| LA River Headwaters Pavilion Project |
Restroom Const. and Upgrades
LA River Headwaters Pavilion Project
()
|
$6,200,000 |
Mar-2026 |
| MTD 768 Soffit Repairs |
U/G Drain Repair and Rehab.
MTD 768 Soffit Repairs
(PMDIII)
|
$350,000 |
Feb-2026 |
| El Dorado Pump Station Rehabilitation |
Pump Station Upgrade
El Dorado Pump Station Rehabilitation
(PMDIII)
|
$7,000,000 |
Mar-2026 |
| Slauson Avenue over San Gabriel River BNSF & SCRRA & UPRR (53C-0084) |
Seismic Retrofit
Slauson Avenue over San Gabriel River BNSF & SCRRA & UPRR (53C-0084)
(PMDIII)
|
$2,200,000 |
Mar-2027 |
| Little Tujunga Cyn Rd Over Buck Cyn 53C-0967 |
Bridge Replacement
Little Tujunga Cyn Rd Over Buck Cyn 53C-0967
(PMDIII)
|
$6,800,000 |
Jun-2027 |
| Malibu Cyn Rd over Malibu Cyn Ck (53C0620)v |
Bridge Replacement
Malibu Cyn Rd over Malibu Cyn Ck (53C0620)v
(PMDIII)
|
$7,900,000 |
Jul-2030 |
| Little Tujunga Cyn Rd over Pacoima Ck (53C0969) |
Bridge Replacement
Little Tujunga Cyn Rd over Pacoima Ck (53C0969)
(PMDIII)
|
$5,200,000 |
Mar-2029 |
| San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0518) |
Bridge Replacement
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0518)
(PMDIII)
|
$4,300,000 |
Sep-2028 |
| San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0519) |
Bridge Replacement
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C0519)
(PMDIII)
|
$4,100,000 |
Feb-2029 |
| San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C-0517) |
Construct Bridge
San Francisquito Cyn Rd over San Francisquito Cyn Ck (53C-0517)
()
|
$7,000,000 |
Nov-2029 |
| Soledad Cyn Rd over LACMTA & SCRRA Tracks BR NO 53C-0555 |
Bridge Replacement
Soledad Cyn Rd over LACMTA & SCRRA Tracks BR NO 53C-0555
()
|
$4,600,000 |
Apr-2029 |
| Peck Road over San Gabriel River BR NO 53C-0617L & R |
Rehabilitation
Peck Road over San Gabriel River BR NO 53C-0617L & R
(PMDIII)
|
$5,500,000 |
Jun-2028 |
| Circle Trail over Topanga Cyn Creek 53C-0970 |
Bridge replacement
Circle Trail over Topanga Cyn Creek 53C-0970
(PMDIII)
|
$0 |
Apr-2027 |
| Soledad Cyn Rd over Santa Clara River 53C-0488 |
Bridge replacement
Soledad Cyn Rd over Santa Clara River 53C-0488
()
|
$16,000,000 |
Mar-2029 |
| The Old Rd over Castaic Creek 53C-1403 |
Bridge Seismic Retrofit
The Old Rd over Castaic Creek 53C-1403
()
|
$3,700,000 |
Jul-2026 |
| Compton Bl et al - East Rancho Dominguez |
Resurface Asphalt
Compton Bl et al - East Rancho Dominguez
()
|
$9,700,000 |
Mar-2027 |
| Compton Blvd over Compton Creek 53C-0925 |
Bridge Replacement
Compton Blvd over Compton Creek 53C-0925
()
|
$7,600,000 |
Dec-2031 |
| Wilmington Ave over Compton Creek 53C-0907 |
Bridge Replacement
Wilmington Ave over Compton Creek 53C-0907
()
|
$5,200,000 |
Dec-2028 |
| Windsor Hills - Southridge Avenue et al |
Reconstruct 1.1 mi of roadways
Windsor Hills - Southridge Avenue et al
()
|
$3,700,000 |
Jul-2026 |
| Norwalk Bl et al |
Reconstruct and Resurface
Norwalk Bl et al
()
|
