Bid Price History

Kenter Canyon Drain Connector Pipe Replacement
$104,810.00
10/30/2018
631 (G7)
4
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.07.003IMPLEMENTATION OF BMPS 0.48 1LS$8,000.00$500.00 $500.00 $3,580.75$2,811.50
001.07.009RESTORATION OF EXISTING IMPROVEMENTS 2.39 1LS$10,000.00$2,500.00 $2,500.00 $10,247.75$4,245.50
001.07.021SHORING OF OPEN EXCAVATIONS 2.39 1LS$15,000.00$2,500.00 $2,500.00 $11,130.00$3,510.00
303.01.329PIPE CONNECTION PER STD PLAN 335, CASE 3 2.86 3EA$5,000.00$1,000.00 $3,000.00 $2,942.00$3,134.00
306.01.12912" RCP, 2250 D 72.51 38LF$500.00$2,000.00 $76,000.00 $1,268.00$1,336.00
306.01.379CONCRETE COLLAR FOR CONNECTOR PIPE 1.91 2EA$2,000.00$1,000.00 $2,000.00 $1,560.00$1,370.00
306.01.503RESTORATION OF PERMANENT SURFACING 9.84 1LS$7,500.00$10,310.00 $10,310.00 $16,839.25$17,750.00
601.09.011TRAFFIC CONTROL 2.86 1LS$25,000.00$3,000.00 $3,000.00 $12,900.00$14,300.00
601.09.017FLASHING ARROW SIGN 1.91 2EA$5,000.00$1,000.00 $2,000.00 $1,767.50$860.00
 CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $1,000) 0.95 1000AL$1.00$1.00 $1,000.00 $1.00$1.00
 REMOVE CATCH BASIN SEAL 1.91 2EA$750.00$1,000.00 $2,000.00 $1,202.50$950.00
 Total Percent100   Total Amount$104,810.00