Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) |
0.18
| 1 | LS | $2,000.00 | $2,000.00 |
$2,000.00
| $2,000.00 | $2,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.14
| 3 | MTH | $500.00 | $500.00 |
$1,500.00
| $500.00 | $500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.09
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.06.011 | IMPLEMENTATION OF THE LTWHP |
1.81
| 1 | LS | $10,000.00 | $20,000.00 |
$20,000.00
| $22,703.00 | $20,000.00 |
001.07.004 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $7,000) |
0.64
| 1 | LS | $7,000.00 | $7,000.00 |
$7,000.00
| $7,000.00 | $7,000.00 |
001.07.007 | IMPLEMENTATION OF THE SWPPP |
1.81
| 1 | LS | $15,000.00 | $20,000.00 |
$20,000.00
| $25,658.20 | $20,000.00 |
001.08.005 | OFFICE FACILITIES |
2.18
| 4 | MTH | $5,000.00 | $6,000.00 |
$24,000.00
| $5,161.20 | $2,800.00 |
001.09.003 | MOBILIZATION |
4.54
| 1 | LS | $53,000.00 | $50,000.00 |
$50,000.00
| $98,800.00 | $128,000.00 |
300.01.003 | CLEARING AND GRUBBING |
0.45
| 1 | LS | $10,000.00 | $5,000.00 |
$5,000.00
| $58,678.00 | $71,440.00 |
300.01.013 | TREE REMOVAL (6"-12" DIAMETER) |
0.34
| 5 | EA | $500.00 | $750.00 |
$3,750.00
| $1,040.00 | $750.00 |
300.01.014 | TREE REMOVAL (13"-24" DIAMETER) |
1.09
| 10 | EA | $800.00 | $1,200.00 |
$12,000.00
| $1,570.00 | $1,200.00 |
300.01.015 | TREE REMOVAL (25"+ DIAMETER) |
0.36
| 2 | EA | $1,000.00 | $2,000.00 |
$4,000.00
| $2,330.00 | $2,100.00 |
300.01.057 | REMOVE EXISTING CHAIN LINK FENCE |
0.13
| 70 | LF | $50.00 | $20.00 |
$1,400.00
| $20.30 | $20.00 |
300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
0.05
| 1 | CY | $1,000.00 | $500.00 |
$500.00
| $754.00 | $780.00 |
300.02.003 | UNCLASSIFIED EXCAVATION |
15.16
| 2571 | CY | $100.00 | $65.00 |
$167,115.00
| $62.90 | $65.00 |
301.02.005 | CRUSHED MISCELLANEOUS BASE |
1.44
| 318 | CY | $120.00 | $50.00 |
$15,900.00
| $69.86 | $58.31 |
301.03.005 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
0.09
| 5 | CY | $1,000.00 | $200.00 |
$1,000.00
| $322.20 | $300.00 |
302.05.014 | AC PAVEMENT(PATCH BACK) |
0.15
| 8 | TON | $200.00 | $200.00 |
$1,600.00
| $296.00 | $260.00 |
302.06.003 | PCC PAVEMENT |
11.60
| 284 | CY | $400.00 | $450.00 |
$127,800.00
| $482.40 | $407.00 |
303.01.613 | CONCRETE SLOUGH WALL |
3.81
| 84 | CY | $400.00 | $500.00 |
$42,000.00
| $916.60 | $600.00 |
303.05.003 | PCC CURB, TYPE A1-6 |
0.06
| 15 | LF | $50.00 | $45.00 |
$675.00
| $46.17 | $45.00 |
303.05.005 | PCC CURB, TYPE A1-VAR |
0.44
| 88 | LF | $50.00 | $55.00 |
$4,840.00
| $48.59 | $50.00 |
303.05.007 | PCC CURB, TYPE A1-4 |
0.03
| 9 | LF | $45.00 | $40.00 |
$360.00
| $45.48 | $45.38 |
303.05.007 | PCC CURB, TYPE A1-1 |
0.08
| 23 | LF | $40.00 | $40.00 |
$920.00
| $36.43 | $40.00 |
303.05.007 | PCC CURB, TYPE A1-9 |
0.03
| 6 | LF | $55.00 | $50.00 |
$300.00
| $59.01 | $52.00 |
303.05.007 | PCC CURB, TYPE A1-0 |
0.12
| 32 | LF | $40.00 | $40.00 |
$1,280.00
| $35.50 | $40.00 |
303.05.043 | PCC WALK, 4" THICK |
0.95
| 1309 | SF | $10.00 | $8.00 |
$10,472.00
| $9.41 | $8.00 |
303.05.050 | PCC CURB RAMPS |
0.07
| 1 | CY | $400.00 | $750.00 |
$750.00
| $2,048.80 | $1,250.00 |
303.05.055 | PCC DRIVEWAYS, 6" THICK |
0.24
| 178 | SF | $15.00 | $15.00 |
$2,670.00
| $16.93 | $15.00 |
303.05.059 | DETECTABLE WARNING SURFACE |
0.07
| 18 | SF | $125.00 | $40.00 |
$720.00
| $105.20 | $53.00 |
304.06.003 | REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) |
0.05