$10,000,000 |
Jul-2026 |
| East Los Angeles - Whiteside Street et al Ph I |
Reconstruct 2.3 mi of locals
East Los Angeles - Whiteside Street et al Ph I
()
|
$6,100,000 |
Jun-2026 |
| Bridge Preventive Maintenance Program - Group 11 Cities |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 11 Cities
(PMDIII)
|
$4,000,000 |
Dec-2027 |
| Bridge Preventive Maintenance Program - Group 15 City |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 15 City
()
|
$4,500,000 |
Dec-2028 |
| Bridge Preventive Maintenance Program - Group 17 City |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 17 City
()
|
$1,000,000 |
Apr-2028 |
| Mulberry Dr and Painter Av Intersection Improvements |
Intersection improvements
Mulberry Dr and Painter Av Intersection Improvements
()
|
$2,700,000 |
Sep-2026 |
| Washington Bl et al |
Road Resurfacing
Washington Bl et al
(PMDIII)
|
$2,900,000 |
Oct-2026 |
| Lake Hughes Rd at 235ft S-o MM2.47 (2015 Oct Storm) |
Road pavement and culvert
Lake Hughes Rd at 235ft S-o MM2.47 (2015 Oct Storm)
()
|
$2,300,000 |
Mar-2027 |
| Bridge Preventive Maintenance Program - Group 24 City |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Group 24 City
()
|
$1,200,000 |
Jun-2028 |
| Bridge Preventive Maintenance Program - Group 25 Cities |
Bridge preventive maintenance
Bridge Preventive Maintenance Program - Group 25 Cities
()
|
$2,400,000 |
Sep-2028 |
| Puente Creek Bikeway |
Bikeway improvements
Puente Creek Bikeway
(PMDIII)
|
$8,500,000 |
Sep-2026 |
| Michillinda Avenue Intersection Improvements Project |
Intersection Improvement.
Michillinda Avenue Intersection Improvements Project
(PMDIII)
|
$2,300,000 |
Jan-2026 |
| Decker School Rd @ MM 1-04 Slope Repair Off-Sys (2019FEBSTM1) |
Slope Repair
Decker School Rd @ MM 1-04 Slope Repair Off-Sys (2019FEBSTM1)
()
|
$1,100,000 |
Dec-2026 |
| Bridge Preventive Maintenance Program - Groups 12 and 13 |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Groups 12 and 13
()
|
$2,900,000 |
Jan-2027 |
| Bridge Preventive Maintenance Program - Groups 18 & 19 |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Groups 18 & 19
(PMDIII)
|
$1,800,000 |
Nov-2027 |
| Westmont/West Athens Pedestrian Improvements (MM4601.04) |
Ped Improvmt
Westmont/West Athens Pedestrian Improvements (MM4601.04)
(PMDIII)
|
$10,000,000 |
Dec-2027 |
| Bridge Preventive Maintenance Program - Groups 21 and 23 and 26 |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Groups 21 and 23 and 26
()
|
$3,700,000 |
Feb-2028 |
| Bridge Preventive Maintenance Program - Groups 14, 20, and 22 |
Bridge Preventive Maintenance
Bridge Preventive Maintenance Program - Groups 14, 20, and 22
(PMDIII)
|
$2,600,000 |
Dec-2027 |
| Lark Ellen Av Median Improvements, et al., Phase I |
Frontage median, Vine Planting
Lark Ellen Av Median Improvements, et al., Phase I
(PMDIII)
|
$1,900,000 |
Jan-2026 |
| West Puente Valley - Temple Avenue et al |
Resurface 3.17 mi of majors.
