Item |
Description |
Unit of Measure |
Estimated Quantity |
1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
LS |
1 |
2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
5 |
3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
4 |
EXPLORATORY EXCAVATION OF UTILITIES (ALLOWANCE OF $50,000) |
AL |
50,000 |
5 |
CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $385,000) |
AL |
385,000 |
6 |
IMPLEMENTATION OF THE LTWHP |
LS |
1 |
7 |
IMPLEMENTATION OF BMPS |
LS |
1 |
8 |
OFFICE FACILITIES |
MTH |
6 |
9 |
MOBILIZATION |
LS |
1 |
10 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
11 |
PREPARATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN (STIPULATED UNIT PRICE OF $2500) |
LS |
1 |
12 |
IMPLEMENTATION OF THE SITE-SPECIFIC HEALTH AND SAFETY PLAN |
LS |
1 |
13 |
PREPARATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN (STIPULATED UNIT PRICE OF $2500) |
LS |
1 |
14 |
IMPLEMENTATION OF THE SITE-SPECIFIC ASBESTOS ABATEMENT PLAN |
LS |
1 |
15 |
REMOVAL AND DISPOSAL OF NON-HAZARDOUS ASBESTOS WASTE |
LS |
1 |
16 |
ENVIRONMENTAL AIR MONITORING |
LS |
1 |
17 |
COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
SF |
49,105 |
18 |
AC PAVEMENT(SURFACE COURSE) |
TON |
600 |
19 |
TRENCH BACKFILL SLURRY (CLASS 140-S-100) |
CY |
1,679 |
20 |
36" WATERMAIN, .375" THICK STL, CML&C (WELDED JOINTS) |
LF |
4,060 |
21 |
48" STEEL CASING |
LF |
140 |
22 |
JACK 48" STEEL CASING |
LF |
70 |
23 |
AIR RELEASE AND VACUUM VALVE ASSEMBLY, 4" |
EA |
8 |
24 |
BUTTERFLY VALVE, 150 PSI WWP, 36" |
EA |
6 |
25 |
GATE VALVE, 200 PSI WWP, 12" |
EA |
9 |
26 |
PUMP WELL ASSEMBLY, TOP DRAINING,STD PLAN W-53, STYLE A |
EA |
8 |
27 |
INTERCONNECTION TO EXISTING WATERMAIN |
EA |
4 |
28 |
CATHODIC PROTECTION ANODE AND TEST STATION, STD PLAN W-39 |
EA |
3 |
29 |
VIDEO INSPECTION |
LS |
1 |
30 |
TRAFFIC CONTROL |
LS |
1 |
31 |
FLASHING ARROW SIGN |
EA |
5 |
32 |
CHANGEABLE MESSAGE SIGN |
EA |
4 |