Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) |
0.04
| 1 | LS | $2,000.00 | $2,000.00 |
$2,000.00
| $2,000.00 | $2,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.13
| 12 | MTH | $500.00 | $500.00 |
$6,000.00
| $500.00 | $500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.02
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.53
| 1 | LS | $25,000.00 | $25,000.00 |
$25,000.00
| $43,000.00 | $20,000.00 |
001.07.007 | IMPLEMENTATION OF THE SWPPP |
0.42
| 1 | LS | $100,000.00 | $20,000.00 |
$20,000.00
| $21,375.00 | $20,000.00 |
001.07.021 | SHORING OF OPEN EXCAVATIONS |
0.07
| 0.333330 | LS | $59,000.00 | $10,000.00 |
$3,333.33
| $7,325.00 | $8,000.00 |
001.08.005 | OFFICE FACILITIES |
0.69
| 13 | MTH | $6,000.00 | $2,500.00 |
$32,500.00
| $2,937.50 | $3,125.00 |
001.09.003 | MOBILIZATION |
4.22
| 1 | LS | $720,000.00 | $200,000.00 |
$200,000.00
| $304,507.94 | $285,890.87 |
300.01.003 | CLEARING AND GRUBBING |
1.90
| 1 | LS | $103,000.00 | $90,000.00 |
$90,000.00
| $103,250.00 | $90,000.00 |
300.01.005 | ROOT PRUNE TREE (INCL ROOT CONTROL BARRIER) |
0.17
| 8 | EA | $450.00 | $1,000.00 |
$8,000.00
| $777.50 | $730.00 |
300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
1.33
| 395 | CY | $212.00 | $160.00 |
$63,200.00
| $176.25 | $175.00 |
300.01.067 | CONCRETE REMOVAL (REINFORCED) |
0.12
| 32 | CY | $239.00 | $175.00 |
$5,600.00
| $240.00 | $212.50 |
300.02.003 | UNCLASSIFIED EXCAVATION |
3.94
| 1903 | CY | $73.00 | $98.00 |
$186,494.00
| $68.75 | $69.00 |
301.02.003 | CRUSHED AGGREGATE BASE |
0.23
| 242 | CY | $59.00 | $45.00 |
$10,890.00
| $110.00 | $122.50 |
301.02.005 | CRUSHED MISCELLANEOUS BASE |
0.87
| 2063 | CY | $61.00 | $20.00 |
$41,260.00
| $42.75 | $49.50 |
301.03.003 | TRENCH BACKFILL SLURRY (CLASS 100-E-100) |
0.72
| 85 | CY | $250.00 | $400.00 |
$34,000.00
| $239.75 | $196.00 |
301.03.005 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
0.20
| 37 | CY | $265.00 | $260.00 |
$9,620.00
| $214.50 | $211.50 |
302.01.009 | COLD MILL AC PAVEMENT (> 3") |
10.09
| 713350 | SF | $0.84 | $0.67 |
$477,944.50
| $0.64 | $0.69 |
302.01.013 | GRIND PCC PAVEMENT |
0.02
| 20 | SF | $10.00 | $50.00 |
$1,000.00
| $71.25 | $67.50 |
302.05.013 | AC PAVEMENT |
17.06
| 11384 | TON | $102.00 | $71.00 |
$808,264.00
| $72.25 | $70.50 |
302.05.014 | AC PAVEMENT(PATCH BACK) |
0.60
| 52 | TON | $275.00 | $550.00 |
$28,600.00
| $293.50 | $229.50 |
302.05.023 | RECONSTRUCT MANHOLE |
