Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) |
0.04
| 1 | LS | $2,000.00 | $2,000.00 |
$2,000.00
| $2,000.00 | $2,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.07
| 6 | MTH | $500.00 | $500.00 |
$3,000.00
| $857.14 | $500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.02
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.07.004 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) |
0.11
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
001.07.007 | IMPLEMENTATION OF THE SWPPP |
0.33
| 1 | LS | $10,000.00 | $15,000.00 |
$15,000.00
| $20,785.86 | $20,000.00 |
001.08.003 | OFFICE FACILITIES |
1.09
| 1 | LS | $30,000.00 | $50,000.00 |
$50,000.00
| $21,500.14 | $15,000.00 |
001.09.003 | MOBILIZATION |
5.43
| 1 | LS | $85,000.00 | $250,000.00 |
$250,000.00
| $295,113.37 | $305,702.81 |
300.01.003 | CLEARING AND GRUBBING |
2.93
| 1 | LS | $10,000.00 | $135,000.00 |
$135,000.00
| $57,714.43 | $35,000.00 |
300.01.005 | ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) |
0.20
| 25 | EA | $750.00 | $375.00 |
$9,375.00
| $995.72 | $865.00 |
300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
0.99
| 756 | CY | $200.00 | $60.00 |
$45,360.00
| $146.29 | $140.00 |
300.02.003 | UNCLASSIFIED EXCAVATION |
3.64
| 3350 | CY | $50.00 | $50.00 |
$167,500.00
| $67.71 | $60.00 |
301.02.005 | CRUSHED MISCELLANEOUS BASE |
0.53
| 692 | CY | $75.00 | $35.00 |
$24,220.00
| $78.86 | $70.00 |
301.03.005 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
0.01
| 3 | CY | $300.00 | $150.00 |
$450.00
| $575.72 | $400.00 |
301.03.011 | CEMENT STABILIZED PULVERIZED BASE, 8" THICK |
8.17
| 83518 | SY | $4.50 | $4.50 |
$375,831.00
| $4.58 | $4.80 |
301.03.013 | PORTLAND CEMENT FOR CSPB |
4.95
| 1627 | TON | $139.00 | $140.00 |
$227,780.00
| $147.27 | $140.00 |
301.03.015 | PRIME/TACK COAT FOR CSPB |
0.95
| 12522 | GAL | $3.00 | $3.50 |
$43,827.00
| $9.21 | $3.00 |
302.01.005 | COLD MILL AC PAVEMENT (0 - 1-1/2") |
0.40
| 123365 | SF | $0.25 | $0.15 |
$18,504.75
| $0.20 | $0.20 |
302.01.007 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
3.71
| 681866 | SF | $0.30 | $0.25 |
$170,466.50
| $0.27 | $0.22 |
302.05.014 | AC PAVEMENT(PATCH BACK) |
0.03
| 3 | TON | $150.00 | $500.00 |
$1,500.00
| $748.57 | $800.00 |
302.05.023 | RECONSTRUCT MANHOLE |
1.27
| 73 | EA | $1,400.00 | $800.00 |
$58,400.00
| $1,540.02 | $1,580.00 |
302.05.025 | DOUBLE ADJUST MANHOLE |
0.07
| 6 | EA | $500.00 | $500.00 |
$3,000.00
| $828.58 | $850.00 |
302.09.003 | ASPHALT RUBBER HOT MIX |
11.21
| 6610 | TON | $85.00 | $78.00 |
$515,580.00
| $81.14 | $80.00 |
302.09.005 | ASPHALT RUBBER HOT MIX (TEST STRIP) |
0.98
| 500 | TON | $100.00 | $90.00 |
$45,000.00
| $89.14 | $90.00 |
302.15.007 | EMULSIFIED RECYCLING AGENT |
6.85
| 450 | TON | $450.00 | $700.00 |
$315,000.00
| $564.29 | $525.00 |
303.01.613 | CONCRETE SLOUGH WALL |
0.09
| 4 | CY | $1,500.00 | $1,000.00 |
