| 2417GG-001.01B3 |
East Los Angeles Community Service Center Emergency Generator Project. |
$261,812.92 |
Procurement of the 100kw emergency generator. Lead time for generator is 45 weeks. |
| 2417GG-002.01B3 |
Willowbrook Senior Center Emergency Generator Project |
$93,011.45 |
Procurement of the 100kw emergency generator. Lead time for generator is 45 weeks. |
| 2417GG-003.01B4 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 3 Abatement and Demolition) |
$961,301.06 |
Demolition and abatement of approximately 11,600 s.f. of office space (Phase 3). |
| 2417GG-003.02S2 |
Public Defender - Foltz 19th Floor Phase 2 Refurbishment |
$4,380.06 |
Convert existing power outlets to junction boxes for modular workstations. |
| 2417GG-005.01B1 |
PD HOR 2nd Floor Refurbishment Project |
$1,579,946.62 |
Refurbish and remodel approximately 8,600 sf of vacant storage space into office space. |
| 2417GG-007.01B1 |
Hall of Records Parapet Repairs Study. |
$12,671.51 |
Furnish and install labor, materials, and equipment for the Hall of Records 15th Floor Parapet Repairs Project. |
| 2417GG-008.01S1 |
PDC DM2-NCCF Corroded Pipes Replacement-Unforeseen Site Conditions |
$59,932.32 |
Install a new pipeline with hydrant for flushing purpose for an unforeseen condition discovered near Building 1000. |
| 2417GG-008.02S1 |
PDC DM2-NCCF Corroded Pipes Replacement-Unforeseen Site Conditions |
$24,921.91 |
Provide 21 bollards for back-flow preventer and additional 41 sign plates for BFP system. |
| 2417GG-009.01S1 |
Los Angeles General Medical Center Linear Accelerators Equipment Replacement Project |
$12,865.39 |
Phase II unforeseen condition. |
| 2417GG-009.02S1 |
Los Angeles General Medical Center Linear Accelerators Equipment Replacement Project. |
$68,067.20 |
LAG MC Linear Accelerators Equipment Replacement Project - Phase II unforeseen condition and additional water proofing work. |
| 2417GG-009.03S1 |
Los Angeles General Medical Center Linear Accelerators Equipment Replacement Project |
$42,741.81 |
LAG MC Linear Accelerators Equipment Replacement Project - Phase II unforeseen condition and additional owner added work. |
| 2417GG-010.01B4 |
Central Public Health Center Deferred Maintenance Repairs Project |
$5,059.68 |
Provide and maintain temporary generator during transition to new emergency generator. |
| 2417GG-010.01S1 |
Central Public Health Center Deferred Maintenance Repairs Project |
$5,059.68 |
Provide and maintain temporary generator during transition to new emergency generator. |
| 2417GG-011.01S1 |
LA Gen Air Compressor Replacement Project |
$15,526.19 |
Install conduit to feed low voltage connections, reroute copper piping to allow for control valve connection and air compressor modifications to allow for control valve signals. |