0.79
| 15 | EA | $7,000.00 | $2,500.00 |
$37,500.00
| $1,981.25 | $2,112.50 |
302.06.003 | PCC PAVEMENT |
0.93
| 126 | CY | $220.00 | $350.00 |
$44,100.00
| $397.50 | $350.00 |
302.09.003 | ASPHALT RUBBER HOT MIX |
14.75
| 8420 | TON | $106.00 | $83.00 |
$698,860.00
| $88.50 | $85.50 |
302.09.005 | ASPHALT RUBBER HOT MIX (TEST STRIP) |
1.06
| 500 | TON | $170.00 | $100.00 |
$50,000.00
| $109.50 | $112.50 |
303.01.113 | DRILL AND BOND DOWEL |
0.08
| 534 | LF | $100.00 | $7.00 |
$3,738.00
| $12.25 | $11.00 |
303.01.307 | CATCH BASIN PER STD PLAN 300, W=3.5 |
0.51
| 2 | EA | $13,800.00 | $12,000.00 |
$24,000.00
| $7,800.00 | $6,600.00 |
303.01.346 | MANHOLE PER STD PLAN 320 |
0.63
| 2 | EA | $12,300.00 | $15,000.00 |
$30,000.00
| $10,075.00 | $8,750.00 |
303.01.347 | MANHOLE PER STD PLAN 321 |
0.30
| 1 | EA | $12,300.00 | $14,000.00 |
$14,000.00
| $9,300.00 | $8,000.00 |
303.05.003 | PCC CURB, TYPE A1-6 |
0
| 2 | LF | $109.00 | $75.00 |
$150.00
| $70.25 | $59.00 |
303.05.005 | PCC CURB, TYPE A1-VAR |
0.10
| 124 | LF | $62.00 | $38.00 |
$4,712.00
| $35.63 | $37.50 |
303.05.009 | PCC CURB & GUTTER, TYPE A2-6 |
1.45
| 1802 | LF | $50.00 | $38.00 |
$68,476.00
| $38.00 | $37.50 |
303.05.010 | PCC CURB & GUTTER, TYPE A2-8 |
0.12
| 148 | LF | $65.00 | $40.00 |
$5,920.00
| $40.50 | $42.00 |
303.05.011 | PCC CURB & GUTTER, TYPE A2-VAR |
0.42
| 492 | LF | $55.00 | $40.00 |
$19,680.00
| $40.75 | $41.00 |
303.05.015 | PCC CURB & GUTTER, TYPE A3-6 |
0.03
| 36 | LF | $100.00 | $43.00 |
$1,548.00
| $47.50 | $49.00 |
303.05.043 | PCC WALK, 4" THICK |
0.79
| 2498 | SF | $12.00 | $15.00 |
$37,470.00
| $9.61 | $8.13 |
303.05.050 | PCC CURB RAMPS |
1.18
| 40 | CY | $800.00 | $1,400.00 |
$56,000.00
| $1,020.00 | $940.00 |
303.05.059 | DETECTABLE WARNING SURFACE |
0.10
| 307 | SF | $5.00 | $15.00 |
$4,605.00
| $37.50 | $35.00 |
303.05.061 | CROSS GUTTER |
0.15
| 13 | CY | $300.00 | $550.00 |
$7,150.00
| $528.75 | $535.00 |
306.01.129 | 18" RCP, 2500 D |
0.53
| 50 | LF | $400.00 | $500.00 |
$25,000.00
| $688.75 | $677.50 |
307.02.021 | 3" CONDUIT (SCH 80 PVC) |
0.92
| 795 | LF | $20.00 | $55.00 |
$43,725.00
| $55.35 | $55.20 |
307.02.039 | 5-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
0.03
| 356 | LF | $5.00 | $4.00 |
$1,424.00
| $3.84 | $3.85 |
307.02.039 | 3-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
0.10
| 1538 | LF | $3.00 | $3.00 |
$4,614.00
| $3.04 | $3.03 |
