Item |
Description |
Unit of Measure |
Estimated Quantity |
1 |
CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $3,000) |
LS |
1 |
2 |
CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
MTH |
6 |
3 |
CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
LS |
1 |
4 |
CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $35,000) |
AL |
35,000 |
5 |
IMPLEMENTATION OF BMPS |
LS |
1 |
6 |
SHORING OF OPEN EXCAVATIONS |
LS |
1 |
7 |
OFFICE FACILITIES |
MTH |
6 |
8 |
MOBILIZATION |
LS |
1 |
9 |
COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
SF |
65,340 |
10 |
AC PAVEMENT(SURFACE COURSE) |
TON |
790 |
11 |
TRENCH BACKFILL SLURRY (CLASS 140-S-100) |
CY |
2,113 |
12 |
12" WATERMAIN, 0.25" THICK STEEL, CML&C |
LF |
35 |
13 |
24" WATERMAIN, 0.25" THICK STEEL, CML&C, WELDED |
LF |
5,331 |
14 |
36" STEEL CASING |
LF |
83 |
15 |
AIR RELEASE AND VACUUM VALVE ASSEMBLY, 4" |
EA |
4 |
16 |
BUTTERFLY VALVE, 150 PSI WWP, 24" |
EA |
4 |
17 |
GATE VALVE, 200 PSI WWP, 12" |
EA |
5 |
18 |
PUMP WELL ASSEMBLY, TOP DRAINING,STD PLAN W-53, STYLE A |
EA |
5 |
19 |
INTERCONNECTION TO EXISTING WATERMAIN |
EA |
3 |
20 |
CATHODIC PROTECTION ANODE AND TEST STATION |
EA |
4 |
21 |
VIDEO INSPECTION |
LS |
1 |
22 |
TRAFFIC CONTROL - STAGE 1 |
LS |
1 |
23 |
TRAFFIC CONTROL - STAGE 2 |
LS |
1 |
24 |
TRAFFIC CONTROL - STAGE 3 |
LS |
1 |
25 |
TRAFFIC CONTROL - STAGE 4 |
LS |
1 |
26 |
CHANGEABLE MESSAGE SIGN |
EA |
4 |
27 |
FLASHING ARROW SIGN |
EA |
4 |
28 |
JOBS COORDINATOR (ALLOWANCE OF $10,000) |
AL |
10,000 |