| 2517GG-001.01B3 |
Pomona Public Health Center Deferred Maintenance Repairs |
$53,530.31 |
Provide and install building exhaust fan. |
| 2517GG-002.01B1 |
Roosevelt Park, Remodeling, Maintenance, and Repair |
$289,187.72 |
Remodel and repair of the stormwater BMPs at Roosevelt Park. |
| 2517GG-003.01B1 |
HUCLA OLD HOSPITAL TOWER DEMO - Communication Vault De-Watering |
$4,703.20 |
|
| 2517GG-003.02B2 |
HUCLA Hospital Tower Demo - Power Load Study of 1 East Building and Air Monitoring Survey of Surgery/Emergency Building |
$33,644.38 |
Provide all labor, materials, and equipment. Provide a power study (minimum 72 hours) of 1 East Distribution Panel, and Air Measurement Study of (19) supply registers and (4) exhaust registers at the Surgery/Emergency Building. |
| 2517GG-004.01S1 |
Natural History Museum Deferred Maintenance Repairs |
$79,060.14 |
Repair of the fire sprinkler/alarm systems. |
| 2517GG-007.01S1 |
Olive View UCLA Medical Center Fire Alarm/Nurse Call Systems - Smoke Dampers Replacement |
$80,312.56 |
OVMC Unforeseen lab exhaust. |
| 2517GG-008.01B2 |
Warm Landing Place Facility Project |
$444,119.28 |
Secure the Demolition Permit and removal of the entire structure, including but not limited to walls, foundations, roof assembly, on-grade slab, interior partitions, ceiling assemblies, structural components, plumbing fixtures, doors, windows, finishes, accessories, and in-site utility lines. |
| 2517GG-008.02S1 |
Warm Landing Place Facility. |
$20,654.22 |
Foundation bigger than anticipated and a layer of asphalt found under soil. |
| 2517GG-011.01B4 |
Baldwin Park Registered Veterinary Technician Room Remodel Project |
$49,406.89 |
Demolition and abetment work for approx. 2000 sf of existing RVT building refurbishment project. |
| 2517GG-011.02B4 |
Baldwin Park Registered Veterinary Technician Building Refurbishment |
$821,658.75 |
Renovation work for approx. 2000 sf of existing RVT building refurbishment project. |
| 2517GG-012.01S1 |
Monrovia Public Health Center Deferred Maintenance Repairs |
$243,215.04 |
1) HVAC changes at Tuberculosis Clinic and 2) Provide temporary cooling for Triage Room (01) and Nurse Manager's office (02) |
| 2517GG-013.01S1 |
MTD 622 U2 Line 24. |
$20,272.13 |
Repair damaged lateral (60 feet) and catch basin. |
| 2517GG-013.02S1 |
MTD 622 U2 Line 24 CB and Lateral Repair |
$29,337.52 |
Repair damaged lateral (60'), catch basin, and revised column supports. |
| 2517GG-016.01B1 |
Bell Library Refurbishment Project. |
$30,101.11 |
Drywall water damage, modify library shelving system, fix wall graphics. |