307.02.039 | 12-CONDUCTOR SIGNAL CABLE(EXCLUDING CONDUIT) |
0.39
| 3070 | LF | $12.00 | $6.00 |
$18,420.00
| $5.80 | $5.83 |
307.02.045 | NO. 6 PULL BOX INCL PCC COVER |
0.04
| 2 | EA | $1,805.00 | $1,000.00 |
$2,000.00
| $947.50 | $935.00 |
307.02.049 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
0.45
| 1775 | LF | $35.23 | $12.00 |
$21,300.00
| $14.38 | $15.00 |
307.04.317 | TYPE 2070 CONTROLLER |
0.13
| 1 | EA | $30,917.00 | $6,000.00 |
$6,000.00
| $6,137.50 | $6,050.00 |
307.04.349 | GPS UTB UNIT AND ANTENNA |
0.04
| 1 | EA | $1,497.00 | $2,000.00 |
$2,000.00
| $2,016.25 | $2,007.50 |
307.04.359 | SWITCH PACK |
0.02
| 9 | EA | $42.00 | $100.00 |
$900.00
| $70.50 | $61.00 |
307.04.363 | PED ISOLATION MODULE |
0
| 2 | EA | $63.50 | $100.00 |
$200.00
| $85.65 | $81.29 |
307.04.417 | TYPE 332 CABINET |
0.25
| 1 | EA | $11,811.00 | $12,000.00 |
$12,000.00
| $11,825.00 | $11,900.00 |
307.04.421 | TYPE 332 CABINET FOUNDATION |
0.03
| 1 | EA | $1,086.00 | $1,500.00 |
$1,500.00
| $1,530.00 | $1,510.00 |
307.04.469 | TYPE III-BF SERVICE CABINET |
0.17
| 1 | EA | $3,188.00 | $8,000.00 |
$8,000.00
| $8,065.00 | $8,030.00 |
307.04.473 | TYPE III-B SERVICE CABINET FOUNDATION |
0.03
| 1 | EA | $1,085.00 | $1,500.00 |
$1,500.00
| $1,530.00 | $1,510.00 |
307.04.501 | TYPE 1 STANDARD |
0.09
| 2 | EA | $794.00 | $2,200.00 |
$4,400.00
| $2,195.00 | $2,200.00 |
307.04.501 | TYPE 29 STANDARD |
0.63
| 2 | EA | $6,675.00 | $15,000.00 |
$30,000.00
| $14,200.00 | $14,000.00 |
307.04.501 | TYPE 17 STANDARD |
0.19
| 1 | EA | $4,981.00 | $9,000.00 |
$9,000.00
| $9,062.50 | $9,025.00 |
307.04.501 | TYPE 15 STANDARD |
0.70
| 6 | EA | $2,476.00 | $5,500.00 |
$33,000.00
| $5,385.00 | $5,370.00 |
307.04.503 | TYPE 29 STANDARD FOUNDATION |
0.25
| 2 | EA | $4,813.00 | $6,000.00 |
$12,000.00
| $5,612.50 | $5,525.00 |
307.04.503 | TYPE 15 STANDARD FOUNDATION |
0.32
| 6 | EA | $3,659.00 | $2,500.00 |
$15,000.00
| $2,442.50 | $2,435.00 |
307.04.503 | TYPE 1 STANDARD FOUNDATION |
0.08
| 2 | EA | $747.00 | $2,000.00 |
$4,000.00
| $2,017.50 | $2,010.00 |
307.04.503 | TYPE 17 STANDARD FOUNDATION |
0.08
| 1 | EA | $4,813.00 | $4,000.00 |
$4,000.00
| $3,825.00 | $3,800.00 |
307.04.504 | 55' SIGNAL MAST ARM |
0.34
| 2 | EA | $5,034.00 | $8,000.00 |
$16,000.00
| $8,062.50 | $8,025.00 |
307.04.504 | 20' SIGNAL MAST ARM |
0.07
| 1 | EA | $1,942.00 | $3,500.00 |
$3,500.00
| $3,425.00 | $3,400.00 |
307.04.510 | 12' LUMINAIRE MAST ARM |
