Bid Price History

Workman Mill Road Landscaping
$921,209.50
06/30/2020
637 (J4),637 (E6),637 (F6),637 (F5),637 (G5),637 (H5),637 (H4)
7
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.001CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) 0.54 1LS$5,000.00$5,000.00 $5,000.00 $5,000.00$5,000.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $750/MONTH) 0.24 3MTH$750.00$750.00 $2,250.00 $750.00$750.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $2,000) 0.22 1LS$2,000.00$2,000.00 $2,000.00 $2,000.00$2,000.00
001.07.003IMPLEMENTATION OF BMPS 0.54 1LS$5,000.00$5,000.00 $5,000.00 $7,557.14$5,000.00
001.08.005OFFICE FACILITIES 0.49 3MTH$5,000.00$1,500.00 $4,500.00 $2,246.86$2,500.00
001.09.003MOBILIZATION 5.16 1LS$35,000.00$47,500.00 $47,500.00 $43,655.71$47,500.00
300.01.003CLEARING AND GRUBBING 2.99 1LS$2,000.00$27,500.00 $27,500.00 $10,622.71$6,000.00
300.01.065CONCRETE REMOVAL (NON-REINFORCED) 2.47 86CY$162.00$265.00 $22,790.00 $404.20$476.43
300.02.003UNCLASSIFIED EXCAVATION 6.78 595CY$87.00$105.00 $62,475.00 $98.42$86.00
303.05.043PCC WALK, 4" THICK 4.49 3179SF$7.00$13.00 $41,327.00 $18.45$14.40
601.09.011TRAFFIC CONTROL 1.63 1LS$40,000.00$15,000.00 $15,000.00 $30,133.86$25,000.00
601.09.017FLASHING ARROW SIGN 0.33 2EA$5,000.00$1,500.00 $3,000.00 $2,322.93$1,500.00
801.04.021LANDSCAPING 4.88 1LS$35,970.00$45,000.00 $45,000.00 $69,018.76$55,000.00
801.05.003IRRIGATION SYSTEM 27.68 1LS$170,030.00$255,000.00 $255,000.00 $224,087.19$235,000.00
801.06.003PLANT ESTABLISHMENT PERIOD 0.49 1LS$4,800.00$4,500.00 $4,500.00 $6,673.00$5,000.00
801.06.015DECOMPOSED GRANITE, 4" THICK 3.79 9975SF$5.00$3.50 $34,912.50 $3.89$4.00
 WELDED WIRE VINE TRELLIS 29.32 3915LF$90.00$69.00 $270,135.00 $68.07$63.40
 REMOVE EXISTING WOOD HEADER 0.36 6650LF$2.00$0.50 $3,325.00 $0.94$1.00
 AGRONOMIC SOIL REPORT 0.07 6EA$175.00$100.00 $600.00 $221.61$236.25
 ALUMINUM HEADER 6.14 6650LF$7.00$8.50 $56,525.00 $7.69$7.35
 IMPORTED CLASS A TOPSOIL 1.40 143CY$60.00$90.00 $12,870.00 $134.84$90.00
 Total Percent100   Total Amount$921,209.50