$4,000.00
| $2,192.87 | $1,750.00 |
303.05.009 | PCC CURB & GUTTER, TYPE A2-6 |
0.04
| 61 | LF | $25.00 | $27.00 |
$1,647.00
| $33.79 | $30.00 |
303.05.010 | PCC CURB & GUTTER, TYPE A2-8 |
2.83
| 4654 | LF | $25.00 | $28.00 |
$130,312.00
| $31.64 | $30.00 |
303.05.011 | PCC CURB & GUTTER, TYPE A2-VAR |
0.25
| 408 | LF | $25.00 | $28.00 |
$11,424.00
| $32.21 | $30.00 |
303.05.047 | PCC WALK & DRIVEWAYS, 4" THICK |
0.81
| 9332 | SF | $5.00 | $4.00 |
$37,328.00
| $7.34 | $5.50 |
303.05.050 | PCC CURB RAMPS |
0.37
| 28 | CY | $700.00 | $600.00 |
$16,800.00
| $1,004.30 | $1,000.00 |
303.05.059 | DETECTABLE WARNING SURFACE |
0.24
| 560 | SF | $36.00 | $20.00 |
$11,200.00
| $33.29 | $30.00 |
303.05.061 | CROSS GUTTER |
4.76
| 365 | CY | $500.00 | $600.00 |
$219,000.00
| $357.00 | $400.00 |
303.08.067 | PERVIOUS CONCRETE, 6" THICK |
3.26
| 29976 | SF | $7.00 | $5.00 |
$149,880.00
| $9.11 | $7.00 |
304.02.007 | METAL HAND RAILINGS PER STD PLAN 606 |
0.15
| 69 | LF | $150.00 | $100.00 |
$6,900.00
| $184.86 | $189.01 |
307.02.049 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
0.23
| 1500 | LF | $9.00 | $7.00 |
$10,500.00
| $7.90 | $7.00 |
312.01.017 | INSTALL FIRE HYDRANT LOCATION RPM |
0.01
| 10 | EA | $10.00 | $25.00 |
$250.00
| $33.43 | $28.00 |
601.09.011 | TRAFFIC CONTROL |
5.65
| 1 | LS | $50,000.00 | $260,000.00 |
$260,000.00
| $126,714.57 | $120,000.00 |
601.09.017 | FLASHING ARROW SIGN |
0.17
| 2 | EA | $5,000.00 | $4,000.00 |
$8,000.00
| $3,585.75 | $4,000.00 |
801.04.021 | LANDSCAPING |
1.26
| 1 | LS | $40,828.00 | $58,000.00 |
$58,000.00
| $47,278.86 | $50,000.00 |
801.05.003 | IRRIGATION SYSTEM |
3.04
| 1 | LS | $128,268.00 | $140,000.00 |
$140,000.00
| $140,229.29 | $140,000.00 |
801.06.003 | PLANT ESTABLISHMENT PERIOD |
0.35
| 1 | LS | $7,490.00 | $16,000.00 |
$16,000.00
| $6,714.29 | $5,000.00 |
| LID-B, INFILTRATION UNIT |
0.07
| 2 | EA | $3,922.00 | $1,600.00 |
$3,200.00
| $10,934.34 | $12,000.00 |
| NO. 3 CONCRETE AGGREGATE |
1.03
| 555 | CY | $80.00 | $85.00 |
$47,175.00
| $92.71 | $85.00 |
| RIVER ROCK PAVING, 6" THICK |
2.69
| 19031 | SF | $10.00 | $6.50 |
$123,701.50
| $11.24 | $10.00 |
| CITY PERMITS AND INSPECTION FEES (ALLOWANCE OF $15,000) |
0.33
| 15000 | AL | $1.00 | $1.00 |
$15,000.00
| $1.00 | $1.00 |
| UNCLASSIFIED EXCAVATION (ROADWAY) |
6.31
| 7256 | CY | $50.00 | $40.00 |
$290,240.00
| $64.29 | $50.00 |
| COLD CENTRAL PLANT RECYCLED ASPHALT CONCRETE PAVEMENT (CCPRACP), 3" THICK |
10.89
| 83518 | SY | $6.00 | $6.00 |
$501,108.00
| $7.39 | $6.00 |
| LID-A, BIO-SWALE |
0.33
| 38 | EA | $9,673.00 | $400.00 |
$15,200.00
| $14,138.65 | $14,070.56 |
| IMPORT RECLAIMED ASPHALT PAVEMENT (RAP) |
0.74
| 3400 | TON | $70.00 | $10.00 |
$34,000.00
| $9.58 | $10.00 |
| AGRONOMIC SOIL REPORTS |
0.14
| 5 | EA | $400.00 | $1,300.00 |
$6,500.00
| $479.86 | $259.01 |
| Total Percent | 100 | | | | Total Amount | $4,600,159.75 | | |