0.20
| 6 | EA | $1,165.00 | $1,600.00 |
$9,600.00
| $1,587.50 | $1,600.00 |
307.04.510 | 15' LUMINAIRE MAST ARM |
0.13
| 4 | EA | $1,457.00 | $1,500.00 |
$6,000.00
| $1,568.75 | $1,587.50 |
307.04.516 | PEDESTRIAN PUSH BUTTON |
0.15
| 6 | EA | $1,542.00 | $1,200.00 |
$7,200.00
| $1,140.00 | $1,130.00 |
307.04.518 | PEDESTRIAN PUSH BUTTON PLATE |
0
| 6 | EA | $67.00 | $25.00 |
$150.00
| $20.50 | $19.50 |
307.04.526 | RETROREFLECTIVE STREET NAME SIGN |
0.13
| 5 | EA | $1,700.00 | $1,200.00 |
$6,000.00
| $1,135.00 | $1,120.00 |
307.04.532 | 3-12" LED VEHICLE HEAD (COMPLETE) |
0.34
| 18 | EA | $1,270.00 | $900.00 |
$16,200.00
| $897.50 | $900.00 |
310.05.007 | DETAIL 21 (THERMOPLASTIC) |
0
| 240 | LF | $1.76 | $0.75 |
$180.00
| $0.80 | $0.80 |
310.05.007 | DETAIL 9 (THERMOPLASTIC) |
0.26
| 41053 | LF | $0.80 | $0.30 |
$12,315.90
| $0.35 | $0.35 |
310.05.007 | DETAIL 27 (THERMOPLASTIC) |
0
| 310 | LF | $4.58 | $0.75 |
$232.50
| $0.73 | $0.65 |
310.05.007 | DETAIL 25 (THERMOPLASTIC) |
0
| 90 | LF | $2.29 | $0.50 |
$45.00
| $0.56 | $0.55 |
310.05.007 | DETAIL 38 (THERMOPLASTIC) |
0.06
| 2462 | LF | $3.16 | $1.25 |
$3,077.50
| $0.90 | $0.80 |
310.05.007 | DETAIL 39 (THERMOPLASTIC) |
0.13
| 10339 | LF | $1.96 | $0.60 |
$6,203.40
| $0.65 | $0.68 |
310.05.014 | DETAIL 39A (THERMOPLASTIC) |
0.15
| 11800 | LF | $2.32 | $0.60 |
$7,080.00
| $0.50 | $0.48 |
310.05.022 | DETAIL 27B (THERMOPLASTIC) |
0.08
| 8247 | LF | $0.88 | $0.45 |
$3,711.15
| $0.55 | $0.55 |
310.05.034 | PAVEMENT MARKINGS (THERMOPLASTIC) |
0.14
| 1296 | SF | $5.00 | $5.00 |
$6,480.00
| $4.78 | $5.00 |
310.05.040 | 12" STRIPING (THERMOPLASTIC) |
0.10
| 1594 | LF | $7.00 | $3.00 |
$4,782.00
| $2.46 | $2.50 |
310.05.040 | 8" STRIPING (THERMOPLASTIC) |
0
| 160 | LF | $5.00 | $1.00 |
$160.00
| $1.06 | $1.10 |
310.05.040 | 4" STRIPING (THERMOPLASTIC) |
0.01
| 820 | LF | $4.00 | $0.50 |
$410.00
| $0.69 | $0.73 |
310.05.043 | CURB MARKINGS (ONE-COAT PAINT) |
0.01
| 213 | LF | $3.00 | $3.00 |
$639.00
| $1.86 | $1.63 |
310.05.106 | REMOVE DETAIL 9 (THERMOPLASTIC) |
0.05
| 5349 | LF | $1.20 | $0.45 |
$2,407.05
| $1.40 | $1.45 |
310.05.106 | REMOVE DETAIL 38 (THERMOPLASTIC) |
0.03
| 1455 | LF | $1.20 | $0.90 |
$1,309.50
| $1.61 | $1.65 |
310.05.129 | REMOVE PAVEMENT MARKINGS (THERMOPLASTIC) |
0
| 135 | SF | $7.00 | $1.50 |
$202.50
| $1.81 | $1.88 |
310.05.135 | REMOVE 4" STRIPING (THERMOPLASTIC) |
0
| 80 | LF | $3.00 | $1.00 |
$80.00
