Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.002 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $2,500) |
0.09
| 1 | LS | $2,500.00 | $2,500.00 |
$2,500.00
| $2,500.00 | $2,500.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.17
| 3 | MTH | $500.00 | $1,500.00 |
$4,500.00
| $1,500.00 | $1,500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.04
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.06.011 | IMPLEMENTATION OF THE LTWHP |
0.56
| 1 | LS | $10,000.00 | $15,000.00 |
$15,000.00
| $21,291.67 | $20,125.00 |
001.07.004 | PREPARATION OF THE SWPPP (STIPULATED UNIT PRICE OF $5,000) |
0.19
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
001.07.007 | IMPLEMENTATION OF THE SWPPP |
0.93
| 1 | LS | $34,000.00 | $25,000.00 |
$25,000.00
| $46,583.33 | $46,000.00 |
001.07.021 | SHORING OF OPEN EXCAVATIONS |
10.55
| 1 | LS | $350,000.00 | $284,711.00 |
$284,711.00
| $85,618.50 | $42,000.00 |
001.08.005 | OFFICE FACILITIES |
0.44
| 4 | MTH | $1,500.00 | $3,000.00 |
$12,000.00
| $5,620.83 | $4,362.50 |
001.09.003 | MOBILIZATION |
10
| 1 | LS | $295,000.00 | $270,000.00 |
$270,000.00
| $269,166.67 | $289,000.00 |
300.01.003 | CLEARING AND GRUBBING |
2.76
| 1 | LS | $40,000.00 | $74,500.00 |
$74,500.00
| $92,916.67 | $97,250.00 |
300.01.014 | TREE REMOVAL (13"-24" DIAMETER) |
0.15
| 1 | EA | $2,500.00 | $4,000.00 |
$4,000.00
| $2,550.00 | $2,500.00 |
300.01.015 | TREE REMOVAL (25"+ DIAMETER) |
0.30
| 1 | EA | $4,750.00 | $8,000.00 |
$8,000.00
| $5,341.67 | $6,000.00 |
300.01.057 | REMOVE EXISTING CHAIN LINK FENCE |
0.96
| 1730 | LF | $25.00 | $15.00 |
$25,950.00
| $10.33 | $10.00 |
300.01.065 | CONCRETE REMOVAL (NON-REINFORCED) |
0.44
| 96 | CY | $400.00 | $125.00 |
$12,000.00
| $258.75 | $220.00 |
300.01.067 | CONCRETE REMOVAL (REINFORCED) |
0.06
| 1 | CY | $500.00 | $1,500.00 |
$1,500.00
| $1,111.67 | $975.00 |
300.02.003 | UNCLASSIFIED EXCAVATION |
11.15
| 1881 | CY | $204.00 | $160.00 |
$300,960.00
| $125.04 | $134.75 |
300.04.013 | STRUCTURE EXCAVATION (RETAINING WALL) |
5.37
| 1706 | CY | $250.00 | $85.00 |
$145,010.00
| $104.08 | $95.00 |
300.04.033 | STRUCTURE BACKFILL (RETAINING WALL) |
4.05
| 1457 | CY | $275.00 | $75.00 |
$109,275.00
| $103.42 | $80.50 |
301.02.005 | CRUSHED MISCELLANEOUS BASE |
0.80
| 135 | CY | $150.00 | $160.00 |
$21,600.00
| $142.75 | $144.50 |
302.01.005 | COLD MILL AC PAVEMENT (0 - 1-1/2") |
0.97
| 13133 | SF | $1.00 | $2.00 |
$26,266.00
| $1.77 | $1.31 |
302.05.008 | AC CURB, TYPE D1-8 |
0.13
