Bid Price History

Pacoima Spreading Grounds Basin Enhancement Project
$54,483,460.00
05/04/2021
501 (J3),502 (A5),502 (A4),502 (A3),501 (J5),501 (J4)
8
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.001CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) 0.01 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.03 34MTH$500.00$500.00 $17,000.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.06.011IMPLEMENTATION OF THE LTWHP 0.21 1LS$10,000.00$115,000.00 $115,000.00 $151,375.00$120,000.00
001.07.004PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) 0.01 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
001.07.007IMPLEMENTATION OF THE SWPPP 0.55 1LS$85,000.00$300,000.00 $300,000.00 $236,250.00$210,000.00
001.07.021SHORING OF OPEN EXCAVATIONS 0.37 1LS$630,000.00$200,000.00 $200,000.00 $502,957.02$427,500.00
001.07.043PREPARATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN (STIPULATED UNIT PRICE OF $3000) 0.01 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
001.07.045IMPLEMENTATION OF THE SITE-SPECIFIC LEAD COMPLIANCE PLAN 0.14 1LS$25,000.00$75,000.00 $75,000.00 $22,737.50$18,250.00
001.08.005OFFICE FACILITIES 0.31 34MTH$3,000.00$5,000.00 $170,000.00 $6,756.25$6,250.00
001.09.003MOBILIZATION 7.34 1LS$4,000,000.00$3,998,042.48 $3,998,042.48 $5,799,176.56$5,647,185.00
300.01.003CLEARING AND GRUBBING 0.28 1LS$80,000.00$150,000.00 $150,000.00 $909,646.00$150,000.00
300.01.013TREE REMOVAL (6"-12" DIAMETER) 0 2EA$500.00$600.00 $1,200.00 $869.38$792.50
300.01.014TREE REMOVAL (13"-24" DIAMETER) 0.02 8EA$900.00$1,200.00 $9,600.00 $1,843.75$1,850.00
300.01.015TREE REMOVAL (25"+ DIAMETER) 0.05 11EA$1,100.00$2,500.00 $27,500.00 $3,225.00$3,500.00
300.01.057REMOVE EXISTING CHAIN LINK FENCE 0.16 11950LF$5.00$7.50 $89,625.00 $7.69$7.00
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 0.19 2960CY$160.00$35.00 $103,600.00 $117.00$100.00
300.01.067CONCRETE REMOVAL (REINFORCED) 0.08 523CY$350.00$80.00 $41,840.00 $173.00$140.00
300.02.003UNCLASSIFIED EXCAVATION 0.23 13881CY$70.00$9.00 $124,929.00 $40.63$44.50
300.06.003BASIN EXCAVATION 8.81 2085952CY$3.00$2.30 $4,797,689.60 $6.08$5.13
300.11.007RIPRAP (LIGHT CLASS) 0.04 160CY$100.00$150.00 $24,000.00 $173.25$172.50
300.11.009RIPRAP (QUARTER TON CLASS) 0.47 1817CY$120.00$140.00 $254,380.00 $164.50$157.50
300.11.017CONCRETED RIPRAP (LIGHT CLASS) 0.22 799CY$150.00$150.00 $119,850.00 $237.63$237.50
300.11.019CONCRETED RIPRAP (QUARTER TON CLASS) 0.21 921CY$150.00$125.00 $115,125.00 $239.38$253.00
301.02.005CRUSHED MISCELLANEOUS BASE 0.90 9805CY$70.00$50.00 $490,250.00 $56.56$37.50
302.05.001AC CURB, TYPE D2-6 0.14 22365LF$5.00$3.50 $78,277.50 $6.72$5.45
302.05.013AC PAVEMENT 2.56 13973TON$80.00$100.00 $1,397,300.00 $105.88$96.50
303.01.333TRANSITION STRUCTURE PER STD PLAN 342 0.19 4EA$5,000.00$26,000.00 $104,000.00 $22,776.25$24,605.00