| 12 | LF | $60.00 | $50.00 |
$600.00
| $66.45 | $50.00 |
306.01.107 | 4' - 0" W X 2' - 0" H RCB |
0.07
| 8 | LF | $750.00 | $100.00 |
$800.00
| $1,103.00 | $450.00 |
801.04.021 | LANDSCAPING |
4.54
| 1 | LS | $106,000.00 | $50,000.00 |
$50,000.00
| $98,086.60 | $86,000.00 |
801.05.003 | IRRIGATION SYSTEM |
5.44
| 1 | LS | $84,000.00 | $60,000.00 |
$60,000.00
| $108,369.60 | $72,626.00 |
801.06.003 | PLANT ESTABLISHMENT PERIOD |
0.54
| 1 | LS | $5,000.00 | $6,000.00 |
$6,000.00
| $5,301.60 | $5,000.00 |
| SIGNAGE KIOSK |
0.68
| 1 | EA | $5,500.00 | $7,500.00 |
$7,500.00
| $8,601.00 | $7,500.00 |
| ARENA SAND SURFACING |
1.65
| 9118 | SF | $15.00 | $2.00 |
$18,236.00
| $2.78 | $3.16 |
| RIVER ROCK COBBLE |
0.27
| 99 | SF | $40.00 | $30.00 |
$2,970.00
| $27.42 | $30.00 |
| STABILIZED DECOMPOSED GRANITE 4" |
1.35
| 3721 | SF | $5.00 | $4.00 |
$14,884.00
| $3.60 | $3.00 |
| TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
0.27
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $5,303.40 | $3,000.00 |
| AUTOMATIC HORSE WATERER |
0.54
| 1 | EA | $600.00 | $6,000.00 |
$6,000.00
| $4,786.80 | $3,900.00 |
| 6" RAISED CERAMIC MARKERS |
0.28
| 103 | EA | $7.00 | $30.00 |
$3,090.00
| $34.60 | $33.00 |
| REMOVE EXISTING PIPE GATE |
0.03
| 1 | EA | $400.00 | $350.00 |
$350.00
| $826.00 | $780.00 |
| REMOVE AND DISPOSE OF EXISTING STAIRWAY |
0.09
| 1 | LS | $10,000.00 | $1,000.00 |
$1,000.00
| $2,112.00 | $2,000.00 |
| REGULATORY SIGN |
0.45
| 2 | EA | $1,600.00 | $2,500.00 |
$5,000.00
| $3,183.40 | $2,500.00 |
| AGRONOMIC SOIL REPORT |
0.11
| 5 | EA | $600.00 | $250.00 |
$1,250.00
| $756.00 | $500.00 |
| PCC CURB, TYPE C1-4 (MOD) |
0.03
| 8 | LF | $75.00 | $40.00 |
$320.00
| $43.40 | $40.00 |
| PCC CURB & GUTTER, TYPE A2-9 (MOD) |
0.31
| 53 | LF | $75.00 | $65.00 |
$3,445.00
| $91.77 | $65.00 |
| CONCRETE POST AND RAIL FENCE |
11.70
| 1843 | LF | $250.00 | $70.00 |
$129,010.00
| $74.78 | $75.00 |
| PCC CURB, TYPE A1-9 (MOD) |
0.08
| 18 | LF | $70.00 | $50.00 |
$900.00
| $59.31 | $52.00 |
| CLASS D BIOSWALE SOIL |
1.69
| 186 | CY | $60.00 | $100.00 |
$18,600.00
| $125.67 | $115.00 |
| MOUNTING BLOCK |
0.23
| 1 | EA | $600.00 | $2,500.00 |
$2,500.00
| $3,195.60 | $2,500.00 |
| CONCRETE BENCH |
0.45
| 2 | EA | $650.00 | $2,500.00 |
$5,000.00
| $4,949.60 | $2,600.00 |
| INTERPRETIVE SIGN |
0.64
| 2 | EA | $3,000.00 | $3,500.00 |
$7,000.00
| $3,681.00 | $3,500.00 |
| COMMUNITY RELATIONS (ALLOWANCE OF $100,000) |
9.07
| 100000 | AL | $1.00 | $1.00 |
$100,000.00
| $1.00 | $1.00 |
| HITCHING POST |
0.45
| 2 | EA | $900.00 | $2,500.00 |
$5,000.00
| $2,103.40 | $2,500.00 |
| GALVANIZED PIPE RAIL FENCE & GATES |
4.35
| 1 | LS | $30,000.00 | $48,000.00 |
$48,000.00
| $51,532.20 | $50,000.00 |
| ELECTRICAL WORK |
3.18
| 1 | LS | $59,279.00 | $35,000.00 |
$35,000.00
| $74,280.00 | $53,400.00 |
| DOUBLE PIPE GATE PER STD PLAN 602, W=32' |
1.13
| 1 | EA | $16,000.00 | $12,500.00 |
$12,500.00
| $20,975.00 | $13,000.00 |
| DOUBLE PIPE GATE PER STD PLAN 602, W=29' |
1.09
| 1 | EA | $15,000.00 | $12,000.00 |
$12,000.00
| $19,138.00 | $12,000.00 |
| DRINKING FOUNTAIN |
0.68
| 1 | EA | $2,500.00 | $7,500.00 |
$7,500.00
| $10,825.00 | $8,925.00 |
| CONCRETE WASTE CONTAINER |
0.36
| 2 | EA | $800.00 | $2,000.00 |
$4,000.00
| $3,752.80 | $2,000.00 |
| PCC CURB TRANSITION |
0.02
| 4 | LF | $85.00 | $45.00 |
$180.00
| $53.96 | $50.00 |
| Total Percent | 100 | | | | Total Amount | $1,102,187.00 | | |