| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 4 | IMPLEMENTATION OF BMPS | 1.00 | LS |
0.90
| 0.00 | 0.90 | $20,000.00 | $18,000.00 |
| 6 | TREE REMOVAL (25"+ DIAMETER) | 2.00 | EA |
2.00
| 0.00 | 2.00 | $1,100.00 | $2,200.00 |
| 7 | CROWN REDUCTION, TREE (25" + DIAMETER) | 3.00 | EA |
1.00
| 0.00 | 1.00 | $1,300.00 | $1,300.00 |
| 8 | CONCRETE REMOVAL (NON-REINFORCED) | 52.00 | CY |
52.00
| 0.00 | 52.00 | $177.00 | $9,204.00 |
| 9 | UNCLASSIFIED EXCAVATION | 880.00 | CY |
880.00
| 0.00 | 880.00 | $64.00 | $56,320.00 |
| 10 | CRUSHED MISCELLANEOUS BASE | 586.00 | CY |
586.00
| 0.00 | 586.00 | $40.00 | $23,440.00 |
| 11 | AC PAVEMENT | 530.00 | TON |
530.00
| 0.00 | 530.00 | $97.00 | $51,410.00 |
| 12 | PCC CURB & GUTTER, TYPE A2-8 | 440.00 | LF |
414.00
| 0.00 | 414.00 | $25.60 | $10,598.40 |
| 13 | PCC CURB & GUTTER, TYPE A3-8 | 440.00 | LF |
440.00
| 0.00 | 440.00 | $25.60 | $11,264.00 |
| 14 | PCC WALK, 4" THICK | 240.00 | SF |
240.00
| 0.00 | 240.00 | $12.00 | $2,880.00 |
| 16 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 0.00 | 1.00 | $61,083.00 | $61,083.00 |
| 17 | TEMPORARY CRASH CUSHION ARRAY | 3.00 | EA |
3.00
| 0.00 | 3.00 | $1,200.00 | $3,600.00 |
| 18 | TEMPORARY RAILING (TYPE K) | 1,160.00 | LF |
800.00
| 0.00 | 800.00 | $30.00 | $24,000.00 |
| 19 | FLASHING ARROW SIGN | 4.00 | EA |
4.00
| 0.00 | 4.00 | $600.00 | $2,400.00 |
| 20 | CHANGEABLE MESSAGE SIGN | 2.00 | EA |
2.00
| 0.00 | 2.00 | $1,200.00 | $2,400.00 |
| 21 | LOCAL DEPRESSION PER STD PLAN 313, CASE E, & DETAIL "A" | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,600.00 | $2,600.00 |
| 22 | LOCAL DEPRESSION PER STD PLAN 313, CASE E, & DETAIL "B" | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,600.00 | $2,600.00 |
| 23 | MULTI-AXIAL GEOGRID | 3,600.00 | SY |
3,560.00
| 0.00 | 3,560.00 | $5.35 | $19,046.00 |
| S-1 | REGRADE BASE | | LS |
1.00
| 0.00 | 1.00 | $1,880.00 | $1,880.00 |
| S-2 | REMOVE THICKER ASPHALT SECTION | | LS |
1.00
| 0.00 | 1.00 | $10,500.00 | $10,500.00 |
|