303.01.346MANHOLE PER STD PLAN 320 0.12 4EA$5,000.00$17,000.00 $68,000.00 $17,912.50$16,000.00
303.05.043PCC WALK, 4" THICK 0 72SF$20.00$26.00 $1,872.00 $78.75$48.50
304.03.0095' HIGH WALK GATE 0 2EA$1,000.00$525.00 $1,050.00 $989.00$523.50
304.06.009TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE 0.02 4010LB$1.00$2.50 $10,025.00 $6.26$1.85
306.01.1078' - 0" W X 4' - 0" H RCB 0.28 20LF$2,250.00$7,500.00 $150,000.00 $4,648.25$4,650.00
306.01.1098' - 6" W X 3' - 0" H DBL RCB 0.49 128LF$1,200.00$2,100.00 $268,800.00 $2,198.75$2,165.00
306.01.13572" RUBBER GASKETED RCP, 2000 D 0.75 745LF$700.00$550.00 $409,750.00 $930.63$775.00
306.01.13554" RUBBER GASKETED RCP, 2000 D 0.49 896LF$510.00$295.00 $264,320.00 $483.75$408.50
306.01.13560" RUBBER GASKETED RCP, 2000 D 0.06 68LF$500.00$450.00 $30,600.00 $733.75$658.50
306.01.13536" RUBBER GASKETED RCP, 2000 D 0.12 342LF$340.00$190.00 $64,980.00 $285.63$224.00
306.01.13518" RUBBER GASKETED RCP, 2000 D 0.06 182LF$230.00$175.00 $31,850.00 $228.50$235.50
306.01.2034" WATERMAIN, .14" THICK STL 0.12 130LF$350.00$500.00 $65,000.00 $339.13$367.50
306.01.38060" CONCRETE COLLAR 0.01 1EA$5,000.00$4,200.00 $4,200.00 $4,880.63$3,750.00
306.02.011JACK 72" RUBBER GASKETED RCP, 3000 D 1.02 427LF$2,000.00$1,300.00 $555,100.00 $1,910.00$1,495.00
601.09.011TRAFFIC CONTROL 0.18 1LS$70,000.00$100,000.00 $100,000.00 $215,312.50$87,500.00
601.09.017FLASHING ARROW SIGN 0 2EA$5,000.00$1,000.00 $2,000.00 $4,797.50$1,000.00
801.04.015FURNISH AND PLANT 24" BOX TREE 0.03 21EA$700.00$650.00 $13,650.00 $950.00$675.00
801.06.003PLANT ESTABLISHMENT PERIOD 0.03 1LS$5,000.00$18,000.00 $18,000.00 $28,562.50$18,000.00
 STRUCTURE EXCAVATION (OUTLET STRUCTURE) 0.11 2602CY$55.00$23.00 $59,846.00 $42.50$32.00
 STRUCTURE EXCAVATION (OVERFLOW STRUCTURE) 0.17 7761CY$55.00$12.00 $93,132.00 $42.81$37.50
 SUBMERSIBLE LEVEL TRANSMITTER AND APPURTENANCES 0.06 8EA$4,000.00$4,000.00 $32,000.00 $5,613.75$4,750.00
 STRUCTURE EXCAVATION (WEIR STRUCTURE EAST) 0.02 65CY$55.00$150.00 $9,750.00 $74.31$87.50
 TRANSPORTATION AND DISPOSAL OF PETROLEUM WASTE (ALLOWANCE OF $5,000) 0.01 5000AL$1.00$1.00 $5,000.00 $1.00$1.00
 TREE PROTECTION 0.02 7EA$1,000.00$1,500.00 $10,500.00 $1,140.00$920.00
 WATER TRUCKS 1.88 682DAY$1,200.00$1,500.00 $1,023,000.00 $1,962.50$1,280.00
 VEHICLES AND EQUIPMENT EMISSIONS REPORTING 0.50 34MTH$1,000.00$8,000.00 $272,000.00 $5,146.25$935.00
 VENT STACK 0.04 4EA$3,000.00$6,000.00 $24,000.00 $6,257.50$5,535.00
 IMPLEMENTATION OF THE FUGITIVE DUST CONTROL PLAN 0.50 34MTH$1,500.00$8,000.00 $272,000.00 $4,125.00$2,500.00
 HAUL TRUCK STAGING AND IDLING PLAN (STIPULATED UNIT PRICE OF $2,500) 0 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 IMPLEMENTATION OF THE QUALITY CONTROL PROGRAM FOR MOISTURE CONTENT 1.25 682DAY$100.00$1,000.00 $682,000.00 $1,145.00$1,000.00
 INSTALLATION OF TIRE WASHES 0.63 3EA$50,000.00$115,000.00 $345,000.00 $157,375.00$123,000.00
