laco seal
Toggle navigation
dpw.lacounty.gov
  • Menu 
    • DPW Home
    • Do Business with Public Works
    • Local Small Business Enterprise | LSBE
      • Goods & Services
      • Construction
    • Disabled Veteran Business Enterprise | DVBE
    • Social Enterprise | SE
    • Prime Contractor
    • Get Contracts
    • Opportunities
    • Active As-Needed
    • Active JOC Contracts
    • Get Informed
    • Calendar of Events
    • Contact Us
    • Resources
Certify
Connect
Grow

Active JOC Contracts

Active JOC Contracts

Job Order Contracting (JOC) is a flexible process used for contractors to provide maintenance, repair and refurbishment of County infrastructure and building facilities. After award of a JOC contract, individual work orders are issued on an as-needed basis, over the course of a one year contract. Learn more about Job Order ContractingLearn More

JOC Summary

Work Orders for JOC Contract 1804

MTM Construction, Inc.
$4,900,000
PW15198
1/16/2019
1/15/2020

Projects

Work Order # Work Order Title Work Order Amount Work Order Description
1804-002.01B1 Alondra Community Regional Park Deferred Maintenance Repairs $262,341.54

Replace existing electrical service switchboard and meter section.

1804-003.01B1 Bassett Park DM Repairs $124,532.13

Deferred Maintenance Repairs: Replace electrical equipment, HVAC duct cleaning, repairs in the restrooms, janitor room, and multipurpose room.

1804-003.02S1 Bassett Park Deferred Maintenance Repairs Painting, Electrical Equipment, and Power Shutdown $14,897.20

Deferred maintenance work which will include replacing electrical equipment, HVAC duct cleaning, repairs in the restrooms, janitor room, and multipurpose room.

1804-004.01B1 Bonelli Regional Park Deferred Maintenance $246,868.11

Bonelli Regional Park Deferred Maintenance Repairs Project- Repair electrical, mechanical and building items throughout the park buildings.

1804-005.01B1 Castaic Lake Deferred Maintenance Repairs $512,045.46

Various repairs and deferred maintenance at Castaic Lake including Administration building, pumphouse, comfort station, Sheriff substation, lifeguard tower, blue traffic hut, and others.

1804-006.01B1 City Terrace Park Deferred Maintenance Repairs $142,821.00

Replace damaged concrete topping slab at pool deck, air conditioning unit in gymnasium lobby, remove and replace damaged pool pump, and exhaust fan.

1804-007.01B1 Roosevelt Park Deferred Maintenance Repairs $29,249.53

Replace metal door and electrical panels.

1804-008.01B1 Jesse Owens Park Deferred Maintenance Repairs $122,755.83

Replace missing electrical panel blank breaker spacers and existing gas heating.

1804-009.01B1 Mayberry Park Deferred Maintenance Repairs $417,859.33

Repair spalling concrete on eave of gymnasium building.

1804-010.01B1 Valleydale Park Deferred Maintenance $70,375.63

Replace existing flooring with sheet vinyl tile, patch, repair, and repaint existing barrel vaulted metal roof

1804-010.02B4 Valleydale Park Deferred Maintenance Repairs Play Area Resilient Surfacing Replacement $120,514.61

Replace existing flooring with sheet vinyl tile, patch, repair, and repaint existing barrel vaulted metal roof.

1804-010.03S2 Valleydale Park Deferred Maintenance Repairs $2,984.82

Change order to paint the roof drip edge to match the roof trim and additional pipe insulation

1804-011.01B1 Victoria Park Deferred Maintenance Repairs $189,277.85

Remove and replace doors and frames on main electrical shed.

1804-012.01B1 Whittier Narrows Park Deferred Maintenance Repairs $122,082.68

Replace and fix deteriorated Picnic areas at Whittier Narrows Park.

1804-013.01S1 Fort Moore Pioneer Monument Refurbishment Project Additional Site Work & Repairs $8,889.85

Camera survey existing 8-inch storm drain line and fabricate and install additional security fencing and provide ADA compliant guard rail at ADA ramp.

1804-013.02S1 Fort Moore Pioneer Monument Refurbishment Mechanical Vault Equipment Repairs $109,869.41

Perform emergency repairs to the damaged electrical and mechanical equipment caused by flooding of the underground mechanical vault.

1804-014.01B1 Deferred Maintenance Coroner Electric Load Reading $5,187.04

Provide 30-day load reading on Distribution Board low voltage side of substation 1 & 2.

1804-015.01B1 MLK Recuperative Care Center Phase 8 Supplemental $1,469.52

Re-located ADA push plates for better access. Provide exterior cover on gate operators to protect from weather.

1804-016.01B1 Central HVAC Refurbishment Air Balance for First Floor $3,481.06

Final air balance at Center Health Center first floor Triage area.

Total $2,507,502.60
Go to page
Adobe Acrobat Reader is required to view (.pdf) documents.
Click on logo below to download Adobe Acrobat Reader.
Adobe Acrobat
  • lacounty.gov
  • Public Works FAQ
  • Privacy - Terms of Use
  • Feedback
  • Feedback

Translate