| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 1 | CONSTRUCTION SCHEDULE (BASELINE) (STIPULATED UNIT PRICE OF $1,000) | 1.00 | LS |
1.00
| 0.00 | 1.00 | $1,000.00 | $1,000.00 |
| 3 | CLEARING AND GRUBBING | 1.00 | LS |
0.80
| 0.00 | 0.80 | $10,000.00 | $8,000.00 |
| 4 | CONCRETE REMOVAL (NON-REINFORCED) | 1.00 | CY |
1.00
| 0.00 | 1.00 | $400.00 | $400.00 |
| 8 | STRUCTURE CONCRETE (FOOTING) | 20.00 | CY |
12.00
| 0.00 | 12.00 | $325.00 | $3,900.00 |
| 10 | SOLAR ELECTRIC POWER ASSEMBLY | 2.00 | EA |
0.15
| 0.00 | 0.15 | $16,500.00 | $2,475.00 |
| 13 | TRENCHING AND SLEEVES FOR ELECTRICAL CONDUIT | 60.00 | LF |
60.00
| 0.00 | 60.00 | $18.00 | $1,080.00 |
| 15 | 1" ELECTROLIER LIGHTING CONDUIT | 70.00 | LF |
60.00
| 0.00 | 60.00 | $40.00 | $2,400.00 |
| 17 | TRAFFIC CONTROL | 1.00 | LS |
0.25
| 0.00 | 0.25 | $9,400.00 | $2,350.00 |
| 19 | CHANGEABLE MESSAGE SIGN | 1.00 | EA |
1.00
| 0.00 | 1.00 | $2,900.00 | $2,900.00 |
| 26 | ROCK VENEER ON MORTAR BED | 299.00 | SF |
50.00
| 0.00 | 50.00 | $18.00 | $900.00 |