| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 4 | CONCRETE REMOVAL (NON-REINFORCED) | 1.00 | CY |
1.21
| 1.00 | 0.21 | $400.00 | $84.00 |
| 5 | UNCLASSIFIED EXCAVATION | 50.00 | CY |
96.88
| 50.00 | 46.88 | $20.00 | $937.60 |
| 10 | SOLAR ELECTRIC POWER ASSEMBLY | 2.00 | EA |
2.00
| 0.25 | 1.75 | $16,500.00 | $28,875.00 |
| 11 | SOLAR LIGHTING | 8.00 | EA. |
8.00
| 4.00 | 4.00 | $600.00 | $2,400.00 |
| 13 | TRENCHING AND SLEEVES FOR ELECTRICAL CONDUIT | 60.00 | LF |
110.00
| 60.00 | 50.00 | $18.00 | $900.00 |
| 14 | 3/4" ELECTROLIER LIGHTING CONDUIT | 130.00 | LF |
163.00
| 130.00 | 33.00 | $22.00 | $726.00 |
| 16 | CONCRETE PULL BOX | 4.00 | EA |
5.00
| 4.00 | 1.00 | $400.00 | $400.00 |
| 17 | TRAFFIC CONTROL | 1.00 | LS |
1.00
| 0.95 | 0.05 | $9,400.00 | $470.00 |
| 18 | FLASHING ARROW SIGN | 1.00 | EA |
1.00
| 0.95 | 0.05 | $1,600.00 | $80.00 |
| 21 | FURNISH AND INSTALL SIGN | 8.00 | EA |
11.00
| 8.00 | 3.00 | $1,500.00 | $4,500.00 |
| 26 | ROCK VENEER ON MORTAR BED | 299.00 | SF |
409.00
| 400.99 | 8.01 | $18.00 | $144.18 |
| 27 | GALVANIZED POST W/ BASE PLATE, 3" O.D. | 1,710.00 | LB |
1,716.00
| 1,710.00 | 6.00 | $7.50 | $45.00 |
| 28 | BOULDER | 6.00 | EA |
9.00
| 6.00 | 3.00 | $400.00 | $1,200.00 |
| S-2 | FURNISH ONE EXTRA SIGN EACH | | LS |
1.00
| 0.00 | 1.00 | $475.00 | $475.00 |