West Puente Valley - Temple Avenue et al
()
|
$4,100,000 |
May-2026 |
| Avocado Heights San Jose Hills - Valley Boulevard |
Reconstruct 2.7 mi of majors
Avocado Heights San Jose Hills - Valley Boulevard
(PMDIII)
|
$8,900,000 |
Jul-2026 |
| Hacienda Heights - Hacienda Boulevard Phase I |
Resurface 2.4 mi of majors
Hacienda Heights - Hacienda Boulevard Phase I
(PMDIII)
|
$3,400,000 |
Dec-2026 |
| Hacienda Heights Community - Leticia Drive et al Phase II |
Reconstruct 5.8 mi of locals
Hacienda Heights Community - Leticia Drive et al Phase II
()
|
$6,300,000 |
Sep-2027 |
| Rosewood - 139th Street, et al. Phase II |
Reconstruct 4.15 mi of locals
Rosewood - 139th Street, et al. Phase II
()
|
$11,000,000 |
May-2026 |
| East Los Angeles - City Terrace Drive |
Rehab 1.7 mi - City Terrace Dr
East Los Angeles - City Terrace Drive
(PMDIII)
|
$25,000,000 |
Sep-2027 |
| Willowbrook - 130th Street, et al. |
Pavement Rehabilitation
Willowbrook - 130th Street, et al.
()
|
$5,200,000 |
Oct-2027 |
| RMDJOC6769 Pavement Preservation (Seal Coats), North Los Angeles County |
Pavement Preservation (Seal Co
RMDJOC6769 Pavement Preservation (Seal Coats), North Los Angeles County
(RMD)
|
$5,200,000 |
Feb-2026 |
| LAKE HUGHES RD - 215 FEET E OF MM 20.58 AND SAN FRANCISQUITO CANYON RD - 530 FEET N OF MM 16.33 |
Install chevron signs and curve advance warning signs
LAKE HUGHES RD - 215 FEET E OF MM 20.58 AND SAN FRANCISQUITO CANYON RD - 530 FEET N OF MM 16.33
(BRCD)
|
$700,000 |
May-2026 |
| South Whittier-Leffingwell Road at Stamy Road (La Mirada) |
New Traffic Signal
South Whittier-Leffingwell Road at Stamy Road (La Mirada)
()
|
$700,000 |
Jun-2026 |
| Bouquet Canyon Rd at Vasquez Canyon Rd |
New Traffic Signal
Bouquet Canyon Rd at Vasquez Canyon Rd
()
|
$425,000 |
May-2026 |
| East Los Angeles - Eastern Av at Ramona Bl |
Traffic Signal Upgrade
East Los Angeles - Eastern Av at Ramona Bl
()
|
$800,000 |
Mar-2027 |
| Charter Oak - Cienega Av at Sunflower Av |
Traffic Signal Upgrade
Charter Oak - Cienega Av at Sunflower Av
()
|
$800,000 |
Apr-2026 |
| Covina Islands - Arrow Hwy at Sunflower Av |
Traffic Signal Upgrade
Covina Islands - Arrow Hwy at Sunflower Av
()
|
$1,100,000 |
Nov-2026 |
| East Valinda and San Jose Hills - Gemini St at Azusa Av |
Traffic Signal Upgrade
East Valinda and San Jose Hills - Gemini St at Azusa Av
()
|
$175,000 |
Dec-2026 |
| San Gabriel Valley Traffic Signal Safety Project Group II |
Traffic Signal Upgrade
San Gabriel Valley Traffic Signal Safety Project Group II
(PMDIII)
|
$1,700,000 |
May-2026 |
| Azusa - Barranca Av at Baseline Rd |
Traffic Signal Upgrade
Azusa - Barranca Av at Baseline Rd
()
|
$450,000 |
Nov-2026 |
| La Crescenta-Montrose - Foothill Blvd at Cloud Av |
New Traffic Signal