| 58 | LF | $45.00 | $60.00 |
$3,480.00
| $74.96 | $62.88 |
302.05.009 | AC CURB, TYPE D1-VAR |
0.06
| 28 | LF | $50.00 | $60.00 |
$1,680.00
| $79.13 | $72.88 |
302.05.013 | AC PAVEMENT |
6.53
| 1175 | TON | $250.00 | $150.00 |
$176,250.00
| $170.21 | $166.13 |
302.05.014 | AC PAVEMENT(PATCH BACK) |
0.89
| 69 | TON | $400.00 | $350.00 |
$24,150.00
| $317.71 | $317.50 |
302.05.016 | AC PAVEMENT(DRIVEWAYS) |
0.36
| 24 | TON | $350.00 | $400.00 |
$9,600.00
| $339.79 | $360.00 |
302.06.003 | PCC PAVEMENT |
0.48
| 20 | CY | $600.00 | $650.00 |
$13,000.00
| $1,055.00 | $950.00 |
303.05.003 | PCC CURB, TYPE A1-6 |
0.17
| 35 | LF | $60.00 | $130.00 |
$4,550.00
| $67.13 | $58.88 |
303.05.004 | PCC CURB, TYPE A1-8 |
2.85
| 3076 | LF | $55.00 | $25.00 |
$76,900.00
| $38.46 | $35.00 |
303.05.043 | PCC WALK, 4" THICK |
0.31
| 919 | SF | $12.00 | $9.00 |
$8,271.00
| $14.43 | $15.00 |
303.05.050 | PCC CURB RAMPS |
0.57
| 7 | CY | $1,500.00 | $2,200.00 |
$15,400.00
| $2,225.00 | $2,350.00 |
303.05.059 | DETECTABLE WARNING SURFACE |
0.21
| 140 | SF | $65.00 | $40.00 |
$5,600.00
| $76.92 | $66.25 |
304.02.007 | METAL HAND RAILINGS PER STD PLAN 606 |
1.10
| 169 | LF | $300.00 | $175.00 |
$29,575.00
| $215.03 | $208.00 |
304.03.003 | CHAIN LINK FENCE, 5' HIGH |
2.38
| 1284 | LF | $100.00 | $50.00 |
$64,200.00
| $48.07 | $46.50 |
304.06.009 | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
0.35
| 9370 | LB | $5.00 | $1.00 |
$9,370.00
| $2.25 | $1.65 |
306.01.129 | 18" RCP, 2500 D |
0.72
| 65 | LF | $700.00 | $300.00 |
$19,500.00
| $429.17 | $357.50 |
307.02.049 | INDUCTIVE LOOP DETECTOR AND LEADS SAW CUT |
0.69
| 1239 | LF | $12.50 | $15.00 |
$18,585.00
| $15.59 | $15.00 |
310.05.007 | DETAIL 9 (THERMOPLASTIC) |
0.03
| 880 | LF | $2.00 | $0.80 |
$704.00
| $1.03 | $0.84 |
310.05.007 | DETAIL 38 (THERMOPLASTIC) |
0.02
| 350 | LF | $3.00 | $1.30 |
$455.00
| $1.32 | $1.23 |
310.05.007 | DETAIL 27 (THERMOPLASTIC) |
0.04
| 645 | LF | $3.00 | $1.50 |
$967.50
| $1.60 | $1.50 |
310.05.022 | DETAIL 27B (THERMOPLASTIC) |
0.26
| 7100 | LF | $1.50 | $1.00 |
$7,100.00
| $1.06 | $1.00 |
310.05.034 | PAVEMENT MARKINGS (THERMOPLASTIC) |
0.06
| 177 | SF | $7.50 | $9.00 |
$1,593.00
| $8.96 | $9.00 |
310.05.040 | 8" STRIPING (THERMOPLASTIC) |
0.03
| 635 | LF | $2.50 | $1.20 |
$762.00
| $1.30 | $1.18 |
310.05.040 | 12" STRIPING (THERMOPLASTIC) |
0.03
| 200 | LF | $4.00 | $4.00 |
$800.00
| $3.63 | $3.72 |
310.05.040 | 24" STRIPING (THERMOPLASTIC) |
0.39
| 1320 | LF | $7.00 | $8.00 |
$10,560.00
| $7.27 | $7.45 |
