Unmonitored Watershed Area)
Figure 4-21
Dominguez Channel/L.A. Harbor WMA (Unmonitored
Watershed Area)
Figure 4-22
Total Mass Emission Loadings, Total Suspended Solids
Figure 4-23
Total Mass Emission Loadings, Unmonitored SMBRP
Basins
Figure 4-24
Total Mass Emission Loadings, Santa Clara River
Figure 4-25
Total Mass Emission Loadings, Dominguez Channel/L.A.
Harbor WMA
Figure 4-26
Land Use Results from 1998-99 Storm Season
Figure 4-27
Land Use Results from 1994-99 Storm Seasons
Figure 4-28
Critical Sources Results from 1998-99 Storm Season
Figure 4-29
Critical Sources Results from 1997-99 Storm Seasons
Back to Table of Contents