Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.07.003 | IMPLEMENTATION OF BMPS |
1.67
| 1 | LS | $10,000.00 | $15,000.00 |
$15,000.00
| $19,367.71 | $15,574.00 |
001.09.003 | MOBILIZATION |
10.55
| 1 | LS | $50,000.00 | $95,000.00 |
$95,000.00
| $84,499.86 | $95,000.00 |
300.01.003 | CLEARING AND GRUBBING |
0.56
| 1 | LS | $10,000.00 | $5,000.00 |
$5,000.00
| $36,064.43 | $8,451.00 |
300.02.003 | UNCLASSIFIED EXCAVATION |
8.95
| 597 | CY | $325.00 | $135.00 |
$80,595.00
| $257.29 | $220.00 |
302.05.013 | AC PAVEMENT |
5.36
| 91 | TON | $1,600.00 | $530.00 |
$48,230.00
| $504.43 | $505.00 |
303.01.003 | STRUCTURE CONCRETE |
0.89
| 2 | CY | $2,000.00 | $4,000.00 |
$8,000.00
| $8,316.57 | $6,750.00 |
304.06.003 | REMOVE AND DISPOSE OF EXISTING GUARDRAIL (INCLUDING POSTS) |
6.42
| 3856 | LF | $13.56 | $15.00 |
$57,840.00
| $14.20 | $15.00 |
304.06.009 | TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
7.28
| 65539 | LB | $0.45 | $1.00 |
$65,539.00
| $0.47 | $0.40 |
304.06.019 | MIDWEST GUARDRAIL SYSTEM (STEEL POST W/ PLASTIC BLOCK) |
18.48
| 2683 | LF | $80.80 | $62.00 |
$166,346.00
| $69.43 | $70.00 |
304.06.021 | MIDWEST GUARDRAIL SYSTEM (WOOD POST W/ WOOD BLOCK) |
3.94
| 507 | LF | $80.80 | $70.00 |
$35,490.00
| $67.43 | $65.00 |
304.06.043 | MIDWEST GUARDRAIL SYSTEM END ANCHOR ASSEMBLY (TYPE SFT) PER STD PLAN A77S1 |
0.67
| 3 | EA | $1,615.90 | $2,000.00 |
$6,000.00
| $2,237.71 | $1,261.00 |
304.06.047 | MIDWEST GUARDRAIL SYSTEM BURIED POST END ANCHOR PER STD PLAN A77T2 |
0.56
| 1 | EA | $2,361.70 | $5,000.00 |
$5,000.00
| $2,344.29 | $2,109.00 |
304.06.051 | TRANSITION RAILING (TYPE WB) |
5.74
| 11 | EA | $5,593.50 | $4,700.00 |
$51,700.00
| $5,730.43 | $5,900.00 |
601.09.011 | TRAFFIC CONTROL |
7.22
| 1 | LS | $80,000.00 | $65,000.00 |
$65,000.00
| $140,740.14 | $130,000.00 |
601.09.017 | FLASHING ARROW SIGN |
0.44
| 2 | EA | $5,000.00 | $2,000.00 |
$4,000.00
| $4,731.43 | $5,000.00 |
601.09.019 | CHANGEABLE MESSAGE SIGN |
1.11
| 2 | EA | $5,000.00 | $5,000.00 |
$10,000.00
| $8,986.57 | $7,206.00 |
| SHOULDER GRADING |
1.45
| 522 | LF | $10.00 | $25.00 |
$13,050.00
| $66.88 | $30.00 |
| AC PAVEMENT (INVERTED SHOULDERS AND V-DITCH) |
1.01
| 14 | TON | $1,700.00 | $650.00 |
$9,100.00
| $817.00 | $650.00 |
| IN-LINE TERMINAL SYSTEM (TYPE MSKT-SP-MGS) |
7.31
| 14 | EA | $6,500.00 | $4,700.00 |
$65,800.00
| $5,626.57 | $5,500.00 |
| DELINEATOR PER CALTRANS STD PLAN A73C, CLASS 1, TYPE F |
0.51
| 114 | EA | $23.73 | $40.00 |
$4,560.00
| $70.79 | $40.00 |
| EXPLORATORY EXCAVATION OF UTILITIES (ALLOWANCE OF $10,000) |
1.11
| 10000 | AL | $1.00 | $1.00 |
$10,000.00
| $1.00 | $1.00 |
| MIDWEST GUARDRAIL SYSTEM END CAP PER CALTRANS STANDARD PLAN A77M1 (TYPE A) |
0.67
| 3 | EA | $452.00 | $2,000.00 |
$6,000.00
| $698.29 | $482.00 |
| AC DIKE PER CALTRANS STD PLAN A87B |
4.03
| 954 | LF | $21.75 | $38.00 |
$36,252.00
| $25.93 | $25.00 |
| CONNECTIONS TO ABUTMENTS AND WALLS |
4.08
| 21 | CY | $2,000.00 | $1,750.00 |
$36,750.00
| $5,099.14 | $6,650.00 |
| Total Percent | 100 | | | | Total Amount | $900,252.00 | | |