North County/Antelope Valley Traffic Forum Improvements Project
$1,553,570.00
11/15/2018
3924 (F6),3924 (G7),3924 (H6),3924 (H7),3925 (A6),3924 (J7),3924 (J6),3924 (G6),3924 (F7)
2
* Non-standard items are shaded yellow
Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $5,000) |
0.32
| 1 | LS | $5,000.00 | $5,000.00 |
$5,000.00
| $5,000.00 | $5,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $400/MONTH) |
0.13
| 5 | MTH | $400.00 | $400.00 |
$2,000.00
| $400.00 | $400.00 |
001.09.003 | MOBILIZATION |
9.66
| 1 | LS | $90,000.00 | $150,000.00 |
$150,000.00
| $150,000.00 | $150,000.00 |
300.03.003 | UNCLASSIFIED FILL |
0.58
| 90 | CY | $75.00 | $100.00 |
$9,000.00
| $305.50 | $305.50 |
301.02.003 | CRUSHED AGGREGATE BASE |
0.23
| 5 | CY | $300.00 | $700.00 |
$3,500.00
| $2,850.00 | $2,850.00 |
303.01.003 | STRUCTURE CONCRETE |
0.05
| 5 | CY | $1,000.00 | $150.00 |
$750.00
| $3,025.00 | $3,025.00 |
307.02.021 | 3" CONDUIT (SCH 80 PVC) |
1.64
| 510 | LF | $50.00 | $50.00 |
$25,500.00
| $75.00 | $75.00 |
307.02.045 | NO. 6 PULL BOX INCL PCC COVER |
0.48
| 5 | EA | $700.00 | $1,500.00 |
$7,500.00
| $1,650.00 | $1,650.00 |
307.04.803 | SALVAGE EQUIPMENT |
0.32
| 1 | LS | $25,000.00 | $5,000.00 |
$5,000.00
| $12,500.00 | $12,500.00 |
601.09.011 | TRAFFIC CONTROL |
5.47
| 1 | LS | $150,000.00 | $85,000.00 |
$85,000.00
| $72,000.00 | $72,000.00 |
| RELOCATE EXISTING CONTROLLER CABINET |
0.44
| 3 | EA | $2,500.00 | $2,300.00 |
$6,900.00
| $3,900.00 | $3,900.00 |
| RELOCATE EXISTING SERVICE METER |
0.39
| 3 | EA | $2,000.00 | $2,000.00 |
$6,000.00
| $4,000.00 | $4,000.00 |
| RELOCATE POWER CONDUCTORS AND CABLES |
0.39
| 3 | EA | $500.00 | $2,000.00 |
$6,000.00
| $2,750.00 | $2,750.00 |
| REMOVE EXISTING CMS SIGN PANEL COMPLETE |
2.25
| 7 | EA | $5,000.00 | $5,000.00 |
$35,000.00
| $3,750.00 | $3,750.00 |
| REMOVE EXISTING CMS SIGN, STRUCTURE AND FOUNDATION COMPLETE |
3.86
| 5 | EA | $7,500.00 | $12,000.00 |
$60,000.00
| $8,000.00 | $8,000.00 |
| REMOVE EXISTING SIGN FOUNDATION, CONCRETE PAD COMPLETELY, AND EXISTING BOLLARDS |
0.23
| 1 | EA | $5,000.00 | $3,500.00 |
$3,500.00
| $10,750.00 | $10,750.00 |
| REMOVE EXISTING GUARDRAIL (INCLUDING POSTS) |
0.16
| 126 | LF | $20.00 | $20.00 |
$2,520.00
| $23.50 | $23.50 |
| SERVICE POLE COMPLETE |
0.45
| 1 | EA | $15,000.00 | $7,000.00 |
$7,000.00
| $11,000.00 | $11,000.00 |
| TRANSPORTATION AND DISPOSAL OF TREATED WOOD WASTE |
0.16
| 2500 | LB | $2.50 | $1.00 |
$2,500.00
| $2.50 | $2.50 |
| TYPE I SERVICE |
0.13
| 2 | EA | $3,500.00 | $1,000.00 |
$2,000.00
| $5,000.00 | $5,000.00 |
| TYPE 336S POLE MOUNT CONTROLLER CABINET |
0.45
| 2 | EA | $6,000.00 | $3,500.00 |
$7,000.00
| $6,500.00 | $6,500.00 |
| REGRADE SWALE |
0.16
| 10 | SY | $20.00 | $250.00 |
$2,500.00
| $616.00 | $616.00 |
| CMS MODEL 500 REINFORCED CONCRETE FOUNDATION |
20.92
| 5 | EA | $40,000.00 | $65,000.00 |
$325,000.00
| $64,350.00 | $64,350.00 |
| MIDWEST GUARDRAIL SYSTEM (STEEL POST WITH WOOD BLOCK) |
1.58
| 410 | LF | $50.00 | $60.00 |
$24,600.00
| $70.00 | $70.00 |
| JOBS COORDINATOR (ALLOWANCE OF $10,000) |
0
| 1 | AL | $1.00 | $0.00 |
$0.00
| $0.00 | $0.00 |
| FLARED TERMINAL SYSTEM (TYPE SRT-31) |
1.54
| 8 | EA | $2,000.00 | $3,000.00 |
$24,000.00
| $3,450.00 | $3,450.00 |
| CONSTRUCT SLOUGH WALL |
1.29
| 1 | EA | $1,500.00 | $20,000.00 |
$20,000.00
| $21,000.00 | $21,000.00 |
| CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $400) |
0.03
| 1 | LS | $400.00 | $400.00 |
$400.00
| $400.00 | $400.00 |
| CONCRETE AND STRUCTURE EXCAVATION |
1.29
| 5 | EA | $15,000.00 | $4,000.00 |
$20,000.00
| $6,150.00 | $6,150.00 |
| CMS SIGN STRUCTURE |
27.36
| 5 | EA | $80,000.00 | $85,000.00 |
$425,000.00
| $91,600.00 | $91,600.00 |
| CMS SIGN PANEL COMPLETE |
17.70
| 5 | EA | $70,000.00 | $55,000.00 |
$275,000.00
| $53,150.00 | $53,150.00 |
| POWER CONDUCTORS |
0.35
| 450 | LF | $5.00 | $12.00 |
$5,400.00
| $11.00 | $11.00 |
| Total Percent | 100 | | | | Total Amount | $1,553,570.00 | | |