| $1.50 | $1.63 |
310.05.135 | REMOVE 12" STRIPING (THERMOPLASTIC) |
0
| 105 | LF | $7.00 | $2.00 |
$210.00
| $1.94 | $2.13 |
312.01.017 | INSTALL FIRE HYDRANT LOCATION RPM |
0
| 15 | EA | $150.00 | $10.00 |
$150.00
| $16.50 | $18.00 |
315.06.003 | SIGN PANEL |
0.07
| 34 | EA | $250.00 | $100.00 |
$3,400.00
| $96.75 | $96.00 |
315.06.017 | INSTALL SIGN (STRAP AND SADDLE BRACKET) |
0.06
| 28 | EA | $210.00 | $100.00 |
$2,800.00
| $105.00 | $100.00 |
315.06.023 | RELOCATE SIGN |
0.01
| 1 | EA | $2,500.00 | $300.00 |
$300.00
| $153.75 | $117.50 |
315.06.029 | REMOVE SIGN POST |
0.01
| 7 | EA | $320.00 | $100.00 |
$700.00
| $54.00 | $45.00 |
601.09.011 | TRAFFIC CONTROL |
4.22
| 1 | LS | $535,000.00 | $200,000.00 |
$200,000.00
| $332,000.00 | $340,000.00 |
601.09.017 | FLASHING ARROW SIGN |
1.27
| 3 | EA | $3,200.00 | $20,000.00 |
$60,000.00
| $11,625.00 | $10,250.00 |
601.09.019 | CHANGEABLE MESSAGE SIGN |
1.69
| 2 | EA | $5,000.00 | $40,000.00 |
$80,000.00
| $23,750.00 | $20,500.00 |
801.04.021 | LANDSCAPING |
3.17
| 1 | LS | $183,000.00 | $150,000.00 |
$150,000.00
| $135,250.00 | $133,500.00 |
801.05.003 | IRRIGATION SYSTEM |
2
| 1 | LS | $202,000.00 | $95,000.00 |
$95,000.00
| $87,100.00 | $82,500.00 |
801.06.015 | DECOMPOSED GRANITE, 4" THICK |
3.27
| 42445 | SF | $4.66 | $3.65 |
$154,924.25
| $5.19 | $4.56 |
801.06.017 | RIVER ROCK PAVING |
1.91
| 19066 | SF | $16.00 | $4.75 |
$90,563.50
| $7.13 | $6.88 |
| WIRE #10 |
0.09
| 3440 | LF | $1.00 | $1.25 |
$4,300.00
| $1.24 | $1.25 |
| LOCAL DEPRESSION PER SPPWC STD PLAN 313-3, CASE D |
0.06
| 2 | EA | $2,900.00 | $1,500.00 |
$3,000.00
| $1,700.00 | $1,650.00 |
| LOCAL DEPRESSION PER SPPWC STD PLAN 313-3, CASE E |
0.04
| 1 | EA | $1,400.00 | $1,700.00 |
$1,700.00
| $1,687.50 | $1,625.00 |
| LED LUMINAIRES (200W HPS EQUIVALENT) |
0.21
| 10 | EA | $993.00 | $1,000.00 |
$10,000.00
| $961.25 | $952.50 |
| LED COUNTDOWN PEDESTRIAN HEAD (COMPLETE) |
0.15
| 8 | EA | $710.00 | $900.00 |
$7,200.00
| $857.50 | $845.00 |
| ONE-POST (ROADSIDE SIGN) |
0.09
| 22 | EA | $800.00 | $200.00 |
$4,400.00
| $151.25 | $140.00 |
| PCC CURB INLET AND OUTLET |
0.57
| 27 | EA | $4,000.00 | $1,000.00 |
$27,000.00
| $976.25 | $1,050.00 |
| PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $2,500) |
0.05
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
| REPAIR MORTAR |
0.09
| 1 | CY | $2,000.00 | $4,500.00 |
$4,500.00
| $3,515.00 | $3,180.00 |