 MAINTENANCE OF TIRE WASHES 0.58 90MTH$10,000.00$3,500.00 $315,000.00 $3,558.75$3,250.00
 KEYPAD PER DETAIL"K" 0.05 4EA$5,000.00$7,000.00 $28,000.00 $6,720.00$6,555.00
 MANUALLY OPERATED LIFT 0.01 4EA$2,000.00$1,500.00 $6,000.00 $5,381.25$2,000.00
 MAINTENANCE OF TEMPORARY SOUND BARRIER 0.24 5800LF$50.00$23.00 $133,400.00 $19.56$17.75
 NOISE MONITORING AND REPORTING 0.37 34MTH$8,000.00$6,000.00 $204,000.00 $5,293.75$5,525.00
 MECHANICAL WORK 0.03 1LS$10,000.00$15,000.00 $15,000.00 $38,788.75$35,000.00
 OVERHEAD HEIGHT CLEARANCE SIGN 0.01 2EA$250.00$1,400.00 $2,800.00 $1,157.50$1,000.00
 OBJECT MARKER PER CALTRANS STD. PLAN A73A 0.01 22EA$100.00$160.00 $3,520.00 $183.63$155.00
 PORTABLE SCALES 0.99 3EA$17,500.00$180,000.00 $540,000.00 $309,625.00$246,000.00
 PREPARATION OF THE REVERSE SIGNAL ALARM MITIGATION PLAN (STIPULATED UNIT PRICE OF $2,500) 0 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 PREPARATION OF THE NOISE ASSESSMENT REPORT (STIPULATED UNIT PRICE OF $15,000) 0.03 1LS$15,000.00$15,000.00 $15,000.00 $15,000.00$15,000.00
 PREPARATION OF THE NOISE MITIGATION PLAN (STIPULATED LUMP SUM PRICE OF $3,000) 0.01 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
 REINFORCED CONCRETE OUTLET STRUCTURE FOR EAST SETTLING BASIN 0.11 1LS$162,000.00$61,000.00 $61,000.00 $62,214.00$52,500.00
 REINFORCED CONCRETE OUTLET STRUCTURE FOR WEST SETTLING BASIN 0.11 1LS$179,000.00$62,000.00 $62,000.00 $62,509.00$52,500.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE EAST SETTLING BASIN 0.45 1LS$139,000.00$246,000.00 $246,000.00 $251,847.75$248,000.00
 REINFORCED CONCRETE ACCESS RAMP 0.47 160CY$930.00$1,600.00 $256,000.00 $1,227.88$1,271.50
 REINFORCED CONCRETE BASIN EAST 0.73 1LS$360,200.00$400,000.00 $400,000.00 $360,412.50$366,150.00
 REINFORCED CONCRETE BASIN WEST 0.73 1LS$360,200.00$400,000.00 $400,000.00 $352,537.50$366,150.00
 PREPARTION OF OIL PIPELINE REMOVAL PLAN (STIPULATED PRICE OF $5,000) 0.01 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 2 0.48 1LS$130,000.00$260,000.00 $260,000.00 $229,976.50$226,500.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 3 0.54 1LS$153,000.00$293,000.00 $293,000.00 $250,057.75$236,825.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 4 0.50 1LS$133,000.00$271,000.00 $271,000.00 $240,906.38$239,000.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 5 0.50 1LS$137,000.00$270,000.00 $270,000.00 $238,101.50$244,000.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 6 0.52 1LS$151,000.00$285,000.00 $285,000.00 $253,182.75$249,325.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE WEST SETTLING BASIN 0.51 1LS$140,000.00$280,000.00 $280,000.00 $254,004.00$252,500.00
 REINFORCED CONCRETE INTAKE CANAL 3.62 2190CY$920.00$900.00 $1,971,000.00 $913.13$842.50
 REINFORCED CONCRETE OUTLET STRUCTURE 1.22 7EA$57,900.00$95,000.00 $665,000.00 $81,524.25$79,097.00
