1804-002.01B1 |
Alondra Community Regional Park Deferred Maintenance Repairs |
$262,341.54 |
Replace existing electrical service switchboard and meter section. |
1804-003.01B1 |
Bassett Park DM Repairs |
$124,532.13 |
Deferred Maintenance Repairs: Replace electrical equipment, HVAC duct cleaning, repairs in the restrooms, janitor room, and multipurpose room. |
1804-003.02S1 |
Bassett Park Deferred Maintenance Repairs Painting, Electrical Equipment, and Power Shutdown |
$14,897.20 |
Deferred maintenance work which will include replacing electrical equipment, HVAC duct cleaning, repairs in the restrooms, janitor room, and multipurpose room. |
1804-004.01B1 |
Bonelli Regional Park Deferred Maintenance |
$246,868.11 |
Bonelli Regional Park Deferred Maintenance Repairs Project- Repair electrical, mechanical and building items throughout the park buildings. |
1804-005.01B1 |
Castaic Lake Deferred Maintenance Repairs |
$512,045.46 |
Various repairs and deferred maintenance at Castaic Lake including Administration building, pumphouse, comfort station, Sheriff substation, lifeguard tower, blue traffic hut, and others. |
1804-006.01B1 |
City Terrace Park Deferred Maintenance Repairs |
$142,821.00 |
Replace damaged concrete topping slab at pool deck, air conditioning unit in gymnasium lobby, remove and replace damaged pool pump, and exhaust fan. |
1804-007.01B1 |
Roosevelt Park Deferred Maintenance Repairs |
$29,249.53 |
Replace metal door and electrical panels. |
1804-008.01B1 |
Jesse Owens Park Deferred Maintenance Repairs |
$122,755.83 |
Replace missing electrical panel blank breaker spacers and existing gas heating. |
1804-009.01B1 |
Mayberry Park Deferred Maintenance Repairs |
$417,859.33 |
Repair spalling concrete on eave of gymnasium building. |
1804-010.01B1 |
Valleydale Park Deferred Maintenance |
$70,375.63 |
Replace existing flooring with sheet vinyl tile, patch, repair, and repaint existing barrel vaulted metal roof |
1804-010.02B4 |
Valleydale Park Deferred Maintenance Repairs Play Area Resilient Surfacing Replacement |
$120,514.61 |
Replace existing flooring with sheet vinyl tile, patch, repair, and repaint existing barrel vaulted metal roof. |
1804-010.03S2 |
Valleydale Park Deferred Maintenance Repairs |
$2,984.82 |
Change order to paint the roof drip edge to match the roof trim and additional pipe insulation |
1804-011.01B1 |
Victoria Park Deferred Maintenance Repairs |
$189,277.85 |
Remove and replace doors and frames on main electrical shed. |
1804-012.01B1 |
Whittier Narrows Park Deferred Maintenance Repairs |
$122,082.68 |
Replace and fix deteriorated Picnic areas at Whittier Narrows Park. |
1804-013.01S1 |
Fort Moore Pioneer Monument Refurbishment Project Additional Site Work & Repairs |
$8,889.85 |
Camera survey existing 8-inch storm drain line and fabricate and install additional security fencing and provide ADA compliant guard rail at ADA ramp. |
1804-013.02S1 |
Fort Moore Pioneer Monument Refurbishment Mechanical Vault Equipment Repairs |
$109,869.41 |
Perform emergency repairs to the damaged electrical and mechanical equipment caused by flooding of the underground mechanical vault. |
1804-014.01B1 |
Deferred Maintenance Coroner Electric Load Reading |
$5,187.04 |
Provide 30-day load reading on Distribution Board low voltage side of substation 1 & 2. |
1804-015.01B1 |
MLK Recuperative Care Center Phase 8 Supplemental |
$1,469.52 |
Re-located ADA push plates for better access. Provide exterior cover on gate operators to protect from weather. |
1804-016.01B1 |
Central HVAC Refurbishment Air Balance for First Floor |
$3,481.06 |
Final air balance at Center Health Center first floor Triage area. |