2407GG-002.01B1 |
LA General - Air Compressor Replacement Project. |
$1,070,149.48 |
Replacement of four air compressors located in LA General Medical Center's East Central Plant. |
2407GG-004.01B1 |
OVMC SPECT Scan-Equipment Replacement |
$815,579.29 |
Provide labor, equipment, material for reading panels. |
2407GG-004.02S1 |
OVMC SPECT Scan-Equipment Replacement - |
$89,062.47 |
Unforeseen conditions at SPECT CT and floor below. |
2407GG-004.03S1 |
OVMC D- SPECT CT - Equipment Replacement and Remodeling |
$24,472.79 |
Provide physicists report for lead shielding. |
2407GG-005.01B2 |
HOR. Fire Sprinkler Repairs D.M. Project |
$3,171.36 |
HOR Building exterior landscaping removal and disposal. |
2407GG-006.01B4 |
Hollywood Wilshire Public Health Center - Deferred Maintenance Repairs Project. |
$577,053.15 |
Exterior scope including crack sealing, flashing, and building finish. |
2407GG-007.01S1 |
Los Angeles General Medical Center Linear Accelerators Equipment Replacement Project |
$140,376.72 |
Phase I unforeseen site conditions. |
2407GG-007.02S1 |
Los Angeles General Medical Center Linear Accelerators Equipment Replacement Project |
$24,630.85 |
Los Angeles General Medical Center Linear Accelerators Equipment Replacement Project - Phase I unforeseen condition |
2407GG-008.01S1 |
Los Angeles General Medical Center - RF Replacement Project |
$69,365.19 |
Supplemental work for scope change and unforeseen conditions. |
2407GG-008.02S1 |
Los Angeles General Medical Center - RF Replacement Project |
$13,782.08 |
Unforeseen conditions for the anchor bolt at the Imaging System. |
2407GG-010.01B1 |
HUCLA RP PSA Generator Yard Fencing. |
$48,305.42 |
Installation of chain-link fence with grounding around Parking Structure A Generator and Transformer Yard. |
2407GG-011.01B2 |
Public Defender Hall of Records 2nd Floor Refurbishment Project |
$2,804.93 |
Conduct a 30-day panel load reading. |