 REMOVAL OF TEMPORARY SOUND BARRIER 0.07 5800LF$50.00$7.00 $40,600.00 $14.06$7.00
 REINFORCED CONCRETE WEIR STRUCTURE EAST 0.23 1LS$58,500.00$126,000.00 $126,000.00 $145,650.00$140,100.00
 REINFORCED CONCRETE WEIR STRUCTURE WEST 0.23 1LS$58,500.00$125,000.00 $125,000.00 $157,125.00$147,500.00
 REINFORCED CONCRETE OVERFLOW STRUCTURE NO. 1 0.54 1LS$153,000.00$295,000.00 $295,000.00 $253,145.25$246,675.00
 REMOVE AND RELOCATE EXISTING RIPRAP PER SH.12 0.08 2110CY$30.00$20.00 $42,200.00 $52.00$54.00
 REMOVAL OF EXISTING IMPROVEMENTS 0.09 1LS$43,000.00$50,000.00 $50,000.00 $140,715.63$60,500.00
 REMOVAL OF OIL PIPELINE 0.11 1LS$20,000.00$60,000.00 $60,000.00 $77,242.08$70,000.00
 STREET SWEEPING 1.88 682DAYS$1,400.00$1,500.00 $1,023,000.00 $1,284.38$1,337.50
 SPECIAL REQUIREMENTS 0.04 1LS$30,000.00$24,000.00 $24,000.00 $61,312.50$24,500.00
 SEDIMENT TRANSPORTATION PLAN 0.02 1LS$7,000.00$10,000.00 $10,000.00 $22,937.50$7,500.00
 STRUCTURE EXCAVATION (CONCRETE BASIN EAST) 0.04 650CY$55.00$31.00 $20,150.00 $71.56$70.50
 STRUCTURE EXCAVATION (CONCRETE BASIN WEST) 0.04 650CY$55.00$31.00 $20,150.00 $76.06$61.00
 STRUCTURE EXCAVATION (ACCESS RAMP) 0.04 432CY$55.00$50.00 $21,600.00 $60.31$61.00
 STRUCTURE EXCAVATION (BASIN DOWN DRAIN) 0.07 926CY$55.00$42.00 $38,892.00 $60.81$65.50
 STRUCTURE EXCAVATION (WEIR STRUCTURE WEST) 0.02 65CY$55.00$150.00 $9,750.00 $73.56$90.00
 STRUCTURE EXCAVATION (INTAKE CANAL) 0.12 3768CY$55.00$18.00 $67,824.00 $62.44$65.50
 STRUCTURE EXCAVATION (OUTFALL STRUCTURE FOR EAST SETTLING BASIN) 0.02 61CY$55.00$160.00 $9,760.00 $92.56$87.50
 STRUCTURE EXCAVATION (OUTFALL STRUCTURE FOR WEST SETTLING BASIN) 0.02 42CY$55.00$235.00 $9,870.00 $120.56$107.50
 2.5" FLUSHOUT HEAD, 200 PSI WWP, WITH HOSE ADAPTER 0.01 2EA$1,500.00$2,750.00 $5,500.00 $2,521.50$2,475.00
 18" X 18" CAST-IRON SLIDE GATE ASSEMBLY 0.03 2EA$10,000.00$9,300.00 $18,600.00 $16,662.50$17,250.00
 4" REDUCED PRESSURE PRINCIPLE ASSEMBLY FROM APPROVED USC FOUNDATION FOR CROSS-CONNECTION CONTROL LIST WITH 4' BY 8' STEEL ENCLOSURE 0.08 2EA$15,200.00$23,000.00 $46,000.00 $17,174.00$16,681.00
 4" STEEL STRUCTURAL SUPPORT PIPE 0.03 64LF$325.00$250.00 $16,000.00 $258.13$228.00
 4" GATE VALVE, FLG'D CL 125, 150 PSI WWP WITH HANDWHEEL 0 2EA$2,000.00$1,200.00 $2,400.00 $1,361.88$1,275.00
 4" GATE VALVE, FLG'D CL 125, 150 PSI WWP, NRS, W/ VALVE BOX PER LACWD STD PLAN W-15 0.01 2EA$1,800.00$2,800.00 $5,600.00 $2,343.88$2,000.00
 36" X 36" CAST-IRON SLIDE GATE ASSEMBLY 0.23 8EA$26,000.00$16,000.00 $128,000.00 $26,667.50$26,750.00
 72" X 48" FABRICATED STAINLESS STEEL SLIDE GATE ASSEMBLY 0.51 14EA$25,000.00$20,000.00 $280,000.00 $32,375.00$32,500.00
 54" X 54" CAST-IRON SLIDE GATE ASSEMBLY 0.17 4EA$35,000.00$23,000.00 $92,000.00 $35,150.00$35,000.00
 AC PAVEMENT (TEMPORARY ACCESS ROAD AND RAMP) 0.32 1500TON$80.00$115.00 $172,500.00 $128.75$119.50
 AC PAVEMENT (TEMPORARY ACCESS ROAD MAINTENANCE) 0.07 1500TON$100.00$25.00 $37,500.00 $99.25$107.50