La Crescenta-Montrose - Foothill Blvd at Cloud Av
(PMDIII)
|
$1,100,000 |
Feb-2026 |
| View Park-Windsor Hills - Angeles Vista Blvd at 48th St |
New Traffic Signal
View Park-Windsor Hills - Angeles Vista Blvd at 48th St
()
|
$475,000 |
Jun-2026 |
| Alameda Street Traffic Signal Safety Project |
Traffic Signal Upgrade
Alameda Street Traffic Signal Safety Project
(PMDIII)
|
$2,000,000 |
Dec-2026 |
| Avalon Boulevard Traffic Signal Safety Project |
Traffic Signal Upgrade
Avalon Boulevard Traffic Signal Safety Project
(BRCD)
|
$750,000 |
Mar-2026 |
| South Whittier - Imperial Hwy at Burgess Ave |
New Traffic Signal
South Whittier - Imperial Hwy at Burgess Ave
()
|
$1,200,000 |
Sep-2026 |
| Broadway-Normandie-Rosecrans Traffic Signal Safety Project |
Traffic Signal Upgrade
Broadway-Normandie-Rosecrans Traffic Signal Safety Project
()
|
$3,200,000 |
Feb-2026 |
| Malibu Canyon Road North of MM 2-32 |
Install Guardrail
Malibu Canyon Road North of MM 2-32
()
|
$825,000 |
Nov-2026 |
| Santa Monica Mountains - Kanan Tunnel, Mulholland Highway and Kanan Dume Road project |
Guardrail Installation
Santa Monica Mountains - Kanan Tunnel, Mulholland Highway and Kanan Dume Road project
()
|
$1,500,000 |
Jan-2027 |
| Bus Stop Improvements - Antelope Valley and Santa Clarita |
Bus Stop Improvements N.County
Bus Stop Improvements - Antelope Valley and Santa Clarita
(PMDIII)
|
$2,400,000 |
Oct-2027 |
| Alameda Street TSSP - Nadeau Street to Auto Drive South |
TSSP
Alameda Street TSSP - Nadeau Street to Auto Drive South
(PMDIII)
|
$1,300,000 |
Sep-2026 |
| Lower Azusa Rd-Los Angeles St TSSP - Rosemead Blvd to Maine Ave |
TSSP
Lower Azusa Rd-Los Angeles St TSSP - Rosemead Blvd to Maine Ave
(BRCD)
|
$2,000,000 |
Aug-2026 |
| Valley Blvd-Holt Ave TSSP - Lemon Ave to Mills Ave |
TSSP
Valley Blvd-Holt Ave TSSP - Lemon Ave to Mills Ave
(BRCD)
|
$2,300,000 |
Sep-2026 |
| Myrtle Avenue-Peck Road TSSP - Huntington Drive to Clark Street |
TSSP
Myrtle Avenue-Peck Road TSSP - Huntington Drive to Clark Street
()
|
$675,000 |
Aug-2026 |
| Ramona Boulevard-Badillo Street-Covina Boulevard TSSP - Santa Anita Ave to the 57 Fwy and BSP - Tyler Ave to Grand Ave |
TSSP and BSP
Ramona Boulevard-Badillo Street-Covina Boulevard TSSP - Santa Anita Ave to the 57 Fwy and BSP - Tyler Ave to Grand Ave
()
|
$1,700,000 |
Nov-2026 |
| Avalon Boulevard TSSP - 126th Street to Sepulveda Boulevard |
TSSP
Avalon Boulevard TSSP - 126th Street to Sepulveda Boulevard
(BRCD)
|
$4,100,000 |
Jun-2026 |
| Imperial Highway TSSP - Sundale Avenue to Budlong Avenue |
TSSP
Imperial Highway TSSP - Sundale Avenue to Budlong Avenue
(BRCD)
|
$1,400,000 |
Aug-2026 |
| Slauson Avenue TSSP - Santa Fe Avenue to Chapin Road |
TSSP
Slauson Avenue TSSP - Santa Fe Avenue to Chapin Road
(PMDIII)
|
