| 2516GG-001.01B1 |
Los Angeles General Medical Center USP 800 Pharmacy Upgrade Project |
$1,448,965.01 |
Remodel the sterile compounding areas of the inpatient/outpatient pharmacy. |
| 2516GG-004.01B1 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 3). |
$3,375,821.35 |
Phase 3 renovation of approximately 11,600 square feet of office space and restrooms. |
| 2516GG-004.02S1 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 3). |
$49,956.15 |
Additional soffit framing and power receptacles. |
| 2516GG-006.01B1 |
Los Nietos Senior Center Generator Electrical Panel Load Readings |
$4,459.98 |
30-day metered panel load testing for sub-panel board "B" located in the electrical room 225A-208Y/120V-3Ø -4W. |
| 2516GG-007.01B1 |
Potrero Heights Community Center Generator Electrical Panel Load Readings |
$4,459.98 |
30-day metered panel load testing for sub-panel board "LA" located in the electrical room 100A-208Y/120V-3Ø-4W. |
| 2516GG-008.01B1 |
OVMC SB1953 Underground Utility Investigation |
$24,486.81 |
Provide labor, equipment, and material to locate and verify the existing sanitary sewer infrastructure serving the Central Plant and Emergency Department buildings. |
| 2516GG-009.01S1 |
Willowbrook Senior Center - Emergency Generator. |
$60,315.96 |
Delivery and installation of new 400 amp panel. |