Bid Price History

The Old Rd over Castaic Creek 53C-1403
$4,610,280.00
10/06/2026
4459 (H5)
7
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.002CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) 0.05 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
001.06.003CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.05 5MTH$500.00$500.00 $2,500.00 $500.00$500.00
001.06.007CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.02 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.06.011IMPLEMENTATION OF THE LTWHP 0.59 1LS$10,000.00$27,000.00 $27,000.00 $44,892.86$35,000.00
001.07.021SHORING OF OPEN EXCAVATIONS 8.03 1LS$30,000.00$370,000.00 $370,000.00 $277,857.14$300,000.00
001.08.005OFFICE FACILITIES 0.65 6MTH$8,000.00$5,000.00 $30,000.00 $11,308.57$11,000.00
001.09.003MOBILIZATION 8.68 1LS$320,000.00$400,000.00 $400,000.00 $563,101.71$600,000.00
300.01.003CLEARING AND GRUBBING 0.87 1LS$29,000.00$40,000.00 $40,000.00 $135,571.43$59,000.00
300.04.007STRUCTURE EXCAVATION (BRIDGE) 1.55 840CY$130.00$85.00 $71,400.00 $242.43$275.00
300.04.027STRUCTURE BACKFILL (BRIDGE) 1.17 540CY$250.00$100.00 $54,000.00 $291.29$300.00
303.01.006STRUCTURE CONCRETE (BRIDGE) 12.63 353CY$2,200.00$1,650.00 $582,450.00 $3,488.00$3,776.00
303.01.011STRUCTURE CONCRETE (FOOTING) 4.18 175CY$1,000.00$1,100.00 $192,500.00 $1,434.43$1,311.00
303.01.042BAR REINFORCING STEEL (BRIDGE) 9.32 171870LB$3.20$2.50 $429,675.00 $2.64$2.50
303.01.115DRILL AND BOND DOWEL (EPOXY CARTRIDGE) 1.33 1225LF$60.00$50.00 $61,250.00 $90.86$95.00
 REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (GIRDER) 0.23 350SF$150.00$30.00 $10,500.00 $262.29$182.00
 REMOVE UNSOUND CONCRETE, MAX 4" DEPTH (BARRIER) 0.08 75SF$240.00$50.00 $3,750.00 $178.43$182.00
 REPAIR SPALLED CONCRETE (BARRIER) 0.24 75SF$240.00$150.00 $11,250.00 $216.43$175.00
 REPAIR SPALLED CONCRETE (GIRDER) 0.46 350SF$150.00$60.00 $21,000.00 $223.57$175.00
 REMOVAL OF ESA FENCING 0.04 1LS$2,500.00$2,000.00 $2,000.00 $5,362.43$5,500.00
 PREPARATION OF THE SPILL PREVENTION AND CONTROL PLAN (STIPULATED UNIT PRICE OF $2,500) 0.05 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 PREPARATION OF THE WPCP (STIPULATED UNIT PRICE OF $2,500) 0.05 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 PREPARATION OF SURFACE WATER DIVERSION PLAN (STIPULATED UNIT PRICE OF $5,000) 0.11 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
 PREPARATION OF THE DEWATERING PLAN (STIPULATED UNIT PRICE OF $5,000) 0.11 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
 PREPARATION OF THE MONITORING WELL DECOMMISSIONING PLAN (STIPULATED UNIT PRICE OF $2,500) 0.05 1LS$2,500.00$2,500.00 $2,500.00 $2,500.00$2,500.00
 MICROPILES 42.17 54EA$12,500.00$36,000.00 $1,944,000.00 $36,853.86$40,000.00
 INSTALLATION OF ESA FENCING 0.25 1650LF$5.00$7.00 $11,550.00 $11.10$10.00
 MAINTENANCE OF ESA FENCING 0.10 1650LF$2.00$2.70 $4,455.00 $6.11$3.00
 IMPLEMENTATION OF THE DEWATERING PLAN 2.69 1LS$300,000.00$124,000.00 $124,000.00 $480,048.57$400,000.00
 IMPLEMENTATION OF THE MONITORING WELL DECOMMISSIONING PLAN 0.41 2EA$60,000.00$9,500.00 $19,000.00 $28,024.29$20,000.00
 IMPLEMENTATION OF THE WPCP 1.13 1LS$20,000.00$52,000.00 $52,000.00 $148,207.14$60,000.00
 IMPLEMENTATION OF SURFACE WATER DIVERSION PLAN 1.63 1LS$70,000.00$75,000.00 $75,000.00 $168,308.57$123,160.00
 CONSTRUCTION DEWATERING MONITORING AND REPORTING 0.65 6MTH$5,000.00$5,000.00 $30,000.00 $5,081.29$5,000.00
 UTILITY PROTECTION IN PLACE 0.43 1LS$30,000.00$20,000.00 $20,000.00 $39,842.86$40,000.00
 Total Percent100   Total Amount$4,610,280.00