| Item No. | Description | Bid Qty | Units | Total Qty. | Previous Qty. | Current Qty. | Unit Price | Current Amount |
| 2 | CONSTRUCTION SCHEDULE (UPDATE) (STIPULATED UNIT PRICE OF $500.00/MTH) | 9.00 | MTH |
11.00
| 10.00 | 1.00 | $500.00 | $500.00 |
| 5 | IMPLEMENTATION OF THE SWPPP | 1.00 | LS |
0.66
| 0.60 | 0.06 | $112,000.00 | $6,720.00 |
| 10 | SURFACE WATER DIVERSION STRUCTURE (STAGE TWO) | 1.00 | LS |
0.95
| 0.00 | 0.95 | $65,000.00 | $61,750.00 |
| 14 | EXCAVATION, TRANSPORTATION, AND DISPOSAL OF LEAD CONTAMINATED SOIL | 78.00 | TON |
95.00
| 78.00 | 17.00 | $130.00 | $2,210.00 |
| 16 | REMOVAL AND DISPOSAL OF LBP/LCP | 1.00 | LS |
0.95
| 0.40 | 0.55 | $54,000.00 | $29,700.00 |
| 18 | IMPLEMENTATION OF THE SSHSP | 9.00 | MTH |
11.00
| 10.00 | 1.00 | $35.00 | $35.00 |
| 20 | MOBILIZATION | 1.00 | LS |
1.00
| 0.95 | 0.05 | $500,000.00 | $25,000.00 |
| 21 | CLEARING AND GRUBBING | 1.00 | LS |
0.75
| 0.50 | 0.25 | $8,000.00 | $2,000.00 |
| 23 | CONCRETE REMOVAL (NON-REINFORCED) | 760.00 | CY |
171.00
| 170.00 | 1.00 | $60.00 | $60.00 |
| 29 | BRIDGE REMOVAL (STAGE TWO) | 1.00 | LS |
0.60
| 0.35 | 0.25 | $100,000.00 | $25,000.00 |
| 31 | TEMPORARY VERTICAL SHORING (STAGE TWO) | 1.00 | LS |
0.70
| 0.46 | 0.24 | $200,000.00 | $48,000.00 |
| 33 | TEMPORARY BALLAST (STAGE TWO) | 1.00 | LS |
0.75
| 0.00 | 0.75 | $10,000.00 | $7,500.00 |
| 36 | STRUCTURE EXCAVATION (BRIDGE) | 2,170.00 | CY |
1,538.50
| 907.00 | 631.50 | $37.00 | $23,365.50 |
| 94 | TRAFFIC CONTROL (STAGE 2, PHASE 2) | 1.00 | LS |
0.70
| 0.60 | 0.10 | $2,400.00 | $240.00 |
| 97 | TEMPORARY RAILING (TYPE K) | 500.00 | LF |
525.00
| 500.00 | 25.00 | $31.00 | $775.00 |
| 99 | FLASHING ARROW SIGN | 2.00 | EA |
1.56
| 1.49 | 0.07 | $5,300.00 | $371.00 |
| 100 | CHANGEABLE MESSAGE SIGN | 3.00 | EA |
1.70
| 1.63 | 0.07 | $15,500.00 | $1,085.00 |
| 162 | PAVEMENT MARKINGS (ONE-COAT PAINT) | 178.00 | SF |
326.00
| 178.00 | 148.00 | $4.00 | $592.00 |
| 167 | 12" STRIPING (ONE-COAT PAINT) | 355.00 | LF |
388.00
| 355.00 | 33.00 | $3.00 | $99.00 |
| S-14 | 3-12" LED VEHICLE HEAD | | EA |
9.00
| 0.00 | 9.00 | $840.00 | $7,560.00 |
| S-15 | LED COUNTDOWN PEDESTRIAN HEAD | | EA |
4.00
| 0.00 | 4.00 | $787.50 | $3,150.00 |
| S-16 | PEDESTRIAN PUSH BUTTON | | EA |
4.00
| 0.00 | 4.00 | $388.50 | $1,554.00 |
| S-17 | PEDESTRIAN PUSH BUTTON PLATE | | EA |
4.00
| 0.00 | 4.00 | $42.00 | $168.00 |
| S-18 | LED LUMINAIRES (200W HPS EQUIVALENT) | | EA |
4.00
| 0.00 | 4.00 | $1,260.00 | $5,040.00 |
| S-36 | MISSING TRAFFIC SIGNAL ITEMS | | LS |
1.00
| 0.00 | 1.00 | $16,132.78 | $16,132.78 |
| S-37 | CONDUIT MODIFICATION (COUPLING, GRC, J-BOXES | | LS |
1.00
| 0.00 | 1.00 | $6,000.00 | $6,000.00 |
| S-39 | OFFICE FACILITY | | MTH |
0.50
| 0.00 | 0.50 | $2,500.00 | $1,250.00 |
| S-40 | IMPLEMENTATION OF SURFACE WATER DIVERSION PLAN PHASE 2 | | MTH |
1.00
| 0.00 | 1.00 | $1,342.42 | $1,342.42 |