| SCE WORK (ALLOWANCE OF $10,000) |
0.21
| 10000 | AL | $1.00 | $1.00 |
$10,000.00
| $1.00 | $1.00 |
| SEAL 18" PIPE WITH 8" BRICK AND CEMENT MORTAR |
0.11
| 1 | EA | $3,200.00 | $5,000.00 |
$5,000.00
| $1,941.25 | $1,150.00 |
| SEAL 48" PIPE WITH 8" BRICK AND CEMENT MORTAR |
0.11
| 1 | EA | $4,500.00 | $5,000.00 |
$5,000.00
| $2,757.50 | $2,550.00 |
| WIRE #6 |
0
| 75 | LF | $2.00 | $3.00 |
$225.00
| $2.74 | $2.75 |
| 4-CAMERA VIDEO/RADAR DETECTION SYSTEM (COMPLETE), RACK MOUNT 17" LCD MONITOR |
1.06
| 1 | EA | $35,000.00 | $50,000.00 |
$50,000.00
| $49,750.00 | $50,000.00 |
| 90 DAY PLANT ESTABLISHMENT PERIOD |
0.08
| 1 | LS | $30,000.00 | $4,000.00 |
$4,000.00
| $3,750.00 | $3,750.00 |
| AGRONOMIC SOIL REPORT |
0.03
| 3 | EA | $5,000.00 | $500.00 |
$1,500.00
| $507.50 | $505.00 |
| ADJUST WATER VALVE FRAME AND COVER TO NEW GRADE |
0.22
| 17 | EA | $500.00 | $600.00 |
$10,200.00
| $510.00 | $507.50 |
| ADJUST WATER VAULT PER DETAIL B ON SHEET 12 |
0.13
| 1 | EA | $2,000.00 | $6,000.00 |
$6,000.00
| $3,762.50 | $3,125.00 |
| ALUMINUM EDGING |
2.04
| 9661 | LF | $6.00 | $10.00 |
$96,610.00
| $19.03 | $15.00 |
| BICYCLE CATCH BASIN GRATE PER CITY OF LOS ANGELES STD PLAN S-342-4 |
0.22
| 7 | EA | $12,000.00 | $1,500.00 |
$10,500.00
| $1,212.50 | $1,350.00 |
| CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $2,000) |
0.04
| 2000 | AL | $1.00 | $1.00 |
$2,000.00
| $1.00 | $1.00 |
| COMPOSITE TYPE 3 PULL BOX INCL COVER |
0.27
| 13 | EA | $767.00 | $1,000.00 |
$13,000.00
| $1,085.00 | $1,105.00 |
| CONSTRUCT PIPE SEAL FOR 18" PIPE PER STD PLAN 381-2 |
0.11
| 1 | EA | $2,700.00 | $5,000.00 |
$5,000.00
| $4,062.50 | $3,500.00 |
| CONSTRUCT PIPE SEAL FOR 48" PIPE PER STD PLAN 381-2 |
0.11
| 1 | EA | $3,000.00 | $5,000.00 |
$5,000.00
| $9,400.00 | $4,300.00 |
| CONTINENTAL CROSSWALK (THERMOPLASTIC) |
0.26
| 4134 | SF | $5.00 | $3.00 |
$12,402.00
| $2.46 | $2.50 |
| DOUBLE ADJUST WATER VALVE FRAME AND COVER PER DETAIL A ON SHEET 3 |
0.13
| 3 | EA | $2,000.00 | $2,000.00 |
$6,000.00
| $1,198.75 | $1,010.00 |
| DRAINAGE SUMP WITH ATRIUM GRATE DRAIN |
0.07
| 7 | EA | $1,800.00 | $500.00 |
$3,500.00
| $367.75 | $335.50 |
| EXPLORATORY EXCAVATION OF UTILITIES (ALLOWANCE OF $10,000) |
0.21
| 10000 | AL | $1.00 | $1.00 |
$10,000.00
| $1.00 | $1.00 |
| IMPORTED TOPSOIL |
0.92
| 840 | CY | $70.00 | $52.00 |
$43,680.00
| $62.75 | $65.50 |
| Total Percent | 100 | | | | Total Amount | $4,738,828.08 | | |