$975,000 |
Aug-2026 |
| Redondo Beach Boulevard TSSP - Artesia Boulevard to Vermont Avenue |
TSSP
Redondo Beach Boulevard TSSP - Artesia Boulevard to Vermont Avenue
(PMDIII)
|
$775,000 |
Jun-2026 |
| Rosecrans Av (West) TSSP - Highland Avenue to Ocean Gate Avenue |
TSSP
Rosecrans Av (West) TSSP - Highland Avenue to Ocean Gate Avenue
(PMDIII)
|
$500,000 |
Sep-2026 |
| South Bay ITS - Arterial System Detection |
ITS
South Bay ITS - Arterial System Detection
(BRCD)
|
$1,200,000 |
Jun-2026 |
| Gateway Cities Fiber Optic Communications and CCTV Camera Project |
Fiber optic and CCTV
Gateway Cities Fiber Optic Communications and CCTV Camera Project
(PMDIII)
|
$2,400,000 |
Jun-2026 |
| Florence Avenue @ Graham Avenue et al |
TSSP
Florence Avenue @ Graham Avenue et al
(BRCD)
|
$525,000 |
Nov-2026 |
| Las Tunas Drive-Live Oak Avenue-Arrow Highway TSSP - Baldwin Avenue to Valley Center Avenue |
TSSP
Las Tunas Drive-Live Oak Avenue-Arrow Highway TSSP - Baldwin Avenue to Valley Center Avenue
(BRCD)
|
$4,800,000 |
Jan-2027 |
| Santa Anita Avenue TSSP - Duarte Road to Durfee Avenue |
TSSP
Santa Anita Avenue TSSP - Duarte Road to Durfee Avenue
(BRCD)
|
$4,500,000 |
Sep-2027 |
| Whittier Boulevard TSSP - Indiana Street to Paramount Boulevard |
TSSP
Whittier Boulevard TSSP - Indiana Street to Paramount Boulevard
()
|
$3,500,000 |
Oct-2027 |
| Manhattan Beach Boulevard TSSP - Manhattan Avenue to Van Ness Avenue |
TSSP
Manhattan Beach Boulevard TSSP - Manhattan Avenue to Van Ness Avenue
(BRCD)
|
$1,300,000 |
Jun-2026 |
| 50th Street West-Rancho Vista Boulevard TSSP - Avenue L to Peonza Lane |
TSSP
50th Street West-Rancho Vista Boulevard TSSP - Avenue L to Peonza Lane
(BRCD)
|
$775,000 |
Sep-2026 |
| Devil's Gate Southeast Entrance Improvements |
Southeast Entrance Improvement
Devil's Gate Southeast Entrance Improvements
(PMDIII)
|
$1,300,000 |
May-2026 |
| Devil's Gate Reservoir Annual Cleanout 2026 |
Sediment Removal
Devil's Gate Reservoir Annual Cleanout 2026
(PMDIII)
|
$0 |
Apr-2026 |
| New Sweetwater Mesa Water Tank Project |
Water Tank Construction
New Sweetwater Mesa Water Tank Project
()
|
$3,500,000 |
Sep-2026 |
| PCH 8-inch Waterline Improvements (Zumirez Drive to Escondido Beach Road) |
Replace 9,850 ft of water main
PCH 8-inch Waterline Improvements (Zumirez Drive to Escondido Beach Road)
()
|
$8,400,000 |
Jun-2026 |
| Upper Encinal Tank Improvement |
Tank construction
Upper Encinal Tank Improvement
(PMDIII)
|
$3,900,000 |
Feb-2027 |
| Encinal Canyon Road Emergency Interconnection |
Watermain installation
Encinal Canyon Road Emergency Interconnection
()
|
$4,800,000 |
Jan-2026 |
| Sweetwater Mesa Water Line Improvements |
Water Line Construction
Sweetwater Mesa Water Line Improvements
()
|
$5,100,000 |
Apr-2030 |