Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,000) |
0.27
| 1 | LS | $2,000.00 | $2,000.00 |
$2,000.00
| $2,000.00 | $2,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.20
| 3 | MTH | $500.00 | $500.00 |
$1,500.00
| $500.00 | $500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.14
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.07.003 | IMPLEMENTATION OF BMPS |
1.08
| 1 | LS | $5,000.00 | $8,000.00 |
$8,000.00
| $7,040.00 | $8,000.00 |
001.08.005 | OFFICE FACILITIES |
0.61
| 3 | MTH | $5,000.00 | $1,500.00 |
$4,500.00
| $3,070.00 | $2,000.00 |
001.09.003 | MOBILIZATION |
3.49
| 1 | LS | $60,000.00 | $25,802.50 |
$25,802.50
| $52,960.50 | $54,000.00 |
300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
1.11
| 41 | CY | $150.00 | $200.00 |
$8,200.00
| $216.00 | $200.00 |
300.02.003 | UNCLASSIFIED EXCAVATION |
8.70
| 477 | CY | $160.00 | $135.00 |
$64,395.00
| $151.20 | $150.00 |
300.10.003 | STABILIZATION GEOTEXTILE |
0.70
| 573 | SY | $8.00 | $9.00 |
$5,157.00
| $6.00 | $6.00 |
301.02.005 | CRUSHED MISCELLANEOUS BASE |
2.88
| 185 | CY | $185.00 | $115.00 |
$21,275.00
| $143.60 | $128.00 |
301.03.005 | TRENCH BACKFILL SLURRY (CLASS 270-E-500) |
0.77
| 19 | CY | $200.00 | $300.00 |
$5,700.00
| $196.00 | $200.00 |
302.01.007 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
10.87
| 229752 | SF | $0.40 | $0.35 |
$80,413.20
| $0.34 | $0.35 |
302.05.014 | AC PAVEMENT(PATCH BACK) |
0.69
| 30 | TON | $300.00 | $170.00 |
$5,100.00
| $198.00 | $180.00 |
302.05.019 | AC PAVEMENT(LEVELING COURSE) |
11.69
| 1081 | TON | $110.00 | $80.00 |
$86,480.00
| $94.00 | $97.00 |
302.05.025 | DOUBLE ADJUST MANHOLE |
2.82
| 22 | EA | $800.00 | $950.00 |
$20,900.00
| $1,108.00 | $1,200.00 |
302.06.003 | PCC PAVEMENT |
9.14
| 169 | CY | $500.00 | $400.00 |
$67,600.00
| $341.60 | $320.00 |
302.13.003 | PMAC PAVEMENT |
21.50
| 1657 | TON | $110.00 | $96.00 |
$159,072.00
| $91.40 | $91.00 |
302.13.005 | PMAC PAVEMENT (TEST STRIP) |
6.49
| 500 | TON | $110.00 | $96.00 |
$48,000.00
| $102.00 | $96.00 |
303.01.113 | DRILL AND BOND DOWEL |
0.08
| 3 | LF | $100.00 | $200.00 |
$600.00
| $320.00 | $300.00 |
303.05.010 | PCC CURB & GUTTER, TYPE A2-8 |
1.37
| 254 | LF | $30.00 | $40.00 |
$10,160.00
| $53.40 | $55.00 |
303.05.043 | PCC WALK, 4" THICK |
0.40
| 195 | SF | $15.00 | $15.00 |
$2,925.00
| $21.00 | $25.00 |
303.05.050 | PCC CURB RAMPS |
1.92
| 21 | CY | $400.00 | $675.00 |
$14,175.00
| $975.00 | $900.00 |
303.05.059 | DETECTABLE WARNING SURFACE |
1.99
| 258 | SF | $40.00 | $57.00 |
$14,706.00
| $53.40 | $50.00 |
307.02.045 | NO. 6 PULL BOX INCL PCC COVER |
0.46
| 4 | EA | $800.00 | $850.00 |
$3,400.00
| $1,090.00 | $900.00 |
307.02.049 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
2.01
| 1855 | LF | $11.00 | $8.00 |
$14,840.00
| $9.20 | $10.00 |
310.05.007 | DETAIL 9 (THERMOPLASTIC) |
0.83
| 13430 | LF | $1.50 | $0.46 |
$6,177.80
| $0.48 | $0.50 |
310.05.007 | DETAIL 26 (THERMOPLASTIC) |
0.16
| 6500 | LF | $1.60 | $0.18 |
$1,170.00
| $0.22 | $0.20 |
310.05.007 | DETAIL 38 (THERMOPLASTIC) |
0.15
| 917 | LF | $3.50 | $1.25 |
$1,146.25
| $1.08 | $1.05 |
310.05.007 | DETAIL 40 (THERMOPLASTIC) |
0.03
| 50 | LF | $2.50 | $4.50 |
$225.00
| $2.98 | $2.50 |
310.05.034 | PAVEMENT MARKINGS (THERMOPLASTIC) |
0.48
| 493 | SF | $8.50 | $7.25 |
$3,574.25
| $6.63 | $6.80 |
310.05.040 | 12" STRIPING (THERMOPLASTIC) |
0.38
| 1132 | LF | $5.50 | $2.50 |
$2,830.00
| $2.62 | $2.50 |
310.05.040 | 24" STRIPING (THERMOPLASTIC) |
0.09
| 107 | LF | $8.00 | $6.00 |
$642.00
| $5.64 | $6.00 |
310.05.103 | REMOVE DETAIL 22 |
0.02
| 20 | LF | $4.50 | $8.00 |
$160.00
| $6.84 | $8.00 |
310.05.103 | REMOVE DETAIL 38 |
0.04
| 40 | LF | $3.50 | $8.00 |
$320.00
| $6.84 | $8.00 |
310.05.129 | REMOVE PAVEMENT MARKINGS (THERMOPLASTIC) |
0.10
| 88 | SF | $7.00 | $8.00 |
$704.00
| $8.04 | $8.00 |
310.05.135 | REMOVE 12" STRIPING (THERMOPLASTIC) |
0.08
| 115 | LF | $3.00 | $5.00 |
$575.00
| $6.63 | $5.00 |
312.01.017 | INSTALL FIRE HYDRANT LOCATION RPM |
0.08
| 23 | EA | $10.00 | $25.00 |
$575.00
| $15.52 | $15.00 |
601.09.011 | TRAFFIC CONTROL |
2.03
| 1 | LS | $25,000.00 | $15,000.00 |
$15,000.00
| $47,990.00 | $45,000.00 |
601.09.019 | CHANGEABLE MESSAGE SIGN |
0.41
| 1 | EA | $5,000.00 | $3,000.00 |
$3,000.00
| $4,400.00 | $4,500.00 |
| DOUBLE ADJUST WATER VALVE FRAME AND COVER PER DETAIL D ON SHEET 7 |
1.76
| 20 | EA | $1,000.00 | $650.00 |
$13,000.00
| $760.00 | $750.00 |
| UNION PACIFIC RAILROAD (UPRR) RIGHT OF ENTRY AGREEMENT AND INSPECTION FEES (ALLOWANCE OF $5,000) |
0.68
| 5000 | AL | $1.00 | $1.00 |
$5,000.00
| $1.00 | $1.00 |
| CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $10,000) |
1.35
| 10000 | AL | $1.00 | $1.00 |
$10,000.00
| $1.00 | $1.00 |
| Total Percent | 100 | | | | Total Amount | $740,000.00 | | |