Item Code | Description | % of Total Project | Quantity | Unit | Engineer's Estimate | Low Bidder Item Bid | Amount | Average Item Bid | Median Item Bid |
001.06.001 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $3,000) |
0.12
| 1 | LS | $3,000.00 | $3,000.00 |
$3,000.00
| $3,000.00 | $3,000.00 |
001.06.006 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) |
0.12
| 6 | MTH | $500.00 | $500.00 |
$3,000.00
| $500.00 | $500.00 |
001.06.009 | CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) |
0.04
| 1 | LS | $1,000.00 | $1,000.00 |
$1,000.00
| $1,000.00 | $1,000.00 |
001.07.003 | IMPLEMENTATION OF BMPS |
0.44
| 1 | LS | $20,000.00 | $10,600.00 |
$10,600.00
| $16,350.00 | $9,300.00 |
001.07.021 | SHORING OF OPEN EXCAVATIONS |
0.29
| 1 | LS | $120,000.00 | $7,000.00 |
$7,000.00
| $49,662.83 | $44,000.00 |
001.08.005 | OFFICE FACILITIES |
0.99
| 6 | MTH | $5,000.00 | $4,000.00 |
$24,000.00
| $4,883.33 | $4,000.00 |
001.09.003 | MOBILIZATION |
4.53
| 1 | LS | $170,000.00 | $110,000.00 |
$110,000.00
| $105,802.67 | $105,000.00 |
302.01.007 | COLD MILL AC PAVEMENT (> 1-1/2 - 3") |
1.05
| 65340 | SF | $0.60 | $0.39 |
$25,482.60
| $0.47 | $0.40 |
306.01.221 | AIR RELEASE AND VACUUM VALVE ASSEMBLY, 4" |
1.88
| 4 | EA | $13,000.00 | $11,400.00 |
$45,600.00
| $11,883.33 | $11,700.00 |
306.01.225 | BUTTERFLY VALVE, 150 PSI WWP, 24" |
1.55
| 4 | EA | $10,000.00 | $9,400.00 |
$37,600.00
| $12,300.00 | $13,200.00 |
306.01.227 | GATE VALVE, 200 PSI WWP, 12" |
0.72
| 5 | EA | $3,500.00 | $3,500.00 |
$17,500.00
| $4,033.33 | $3,950.00 |
500.00.015 | VIDEO INSPECTION |
0.21
| 1 | LS | $30,000.00 | $5,000.00 |
$5,000.00
| $11,433.33 | $11,000.00 |
601.09.017 | FLASHING ARROW SIGN |
0.39
| 4 | EA | $3,000.00 | $2,360.00 |
$9,440.00
| $3,226.67 | $2,430.00 |
601.09.019 | CHANGEABLE MESSAGE SIGN |
1.61
| 4 | EA | $5,000.00 | $9,800.00 |
$39,200.00
| $5,383.33 | $5,400.00 |
900.02.005 | PUMP WELL ASSEMBLY, TOP DRAINING,STD PLAN W-53, STYLE A |
1.09
| 5 | EA | $9,000.00 | $5,300.00 |
$26,500.00
| $6,983.33 | $5,250.00 |
| CATHODIC PROTECTION ANODE AND TEST STATION |
0.86
| 4 | EA | $5,500.00 | $5,200.00 |
$20,800.00
| $4,546.67 | $4,000.00 |
| INTERCONNECTION TO EXISTING WATERMAIN |
1.92
| 3 | EA | $15,000.00 | $15,500.00 |
$46,500.00
| $15,100.00 | $15,250.00 |
| JOBS COORDINATOR (ALLOWANCE OF $10,000) |
0.41
| 10000 | AL | $1.00 | $1.00 |
$10,000.00
| $1.00 | $1.00 |
| AC PAVEMENT(SURFACE COURSE) |
4.78
| 790 | TON | $115.00 | $147.00 |
$116,130.00
| $124.00 | $122.50 |
| 36" STEEL CASING |
1.95
| 83 | LF | $500.00 | $570.00 |
$47,310.00
| $507.50 | $500.00 |
| CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $35,000) |
1.44
| 35000 | AL | $1.00 | $1.00 |
$35,000.00
| $1.00 | $1.00 |
| 24" WATERMAIN, 0.25" THICK STEEL, CML&C, WELDED |
60.17
| 5331 | LF | $384.00 | $274.00 |
$1,460,694.00
| $350.00 | $335.50 |
| TRAFFIC CONTROL - STAGE 4 |
1.03
| 1 | LS | $25,000.00 | $25,000.00 |
$25,000.00
| $17,276.67 | $19,330.00 |
| TRAFFIC CONTROL - STAGE 1 |
1.03
| 1 | LS | $15,000.00 | $25,000.00 |
$25,000.00
| $17,721.67 | $20,665.00 |
| TRAFFIC CONTROL - STAGE 2 |
1.03
| 1 | LS | $20,000.00 | $25,000.00 |
$25,000.00
| $16,801.67 | $17,905.00 |
| TRAFFIC CONTROL - STAGE 3 |
1.03
| 1 | LS | $20,000.00 | $25,000.00 |
$25,000.00
| $17,710.00 | $20,630.00 |
| TRENCH BACKFILL SLURRY (CLASS 140-S-100) |
9.05
| 2113 | CY | $150.00 | $104.00 |
$219,752.00
| $124.17 | $112.00 |
| 12" WATERMAIN, 0.25" THICK STEEL, CML&C |
0.27
| 35 | LF | $320.00 | $184.00 |
$6,440.00
| $416.33 | $425.00 |
| Total Percent | 100 | | | | Total Amount | $2,427,548.60 | | |