| 2516GG-001.01B1 |
Los Angeles General Medical Center USP 800 Pharmacy Upgrade Project |
$1,448,965.01 |
Remodel the sterile compounding areas of the inpatient/outpatient pharmacy. |
| 2516GG-003.01S1 |
Hollywood Wilshire Public Health Center Deferred Maintenance Repairs Project. |
$425,305.59 |
Corrections to low pressure side of HVAC system, main duct repairs, HVAC final air balance. |
| 2516GG-004.01B1 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 3). |
$3,375,821.35 |
Phase 3 renovation of approximately 11,600 square feet of office space and restrooms. |
| 2516GG-004.02S1 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 3). |
$49,956.15 |
Additional soffit framing and power receptacles. |
| 2516GG-004.03S1 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 3) |
$42,814.33 |
Additional access panel, door replacement and paint. |
| 2516GG-004.04S2 |
Public Defender - Foltz 19th Floor Refurbishment (Phase 3). |
$10,906.42 |
Additional pendant lighting fixtures and power outlet. |
| 2516GG-005.01B1 |
HUCLA RP - Outpatient 6th Floor Residential Lounge Area |
$79,082.04 |
Provide all labor, materials, and equipment to install 20 data duplex outlets on the 6th floor of the HUCLA Outpatient Building. |
| 2516GG-005.02S1 |
HUCLA RP - Outpatient 6th Floor 6109 Lounge |
$49,606.23 |
Provide all labor, materials, and equipment to install 6 duplex power and 6 data duplex on the 6th floor of the HUCLA Outpatient Building. |
| 2516GG-005.03S1 |
HUCLA RP - Outpatient 5th Floor 5302 Lounge |
$48,474.12 |
Provide all labor, materials, and equipment to install 2 duplex power, 2 quad power, and 4 data duplex on the 5th floor of the HUCLA Outpatient Building. |
| 2516GG-005.04S1 |
HUCLA RP - Outpatient Pharmacy 1st Floor |
$15,875.08 |
Provide all labor, materials, and equipment to install 1 duplex power and 1 data duplex on the 1st floor Outpatient Building Pharmacy. |
| 2516GG-006.01B1 |
Los Nietos Senior Center Generator Electrical Panel Load Readings |
$4,459.98 |
30-day metered panel load testing for sub-panel board "B" located in the electrical room 225A-208Y/120V-3Ø -4W. |
| 2516GG-007.01B1 |
Potrero Heights Community Center Generator Electrical Panel Load Readings |
$4,459.98 |
30-day metered panel load testing for sub-panel board "LA" located in the electrical room 100A-208Y/120V-3Ø-4W. |
| 2516GG-008.01B1 |
OVMC SB1953 Underground Utility Investigation |
$24,486.81 |
Provide labor, equipment, and material to locate and verify the existing sanitary sewer infrastructure serving the Central Plant and Emergency Department buildings. |
| 2516GG-009.01S1 |
Willowbrook Senior Center - Emergency Generator. |
$60,315.96 |
Delivery and installation of new 400 amp panel. |
| 2516GG-010-01S1 |
ELA Community Service Center - Emergency Generator |
$14,568.43 |
Repair the existing gate on the West side of the building. |