| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500.00/MTH) | 9.00 | MTH |
5.00
| 4.00 | 1.00 | $500.00 | $500.00 |
| 5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.30
| 0.24 | 0.06 | $112,000.00 | $6,720.00 |
| 8 | IMPLEMENTATION OF THE SURFACE WATER DIVERSION PLAN | 6.00 | MTH |
3.00
| 2.00 | 1.00 | $320.00 | $320.00 |
| 9 | SURFACE WATER DIVERSION STRUCTURE (STAGE ONE) | 1.00 | LS |
0.96
| 0.95 | 0.01 | $100,000.00 | $1,000.00 |
| 18 | IMPLEMENTATION OF THE SSHSP | 9.00 | MTH |
5.00
| 4.00 | 1.00 | $35.00 | $35.00 |
| 19 | OFFICE FACILITIES | 9.00 | MTH |
5.00
| 4.00 | 1.00 | $5,000.00 | $5,000.00 |
| 20 | MOBILIZATION | 1.00 | LS |
0.95
| 0.75 | 0.20 | $500,000.00 | $100,000.00 |
| 22 | RELOCATE EXISTING BUS SHELTER | 1.00 | EA |
1.00
| 0.90 | 0.10 | $6,000.00 | $600.00 |
| 25 | REINFORCED CONCRETE REMOVAL AT EXISTING PARKING STRUCTURE | 2.00 | CY |
2.00
| 0.00 | 2.00 | $1,800.00 | $3,600.00 |
| 26 | CMU WALL AND FOUNDATION REMOVAL AT EXISTING PARKING STRUCTURE | 15.00 | LF |
15.00
| 0.00 | 15.00 | $260.00 | $3,900.00 |
| 27 | METAL RAIL REMOVAL AT EXISTING PARKING STRUCTURE | 25.00 | LF |
25.00
| 0.00 | 25.00 | $18.00 | $450.00 |
| 28 | BRIDGE REMOVAL (STAGE ONE) | 1.00 | LS |
0.75
| 0.60 | 0.15 | $150,000.00 | $22,500.00 |
| 30 | TEMPORARY VERTICAL SHORING (STAGE ONE) | 1.00 | LS |
0.80
| 0.09 | 0.71 | $225,000.00 | $159,750.00 |
| 32 | TEMPORARY BALLAST (STAGE ONE) | 1.00 | LS |
0.76
| 0.75 | 0.01 | $30,000.00 | $300.00 |
| 34 | TEMPORARY UTILITY SUPPORT (AT&T CONDUITS) | 1.00 | LS |
0.75
| 0.08 | 0.67 | $60,000.00 | $40,200.00 |
| 36 | STRUCTURE EXCAVATION (BRIDGE) | 2,170.00 | CY |
730.00
| 0.00 | 730.00 | $37.00 | $27,010.00 |
| 72 | PCC CURB RAMP, 4" THICK | 22.00 | SF |
306.00
| 22.00 | 284.00 | $18.00 | $5,112.00 |
| 77 | CONSTRUCT BENCAMP STREET DETOUR RAMP (PLAN RD, SHEET 4) | 1.00 | LS |
1.00
| 0.90 | 0.10 | $104,000.00 | $10,400.00 |
| 93 | TRAFFIC CONTROL (STAGE 2, PHASE 1) | 1.00 | LS |
0.60
| 0.50 | 0.10 | $2,100.00 | $210.00 |
| 97 | TEMPORARY RAILING (TYPE K) | 500.00 | LF |
315.00
| 306.00 | 9.00 | $31.00 | $279.00 |
| 99 | FLASHING ARROW SIGN | 2.00 | EA |
1.14
| 1.07 | 0.07 | $5,300.00 | $371.00 |
| 100 | CHANGEABLE MESSAGE SIGN | 3.00 | EA |
1.28
| 1.21 | 0.07 | $15,500.00 | $1,085.00 |
| S-6 | RELOCATE FIRE HYDRANT ON ABBOT AVE BY SGCWD | | T&M |
8,328.27
| 0.00 | 8,328.27 | $1.00 | $8,328.27 |
| S-20 | HANDICAP RAMPS AT PARK & RIDE | | T&M |
8,325.39
| 0.00 | 8,325.39 | $1.00 | $8,325.39 |