310.05.040 | 4" STRIPING (THERMOPLASTIC) |
0
| 105 | LF | $1.50 | $0.60 |
$63.00
| $0.81 | $0.84 |
310.05.043 | CURB MARKINGS (ONE-COAT PAINT) |
0.02
| 130 | LF | $3.50 | $4.50 |
$585.00
| $4.37 | $4.26 |
310.05.129 | REMOVE PAVEMENT MARKINGS (THERMOPLASTIC) |
0
| 45 | SF | $3.00 | $2.20 |
$99.00
| $2.10 | $2.01 |
315.06.003 | SIGN PANEL |
0.10
| 23 | EA | $200.00 | $120.00 |
$2,760.00
| $113.71 | $114.51 |
315.06.023 | RELOCATE SIGN |
0.04
| 10 | EA | $160.00 | $100.00 |
$1,000.00
| $89.55 | $88.04 |
315.06.025 | REMOVE SIGN |
0.01
| 4 | EA | $100.00 | $60.00 |
$240.00
| $58.31 | $58.69 |
601.09.011 | TRAFFIC CONTROL |
2.78
| 1 | LS | $115,000.00 | $75,000.00 |
$75,000.00
| $230,705.84 | $221,000.00 |
| RELOCATE SIGN POST |
0.07
| 9 | EA | $200.00 | $220.00 |
$1,980.00
| $205.35 | $200.42 |
| PREPARATION OF THE DIVERSION OF WATER PLAN (STIPULATED UNIT PRICE OF $5,000) |
0.19
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
| REINFORCED CONCRETE RETAINING WALL TYPE 6 - CALTRANS |
15.79
| 294 | CY | $2,000.00 | $1,450.00 |
$426,300.00
| $1,687.50 | $1,475.00 |
| NON-SLIP MATERIAL ON METAL VAULT COVER |
0.39
| 3 | EA | $200.00 | $3,500.00 |
$10,500.00
| $2,658.33 | $1,925.00 |
| REMOVE AND DISPOSE CHAIN LINK GATE |
0.07
| 2 | EA | $600.00 | $900.00 |
$1,800.00
| $1,052.08 | $956.25 |
| REMOVE AND DISPOSE BOLLARD |
0.01
| 1 | EA | $430.00 | $250.00 |
$250.00
| $570.42 | $486.25 |
| REMOVE 18 " CSP |
0.11
| 58 | LF | $100.00 | $50.00 |
$2,900.00
| $139.58 | $107.50 |
| REMOVE STRIPING (THERMOPLASTIC) |
0.24
| 4401 | LF | $2.00 | $1.50 |
$6,601.50
| $1.69 | $1.60 |
| IMPLEMENTATION OF THE DIVERSION OF WATER PLAN |
2.78
| 1 | LS | $40,000.00 | $75,000.00 |
$75,000.00
| $37,166.67 | $35,000.00 |
| FILTRATION TRENCH |
5.36
| 1856 | LF | $115.00 | $78.00 |
$144,768.00
| $118.17 | $135.00 |
| DETAIL 1 (MODIFIED) (THERMOPLASTIC) |
0.12
| 3180 | LF | $1.50 | $1.00 |
$3,180.00
| $1.15 | $1.00 |
| CHAIN LINK FENCE, 5' HIGH ON TOP OF WALL |
0.84
| 456 | LF | $180.00 | $50.00 |
$22,800.00
| $50.58 | $46.63 |
| SIGN POST (ROADSIDE SIGN) |
0.12
| 9 | EA | $300.00 | $350.00 |
$3,150.00
| $323.64 | $310.30 |
| CASE CM CURB RAMP |
0.20
| 1 | EA | $1,630.00 | $5,500.00 |
$5,500.00
| $6,270.83 | $5,250.00 |
| ROLLING CHAIN LINK GATE |
0.74
| 2 | EA | $5,000.00 | $10,000.00 |
$20,000.00
| $16,263.54 | $17,040.63 |
| PCC CURB, TYPE A1-MOD |
1.42
| 2247 | LF | $60.00 | $17.00 |
$38,199.00
| $35.63 | $35.00 |
| Total Percent | 100 | | | | Total Amount | $2,699,500.00 | | |