2408GG-001.01B1 |
OVMC - ATS Replacement - ATS Procurement |
$579,801.88 |
Provide labor, equipment, material and testing to procure the new ATS. |
2408GG-001.02S1 |
OVMC ATS Replacement Main Hospital |
$1,612,008.10 |
Provide labor, equipment, and materials to replace and install the six ATSs in the hospital. Retrofit three existing rooms into switchgear room. |
2408GG-001.03S1 |
OVMC ATS Replacement - ATS Connection to MTS. |
$131,145.92 |
Upgrade and connect MTS control to the new ATS's. |
2408GG-001.04S1 |
OVMC - ATS Replacement - Existing ATSs 30 Day Load Measurement. |
$35,853.21 |
Perform 30-day load measurement of existing ATSs. |
2408GG-001.05S1 |
OVMC - ATS Replacement - Temp ATS Substation B |
$66,211.45 |
Provide labor, equipment, materials for a temporary ATS located at Substation B. |
2408GG-001.06S1 |
OVMC - ATS Replacement - Emergency Power System Control Upgrade |
$106,814.45 |
Perform emergency power system control upgrade. |
2408GG-001.08B3 |
OVMC ATS Replacement ATS Project |
$142,763.43 |
Long lead procurement of ATS for the Central Plant at OVMC. |
2408GG-002.01B1 |
Baldwin Hills Slope Repair. |
$309,989.19 |
Remove and replace existing tarp on slope. |
2408GG-002.02S1 |
Baldwin Hills Slope Repair |
$10,142.60 |
Reimbursement for BSS Permit Fee. |