 AUTOMATIC SLIDE GATE OPERATOR 0.21 4EA$3,000.00$28,000.00 $112,000.00 $26,701.25$27,555.00
 AGENCY EXCLUDES 2013 MODEL YEAR ENGINE TRUCK 0.04 2115914TON$2.00$0.01 $21,159.14 $0.10$0.01
 AGENCY EXCLUDES 2014 MODEL YEAR ENGINE TRUCK 0.04 2115914TON$1.00$0.01 $21,159.14 $0.10$0.01
 AGENCY EXCLUDES 2015 MODEL YEAR ENGINE TRUCK 0.04 2115914TON$0.50$0.01 $21,159.14 $0.11$0.01
 BEVEL GEAR OPERATOR 0.04 24EA$6,000.00$850.00 $20,400.00 $4,659.38$2,750.00
 BASIN DOWN DRAIN 0.31 2382LF$70.00$70.00 $166,740.00 $99.25$85.00
 CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $10,000) 0.02 10000AL$1.00$1.00 $10,000.00 $1.00$1.00
 CHANGABLE MESSAGE SIGN (DELETED) 0 1EA$0.01$0.00 $0.00 $0.00$0.00
 CHAIN LINK FENCE, 5' HIGH (INTAKE CANAL) 0.12 1403LF$75.00$48.00 $67,344.00 $46.88$48.00
 CONCRETE DOWN DRAIN INLET 0.17 30CY$500.00$3,000.00 $90,000.00 $3,159.13$3,250.00
 COLD MILL AC PAVEMENT (> 3") (DELETED) 0 1SF$0.01$0.00 $0.00 $0.00$0.00
 CONSTRUCTION OF TEMPORARY SOUND BARRIER 2.24 5800LF$300.00$210.00 $1,218,000.00 $182.00$175.00
 CONSTRUCT 2" COPPER WATER SERVICE LINE 0.07 1LS$66,000.00$40,000.00 $40,000.00 $45,951.25$40,000.00
 ELECTRIC MOTOR OPERATOR AND APPURTENANCES 0.34 24EA$6,000.00$7,800.00 $187,200.00 $7,581.25$6,750.00
 ELECTRICAL WORK 1.69 1LS$650,000.00$920,000.00 $920,000.00 $1,074,450.63$1,000,000.00
 DRIVEWAY PER STD PLAN S-440-4 0.01 192SF$16.00$35.00 $6,720.00 $46.38$42.50
 DISPOSAL OF LEAD CONTAINING PAINT WASTE 0.01 1LS$10,000.00$5,000.00 $5,000.00 $7,118.75$5,750.00
 EXPANDED METAL CAGE ENCLOSURE FOR WEIR 0.39 2EA$100,000.00$105,000.00 $210,000.00 $104,462.50$102,500.00
 EXCAVATION, TRANSPORTATION AND DISPOSAL OF DELINEATED SOIL 1.21 31268CY$22.50$21.00 $656,628.00 $26.32$24.50
 ELECTROMAGNETIC GATE LOCK 0.01 4EA$800.00$700.00 $2,800.00 $1,026.25$710.00
 FUGITIVE DUST CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) 0.01 3EA$2,500.00$2,500.00 $7,500.00 $2,500.00$2,500.00
 FABRICATED STEEL AIR GAP ADAPTOR 0.01 2EA$1,500.00$2,200.00 $4,400.00 $2,625.00$1,752.50
 EXCAVATION, TRANSPORTATION AND DISPOSAL OF EXCESS BASIN MATERIAL 36.99 1343403CY$22.50$15.00 $20,151,045.00 $21.39$21.50
 EXPANDED METAL CAGE ENCLOSURE FOR LOW FLOW AND CONCRETE LINED BASINS 0.17 3EA$25,000.00$30,000.00 $90,000.00 $30,832.25$30,000.00
 EXPANDED METAL CAGE ENCLOSURE FOR REINFORCED CONCRETE OVERFLOW STRUCTURE 0.37 8EA$18,750.00$25,000.00 $200,000.00 $27,714.75$27,500.00
 GAUGE BOARD 0.13 16EA$2,500.00$4,500.00 $72,000.00 $5,075.00$3,250.00
 GALVANIZED STEEL SLIDE GATE-6 FEET HIGH 0.43 8EA$6,250.00$29,000.00 $232,000.00 $28,475.00$28,750.00
 GALVANIZED STEEL DOUBLE SWING GATE-6-FEET HIGH, 16-FEET LONG 0.07 2EA$10,000.00$19,000.00 $38,000.00 $17,200.00$18,250.00
 GALVANIZED STEEL PICKET FENCE-6 FEET HIGH 4.43 13258LF$150.00$182.00 $2,412,956.00 $197.00$183.00
 Total Percent100   Total Amount$54,483,460.00