Bid Price History

Avenue K Transmission Main Phase IV 20th Street East to 30th Street East
$2,427,548.60
10/23/2018
4106 (D1),4106 (F1),4106 (E1)
6
* Non-standard items are shaded yellow

Item CodeDescription% of Total ProjectQuantityUnitEngineer's EstimateLow Bidder Item BidAmountAverage Item BidMedian Item Bid
001.06.001CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $3,000) 0.12 1LS$3,000.00$3,000.00 $3,000.00 $3,000.00$3,000.00
001.06.006CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500/MONTH) 0.12 6MTH$500.00$500.00 $3,000.00 $500.00$500.00
001.06.009CONSTRUCTION SCHEDULE (AS-BUILT) (STIPULATED UNIT PRICE OF $1,000) 0.04 1LS$1,000.00$1,000.00 $1,000.00 $1,000.00$1,000.00
001.07.003IMPLEMENTATION OF BMPS 0.44 1LS$20,000.00$10,600.00 $10,600.00 $16,350.00$9,300.00
001.07.021SHORING OF OPEN EXCAVATIONS 0.29 1LS$120,000.00$7,000.00 $7,000.00 $49,662.83$44,000.00
001.08.005OFFICE FACILITIES 0.99 6MTH$5,000.00$4,000.00 $24,000.00 $4,883.33$4,000.00
001.09.003MOBILIZATION 4.53 1LS$170,000.00$110,000.00 $110,000.00 $105,802.67$105,000.00
302.01.007COLD MILL AC PAVEMENT (> 1-1/2 - 3") 1.05 65340SF$0.60$0.39 $25,482.60 $0.47$0.40
306.01.221AIR RELEASE AND VACUUM VALVE ASSEMBLY, 4" 1.88 4EA$13,000.00$11,400.00 $45,600.00 $11,883.33$11,700.00
306.01.225BUTTERFLY VALVE, 150 PSI WWP, 24" 1.55 4EA$10,000.00$9,400.00 $37,600.00 $12,300.00$13,200.00
306.01.227GATE VALVE, 200 PSI WWP, 12" 0.72 5EA$3,500.00$3,500.00 $17,500.00 $4,033.33$3,950.00
500.00.015VIDEO INSPECTION 0.21 1LS$30,000.00$5,000.00 $5,000.00 $11,433.33$11,000.00
601.09.017FLASHING ARROW SIGN 0.39 4EA$3,000.00$2,360.00 $9,440.00 $3,226.67$2,430.00
601.09.019CHANGEABLE MESSAGE SIGN 1.61 4EA$5,000.00$9,800.00 $39,200.00 $5,383.33$5,400.00
900.02.005PUMP WELL ASSEMBLY, TOP DRAINING,STD PLAN W-53, STYLE A 1.09 5EA$9,000.00$5,300.00 $26,500.00 $6,983.33$5,250.00
 CATHODIC PROTECTION ANODE AND TEST STATION 0.86 4EA$5,500.00$5,200.00 $20,800.00 $4,546.67$4,000.00
 INTERCONNECTION TO EXISTING WATERMAIN 1.92 3EA$15,000.00$15,500.00 $46,500.00 $15,100.00$15,250.00
 JOBS COORDINATOR (ALLOWANCE OF $10,000) 0.41 10000AL$1.00$1.00 $10,000.00 $1.00$1.00
 AC PAVEMENT(SURFACE COURSE) 4.78 790TON$115.00$147.00 $116,130.00 $124.00$122.50
 36" STEEL CASING 1.95 83LF$500.00$570.00 $47,310.00 $507.50$500.00
 CITY PERMIT AND INSPECTION FEES (ALLOWANCE OF $35,000) 1.44 35000AL$1.00$1.00 $35,000.00 $1.00$1.00
 24" WATERMAIN, 0.25" THICK STEEL, CML&C, WELDED 60.17 5331LF$384.00$274.00 $1,460,694.00 $350.00$335.50
 TRAFFIC CONTROL - STAGE 4 1.03 1LS$25,000.00$25,000.00 $25,000.00 $17,276.67$19,330.00
 TRAFFIC CONTROL - STAGE 1 1.03 1LS$15,000.00$25,000.00 $25,000.00 $17,721.67$20,665.00
 TRAFFIC CONTROL - STAGE 2 1.03 1LS$20,000.00$25,000.00 $25,000.00 $16,801.67$17,905.00
 TRAFFIC CONTROL - STAGE 3 1.03 1LS$20,000.00$25,000.00 $25,000.00 $17,710.00$20,630.00
 TRENCH BACKFILL SLURRY (CLASS 140-S-100) 9.05 2113CY$150.00$104.00 $219,752.00 $124.17$112.00
 12" WATERMAIN, 0.25" THICK STEEL, CML&C 0.27 35LF$320.00$184.00 $6,440.00 $416.33$425.00
 Total Percent100   Total Amount$2,427,548.60