| 2515GG-001.01B1 |
Big Dalton Dam Operator House |
$121,389.03 |
Repair and improve Big Dalton Dam Operator's house. |
| 2515GG-001.02S3 |
Big Dalton Dam Operator House Improvements Supplemental |
$14,233.98 |
Descope roof repair and reglazing for master bath. Install new bathtub enclosure. |
| 2515GG-002.01B1 |
Field Facilities - Flagpoles Replacements. |
$63,676.07 |
Replacement of existing flagpoles at 5 field facilities sites. |
| 2515GG-003.01B1 |
HQ Parking Structure and Stairway Repairs. |
$110,606.16 |
Repairs for stairs, walkway and concrete slabs near the parking structure. Repair vertical crack and stairs at the conference rooms. |
| 2515GG-003.02S3 |
HQ Parking Structure and Stairway Repairs Supplemental |
$11,311.78 |
6 additional posts to receive detail 2 sheet S4 repairs. |
| 2515GG-004.01B1 |
Headquarters Duct Cleaning |
$80,513.06 |
Clean HVAC ducts throughout the building. |
| 2515GG-006.01B1 |
Design Division - North Side Remodel |
$119,722.54 |
Convert an existing conference room and part of a copy room into three offices total. |
| 2515GG-007.01B1 |
Big Dalton Relief Quarters Improvements |
$61,860.92 |
Repair and improve Big Dalton relief quarters. |
| 2515GG-018.01B1 |
HQ HVAC Condensate Pans |
$83,890.19 |
Refurbish HVAC Air Handler Condensate Pans at Public Works Headquarters. |
| 2515GG-018.02S3 |
HQ HVAC Condensate Pans. |
$13,834.66 |
Refurbish HVAC Air Handler Condensate Pans in S-5 and S-6 at Public Works HQ. |
| 2515GG-018.03S1 |
HQ HVAC Condensate Pans. |
$112,725.28 |
Patching holes underneath coils with new sheet metal and coating existing support metal tubes. |
| 2515GG-018.04S1 |
HQ HVAC Condensate Pans |
$20,564.41 |
Make pans flat and apply 5811 along structural tubes. |
| 2515GG-023.01B1 |
PW Headquarters - 3rd Floor LDD Counter Replacement. |
$18,373.44 |
Demolition of existing public counter and high density storage. Construction of a new documents counter. |
| 2515GG-024.01S3 |
Pomona Fairplex Parking Lot Improvements |
$16,166.80 |
Layout change of gates and addition of concrete island dividers. |
| 2515GG-025.01S1 |
Rio Hondo Spreading Grounds Restroom Upgrades Supplemental |
$4,147.23 |
Remodel Rio Hondo Spreading Grounds' gate house restroom. |
| 2515GG-026.01S1 |
2025 Headquarters Storm Drain Repairs |
$30,485.32 |
Repair storm drain pipe from Mezzanine to basement. |
| 2515GG-026.02S1 |
2025 Headquarters Storm Drain Repairs |
$57,077.01 |
Repair the 9 and 10 floor primary storm drain. |
| 2515GG-027.01B1 |
Canyon Country Yard - Chain Link Fence Replacement |
$7,001.70 |
Install additional gate behind trailers and extend existing gate to 22ft wide. |
| 2515GG-029.01B1 |
San Gabriel Dam - Power Lines Replacement. |
$70,058.31 |
Replace power lines and add 2 guy-wires to existing lines. |
| 2515GG-030.01B1 |
PW Headquarters - Breakroom Renovations. |
$120,735.13 |
Demo of existing flooring/casework and install new flooring/casework in multiple HQ breakrooms. |
| 2515GG-032.01B1 |
Santa Fe Spreading Grounds - Pole Replacement. |
$25,604.45 |
Remove and replace pole. |